Skip to main content

Preparation Phase (Preparations in SAP ECC System Before SUM) – Part 1

  • Chapter
  • First Online:
SAP S/4HANA Conversion
  • 1122 Accesses

Abstract

When converting to SAP S/4HANA, the preparation activities are the key to the success of the project. If the preparation activities are incomplete, SUM verifies this during its run and throws error messages. If the error is severe (such as return code 12), SUM stops running in the first phase. If the severity is low (such as return code 8 or 7), SUM stops or sends a message during its third or fourth phase.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 34.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 44.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2022 The Author(s), under exclusive license to APress Media, LLC, part of Springer Nature

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Subrahmanyam, R.S. (2022). Preparation Phase (Preparations in SAP ECC System Before SUM) – Part 1. In: SAP S/4HANA Conversion. Apress, Berkeley, CA. https://doi.org/10.1007/978-1-4842-8091-1_5

Download citation

Publish with us

Policies and ethics