04-29-2008 11:18 AM
hi ,
i want calculate the material consumed for last one year ,
i fetched data from MVER table, it has data like weekly,monthly,daily..consumption.
for some records it has both weekly and monthly. how do i calculate the consumption for last 52 weeks.
thanks in advace,
rgards,
chandu.
04-29-2008 11:24 AM
The T code for viewing the standard report for
Material Analysis - MCP5.
Production Order - MCP3.
Material Usage Analysis - MCRE.
In Addition to these T code's in REM - Repetitive Manufacturing,
MCP9 - Run Schedule Schedule Header(For GR & Scrap).
But for getting this report ,check whether in T code OMOD - Updating Shop Floor Control - Info Structures .
For Info Structure S026, Material Usage the updation is included.
04-29-2008 11:24 AM
The T code for viewing the standard report for
Material Analysis - MCP5.
Production Order - MCP3.
Material Usage Analysis - MCRE.
In Addition to these T code's in REM - Repetitive Manufacturing,
MCP9 - Run Schedule Schedule Header(For GR & Scrap).
But for getting this report ,check whether in T code OMOD - Updating Shop Floor Control - Info Structures .
For Info Structure S026, Material Usage the updation is included.