Leveraging SAP to Support Reliability
Analytics
Chris Zawislak & Mike Poland
ConAgra Foods, Inc Life Cycle Engineering, Inc.
• ConAgra Overview
• Taxonomy
• Criticality
• Workflows
• Key points to take home
• Questions
What I’ll Cover
ConAgra Foods overview
Slide 3
ConAgra Foods started in 1919 as Nebraska Consolidated Mills. In 1971 it was renamed
ConAgra, Inc., and the company became ConAgra Foods in 2000.
ConAgra Foods is a Fortune 500 company with more than 24,000 employees, with the
company’s world headquarters located in Omaha, Neb.
ConAgra Foods is one of North America’s leading food companies, with brands in 97 percent
of America’s households.
In fiscal year 2010, ConAgra Foods brought in $12+ billion in net sales.
“From the earth” to food you love 
ConAgra Foods Brands
Introduction & Overview
Executive Vision
• Leverage CPS to
improve performance
• Leverage SAP to drive
cost down
Situation
• 2007 PM Pillar established
• Working to establish foundation (PM Step 1)
• Implemented SAP across consumer plants
• Currently working to develop reliability competencies
• SAP configuration was adequate to support foundation
but requires optimization to support reliability analytics
and other continuous improvement activities
SAP PM
Risk Analysis
Failure Mode and
Effect Analysis
Severity of
Failure
Likelihood of
Occurrence
Delectability of
Failure
Risk Ranking Control Plans
Reliability
Analysis
Asset Module of
EAM
Continuous Improvement
Functional
Hierarchy
Criticality
Analysis
Reliability Maturity
Action
Create a Reliability Center of Excellence
• Reliability Action Team
• Reliability Focus Team
• Reliability Engineering function and resource
development
• Reliability Infrastructure – SAP Configuration
 Taxonomy
 Criticality
 Workflows
•Learning to See
Process Flow Diagram
Value Stream Mapping
Relationship Models
Equipment Criticality
Failure Analysis
Risk Analysis
Risk Ranking
Standard Work
Operating Procedures
Preventive
Predictive
Condition Monitoring
Remote Monitoring
Operator Care
Critical Spares
OEE
TCO
Asset Utilization
MTBF
MTTR
OPERATIONAL STABILITY
MeasureControlAnalyzeClassify
Continuous Improvement
Plan Do Check Act
Reliability Infrastructure
Slide 11
Taxonomy
“Systematic classification of items into generic groups
based on factors possibly common to several of the
items”
ISO 14224, Petroleum and natural gas industries — Collection and
exchange of reliability and maintenance data for equipment
Slide 12
Hierarchy
(1)
Business
Category
(2)
Installation/
Business Unit
(3)
Cost Center/ Op Unit
(4)
Function
(5)
System/ Process Line
(6)
Sub system/Asset/Equipment
(7)
Component/Maintainable Item
(8)
Part/ BOM
Use/LocationDataEquipmentSubdivision
Taxonomy per ISO 14224:2006
Functional Block Diagram
In Feed Assembly Out feed AssemblyFill Table
Shaker
VFD
Drive Unit
PLC
Rotary Filler – Technical Object
Objects
FMEA to SAP
Slide 14
FAILURE MODE
(FUNCTIONAL FAILURE) POTENTIAL CAUSE(S) CURRENT CONTROL(S)
SEVERITY
PROBABILITY
DETECTION
RISK PRIORITY NUMBER
STRATEGY:
CM ‐ Corrective 
(RTF)
PM ‐ Time Based
CBM ‐ Condition 
Based
MOD ‐ 
Modification
THERMOGRAPHY
VIBRATION ANALYSIS
ULTRASOUND
OIL ANALYSIS
MOTOR CIRCUIT ANALYSIS
TEMPERATURE READING
INSPECTION
LUBRICATION
SCHEDULED REBUILD
SCHEDULED REPLACEMENT
ROUTINE CLEANING
AMD CLEANING
AMD INSPECTION
AMD LUBRICATION
CSD VALIDATION
RUN TO FAILURE
DINNER OUT OF POSITION AND OR DOES NOT TRANSFER LUG MISALIGNMENT DAILY PM INSPECTION 3 2 2 12 CBM D
CHAIN STRETCH DAILY PM INSPECTION, AUTO LUBE 8 2 1 16 CBM D
RAIL MISALIGNMENT DAILY PM INSPECTION 3 2 2 12 CBM D
SERVO MOTOR FAILURE 1W PM INSPECTION (VISUAL) 5 4 9 180 CBM 1M 1W
