Washington Dulles Airport Automated People Mover System

Washington Dulles Airport Automated People Mover System

The Washington Dulles International Airport Automated People Mover (APM) connects the Main Terminal, Concourse A/B, and Concourse C/D via approximately 11,400 feet of dual- lane underground guideway. The system has four stations and an at-grade Maintenance & Storage Facility.

During the design phase LBTC was responsible for the following:

  • Development of technical project with deliverable documentation
  • Design and design coordination for the Audio & Visual Communications System
  • Design coordination for the Automated Train Control system
  • Category: Design and Project Delivery
  • Share This Project: