Abstract
When converting to SAP S/4HANA, the preparation activities are the key to the success of the project. If the preparation activities are incomplete, SUM verifies this during its run and throws error messages. If the error is severe (such as return code 12), SUM stops running in the first phase. If the severity is low (such as return code 8 or 7), SUM stops or sends a message during its third or fourth phase.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to APress Media, LLC, part of Springer Nature
About this chapter
Cite this chapter
Subrahmanyam, R.S. (2022). Preparation Phase (Preparations in SAP ECC System Before SUM) – Part 1. In: SAP S/4HANA Conversion. Apress, Berkeley, CA. https://doi.org/10.1007/978-1-4842-8091-1_5
Download citation
DOI: https://doi.org/10.1007/978-1-4842-8091-1_5
Published:
Publisher Name: Apress, Berkeley, CA
Print ISBN: 978-1-4842-8090-4
Online ISBN: 978-1-4842-8091-1
eBook Packages: Business and ManagementBusiness and Management (R0)Apress Access Books