PHOTO EYE FAILURE (2) NONE 3 5 7 105 PM 1M
DRIVE CHAIN FAILURE 1W PM INSPECTION (VISUAL) 4 2 3 24 CBM 1W
DRIVE SPROCKET WORN 1W PM INSPECTION (VISUAL) 4 2 3 24 CBM 1W
LUG CHAIN CONTAMINATION (PRODUCT FALLING) NONE 2 5 9 90 MOD
DINNER NOT IN 4 X 5 MATRIX RAIL MISALIGNMENT INFORMAL PM DAILY INSPECTION 3 2 4 24 MOD
BELT CONTAMINATION NONE 3 8 8 192 MOD
SERVO MOTOR FAILURE NONE 5 4 9 180 CM, POSSIBLE MOD
BELT DRIVE GEAR(2) FAILURE (ONE PLASTIC, ONE METAL) DAILY PM INSPECTION 4 2 2 16 CBM D
BELT TORN OR EXCESSIVELY WORN INFORMAL PM DAILY INSPECTION 3 3 3 27 CBM D
Damage Codes Cause Codes
Task Codes
Rotary Filler Catalog Profile
Code
Component
Description In feed Fill Table Out Feed Shaker Drive Unit VFD PLC
1001 Rail Misalignment X X
1002 Failed Bearing X X
1003 Worn Gear X X X X
1004 Air Leak X
1005 Failed Electrical Circuit X X X
1006 Failed Belt X X
1007 Programming Error
1008 Failed Belt X
1009 Failed Chain X
1010 Failed eye X X
Cause Code Catalog
Code
Component
Description In feed Fill Table Out Feed Shaker Drive Unit VFD PLC
2001 Process Stopped X X X X X X
2002 Process Slow X X X X X X
2003 Process Fast X X
2004 Over fill X X X X X
2005 Under fill X X
Damage Code Catalog
Rotary Filler Cause Code Group
Rotary Filler Task Code Group
Rotary Filler Damage Code Group
Maintenance Plan
Finding: ABC Indicator does provide adequate granularity for
equipment criticality
Result: Insufficient indicators provide requisite separation of assets for
prioritizing the application of corporate resources
Recommendation: Develop a criticality business process and RACI to
at least Base-10
There are 36 characters available in ABC Indicator which provide
considerable granularity but often only 3 are used….
Criticality Analysis
Slide 16
Criticality Analysis
• Single point failure
• Impact to value stream
• Impact to corporate objectives
• Replacement asset value
• Impact on reputation
• Impact on EHS
Criticality Analysis
Slide 18
RIME Index
Slide 19
Work Order Type
EquipmentCriticality
10 9 8 7 6 5 4 3 2 1
10 100 90 80 70 60 50 40 30 20 10
9 90 81 72 63 54 45 36 27 18 9
8 80 72 64 56 48 40 32 24 16 8
7 70 63 56 49 42 35 28 21 14 7
6 60 54 48 42 36 30 24 18 12 6
5 50 45 40 35 30 25 20 15 10 5
4 40 36 32 28 24 20 16 12 8 4
3 30 27 24 21 18 15 12 9 6 3
2 20 18 16 14 12 10 8 6 4 2
1 10 9 8 7 6 5 4 3 2 1
Workflow Optimization
Slide 20
Key Points to Take Home
• SAP configuration needs to mature along with your organization
• Collaboration between reliability, maintenance, and IT professionals is key
• Control strategy performance indicators should depend on work order accuracy
• Leverage FMEA for development of technical object catalogs as well as overall
control strategy
• FMEA and technical object catalogs are living documents and should be updated
when appropriate
• Criticality needs to be granular enough to support reliability analytics and backlog
management
• Task, damage, and cause codes are linked to equipment class for ease of
replication across the enterprise
Build or Migrate
Database
Risk Analysis
Failure Mode and
Effect Analysis
Severity of
Failure
Likelihood of
Occurrence
Detectability of
Failure
Risk Ranking Control Plans
Reliability
Analysis
Asset Module of
EAM
Continuous Improvement
Functional
Hierarchy
Criticality
Analysis
Close the Loop
Produced by:Platinum SponsorPremier Sponsor
Chris Zawislak, CMRP
ConAgra Foods, Inc.
Christopher.Zawislak@conagrafoods.com
Mike Poland, CMRP
Life Cycle Engineering, Inc.
MPoland@LCE.com
Produced by:Platinum SponsorPremier Sponsor
March 27 – 30, 2011
Hyatt Regency Huntington Beach Resort and Spa
Huntington Beach, California

