on 01-14-2015 10:01 AM
Hello Experts,
End user confirmed Maintenance order type EU01 (for utilization) and then cancel the confirmation using IW45 transaction code, confirmation got canceled but actual cost did not reversed during this process. This has been done twice. Instead of reverse, the actual cost got double the planed cost.
Screen shots are attached for the reference, Same scenario i tried on Quality server and it is working fine, trying to figure out why it did not worked on PRD. Please suggest some solution. Thanks in advance.
Operatins:
Cost:
Rep. Plan/Act
Cancel order IW43:
Amit,
Have a look in IW46 to see if there's an entry for your confirmation.
PeteA
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Amit,
This might be a non-valued question.
Did any changes are done in control key relevant for costing ?
Regards
Terence
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Amit,
i assume there should be some code inserted . As per standard cost would be released from actual when ever you do cancellation
Please check if any exit applied
thanks
santosh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Greetings Amit,
Have you already tried to regenerate PMCO entries for that order with t-code OLI5 / report RIPMCO00 ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.