Dear Valter,
Every cost center should be assigned to a Standard Structure (OKEON).
In the background, the Standard Structure is also a Cost Center Group where you can manage thru KSH1, KSH2 and KSH3.
In the KSH2 you have two options to manage the Sbu-nodes and Cost Centers:
- You can delete them or remove them:
If you delete, the Group will be unassigned and deleted. So I recommend you to remove only, to unassign only.
I hope this helps you.
Best regards,
Gabriel Coleti