More Related Content

What's hot

Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewMaximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewHelen Fisher
 
Plant maintenance system
Plant maintenance systemPlant maintenance system
Plant maintenance systemjincy joy
 
How Oracle Argus Safety 8.x Supports Product Safety Needs
How Oracle Argus Safety 8.x Supports Product Safety NeedsHow Oracle Argus Safety 8.x Supports Product Safety Needs
How Oracle Argus Safety 8.x Supports Product Safety NeedsPerficient, Inc.
 
Pm overview comprehensive_1
Pm overview comprehensive_1Pm overview comprehensive_1
Pm overview comprehensive_1Venu Vemula
 
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesMaximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesMaximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewMaximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Maximo Oil and Gas 7.6.1 HSE: Bypass Management OverviewMaximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Maximo Oil and Gas 7.6.1 HSE: Bypass Management OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview Helen Fisher
 
SAP EAM/PM Organization Structure
SAP EAM/PM Organization StructureSAP EAM/PM Organization Structure
SAP EAM/PM Organization StructureIITian Academy
 
Quick Look Video 01 29 11 Ws
Quick Look Video 01 29 11 WsQuick Look Video 01 29 11 Ws
Quick Look Video 01 29 11 WsJohnHoke
 
30632830 plant-maintenance-basics-course
30632830 plant-maintenance-basics-course30632830 plant-maintenance-basics-course
30632830 plant-maintenance-basics-coursevinayk_35919
 
ManageEngine ADAudit Plus - Active Directory audit software.
ManageEngine ADAudit Plus - Active Directory audit software.ManageEngine ADAudit Plus - Active Directory audit software.
ManageEngine ADAudit Plus - Active Directory audit software.Ashok Kumar
 
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewMaximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewHelen Fisher
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCEPANKAJ TIKEKAR
 
Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Helen Fisher
 
SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training Senthil kumar
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityJason Corder
 

What's hot (20)

Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewMaximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
 
Plant maintenance system
Plant maintenance systemPlant maintenance system
Plant maintenance system
 
How Oracle Argus Safety 8.x Supports Product Safety Needs
How Oracle Argus Safety 8.x Supports Product Safety NeedsHow Oracle Argus Safety 8.x Supports Product Safety Needs
How Oracle Argus Safety 8.x Supports Product Safety Needs
 
Pm overview comprehensive_1
Pm overview comprehensive_1Pm overview comprehensive_1
Pm overview comprehensive_1
 
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesMaximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
 
Maintenance 2sp
Maintenance 2spMaintenance 2sp
Maintenance 2sp
 
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesMaximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
 
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewMaximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
 
Maximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Maximo Oil and Gas 7.6.1 HSE: Bypass Management OverviewMaximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Maximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
 
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
 
SAP EAM/PM Organization Structure
SAP EAM/PM Organization StructureSAP EAM/PM Organization Structure
SAP EAM/PM Organization Structure
 
Quick Look Video 01 29 11 Ws
Quick Look Video 01 29 11 WsQuick Look Video 01 29 11 Ws
Quick Look Video 01 29 11 Ws
 
30632830 plant-maintenance-basics-course
30632830 plant-maintenance-basics-course30632830 plant-maintenance-basics-course
30632830 plant-maintenance-basics-course
 
ManageEngine ADAudit Plus - Active Directory audit software.
ManageEngine ADAudit Plus - Active Directory audit software.ManageEngine ADAudit Plus - Active Directory audit software.
ManageEngine ADAudit Plus - Active Directory audit software.
 
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewMaximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview
 
Bn1012 demo ppt sap pm
Bn1012 demo ppt sap pmBn1012 demo ppt sap pm
Bn1012 demo ppt sap pm
 
SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 

Similar to Leveraging SAP to Support Reliability Analytics

Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesSlideTeam
 
01_Team_03_CS_591_Project
01_Team_03_CS_591_Project01_Team_03_CS_591_Project
01_Team_03_CS_591_Projectharsh mehta
 
Supply Chain Council
Supply Chain CouncilSupply Chain Council
Supply Chain CouncilSergio Grisa
 
Elcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAMElcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAMSergio Grisa
 
