How to transfer planned activity requirements for production(t-code :KSPP)

Former Member
0 Kudos

Hi..

I planned that I produced 18 product on 2014-10-31 in long-term planning as below picture.

But Activity Qty wasn't transferred to Period 10 as below picture.

I want to know the cause and the logic for t-code KSPP.


Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

I know that the cause is a Processing formula in work center master’s scheduling tab.

Formula for the duration of processing time

Formula used in scheduling to determine the operation processing time.

Dependencies

If you do not enter a formula, the system uses a processing time of zero for scheduling.

Answers (1)

Answers (1)

robin_mcgee
Active Participant
0 Kudos

Hi,

Please check previous thread:

http://scn.sap.com/thread/1792182

Regards,

Robin