on 05-30-2014 4:48 AM
Hi SAP Gurus,
Need your help,
is there any other way to maintain the characteristic value combinations for materail and user facing the below problem while running the MC94
no characteristic value combinations exist for the selected data
For above error we proposed the solution MC62 to maintain the characteristic value or Planning Hierarchy .
but client is saying that we never use the MC62 t code so for..to maintain the characteristic value or Planning Hierarchy other material .
Can you please anybody let me know the steps and other way to maintain the characteristic value combinations or Planning Hierarchy for material .
Thank you very much.
Regards
Sudharsana
Hi
MC59 is another transaction to maintain planning hierarchy.
you can use this as an alternative to MC61 or MC62, and SAP doesn't recommend this as its a direct table entry
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Friends,
Any sugesstions please.
Thank you very much.
Regards
Sudharsana Vamsi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi All,
Any sugesstions please.
thank you.
Regards
Sudharsana Vamsi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi All,
Any Sugesstions please.
Regards
asuvamsi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
for materials no planning Hierarchy is required as it is the lowest level. first check the info structure created for the planning type used...if there are characteristics other than material then system will ask for characteristic value combinations..
Plz check the below document for flexible planning...
Thanks
Kumar
Thanks for your reply Kumar....
If i go to MC62..so many materails are available , Can please let me know ..how it is howing in MC62 and there any assignment in Materail master to assign the planning type. and also business saying that ...the below materails they didnot maitained through MC62...with out maintained through MC62..how system will shows here
Kindly advise
Hi,
my assumption is correct...characteristics are only two... plant and material...for this they maintained all the materials through MC61...and it is one time activity...no issues...
Now when you are doing planning through MC94..you have to plan at material level only....check once and come back...if possible share the screen shots of MC94.. how you are doing planning...
Thanks
Kumar
Hi Kumar
Any updates..
Its really appreciate your prompt reply.
We have given same solution to business but they are saying that we never use T .code MC62 and they are asking, How previous material maintain in MC62 t.code.
So kindly provide table or t.code to check the changes and how it maintained in T code – MC61 and MC62,
So that we will track the list and send to business.
You can check in my initial requirement.
Thanks
regards
asuvamsi
User | Count |
---|---|
104 | |
14 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.