Analytics in High Tech Electronics Supply Chain
Analytics in High Tech Electronics Supply ChainAnalytics in High Tech Electronics Supply Chain
Analytics in High Tech Electronics Supply ChainPartha Bose
 
Data Center Infrastructure Management Powerpoint Presentation Slides
Data Center Infrastructure Management Powerpoint Presentation SlidesData Center Infrastructure Management Powerpoint Presentation Slides
Data Center Infrastructure Management Powerpoint Presentation SlidesSlideTeam
 
Oracle eBS Overview.pptx
Oracle eBS Overview.pptxOracle eBS Overview.pptx
Oracle eBS Overview.pptxssuser9dce1e1
 
12 1-man-operation center-ug(2)
12 1-man-operation center-ug(2)12 1-man-operation center-ug(2)
12 1-man-operation center-ug(2)Ron DeLong
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Copperberg
 
Operations Management PowerPoint Presentation Slides
Operations Management PowerPoint Presentation SlidesOperations Management PowerPoint Presentation Slides
Operations Management PowerPoint Presentation SlidesSlideTeam
 
Operations Management Powerpoint Presentation Slides
Operations Management Powerpoint Presentation SlidesOperations Management Powerpoint Presentation Slides
Operations Management Powerpoint Presentation SlidesSlideTeam
 
Erp implementation process and introduction to dynamics 365
Erp implementation process and introduction to dynamics 365Erp implementation process and introduction to dynamics 365
Erp implementation process and introduction to dynamics 365AleksandarVarajic1
 
Demantra Case Study Doug
Demantra Case Study DougDemantra Case Study Doug
Demantra Case Study Dougsichie
 
IT Infrastructure Management Powerpoint Presentation Slides
IT Infrastructure Management Powerpoint Presentation SlidesIT Infrastructure Management Powerpoint Presentation Slides
IT Infrastructure Management Powerpoint Presentation SlidesSlideTeam
 
OIA administration
OIA administrationOIA administration
OIA administrationtechmeonline
 
CA Mainframe Resource Intelligence
CA Mainframe Resource IntelligenceCA Mainframe Resource Intelligence
CA Mainframe Resource IntelligenceCA Technologies
 
OracleappsBAEPresentationfinalshannononly
OracleappsBAEPresentationfinalshannononlyOracleappsBAEPresentationfinalshannononly
OracleappsBAEPresentationfinalshannononlyPatrick Shannon, PMP
 
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...Zensar Technologies Ltd.
 
Open Source Data Management for Industry 4.0
Open Source Data Management for Industry 4.0Open Source Data Management for Industry 4.0
Open Source Data Management for Industry 4.0DataWorks Summit
 

Similar to Leveraging SAP to Support Reliability Analytics (20)

Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation Slides
 
01_Team_03_CS_591_Project
01_Team_03_CS_591_Project01_Team_03_CS_591_Project
01_Team_03_CS_591_Project
 
Supply Chain Council
Supply Chain CouncilSupply Chain Council
Supply Chain Council
 
Elcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAMElcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAM
 
Analytics in High Tech Electronics Supply Chain
Analytics in High Tech Electronics Supply ChainAnalytics in High Tech Electronics Supply Chain
Analytics in High Tech Electronics Supply Chain
 
Data Center Infrastructure Management Powerpoint Presentation Slides
Data Center Infrastructure Management Powerpoint Presentation SlidesData Center Infrastructure Management Powerpoint Presentation Slides
Data Center Infrastructure Management Powerpoint Presentation Slides
 
Oracle eBS Overview.pptx
Oracle eBS Overview.pptxOracle eBS Overview.pptx
Oracle eBS Overview.pptx
 
12 1-man-operation center-ug(2)
12 1-man-operation center-ug(2)12 1-man-operation center-ug(2)
12 1-man-operation center-ug(2)
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013
 
Operations Management PowerPoint Presentation Slides
Operations Management PowerPoint Presentation SlidesOperations Management PowerPoint Presentation Slides
Operations Management PowerPoint Presentation Slides
 
Operations Management Powerpoint Presentation Slides
Operations Management Powerpoint Presentation SlidesOperations Management Powerpoint Presentation Slides
Operations Management Powerpoint Presentation Slides
 
Erp implementation process and introduction to dynamics 365
Erp implementation process and introduction to dynamics 365Erp implementation process and introduction to dynamics 365
Erp implementation process and introduction to dynamics 365
 
Demantra Case Study Doug
Demantra Case Study DougDemantra Case Study Doug
Demantra Case Study Doug
 
IT Infrastructure Management Powerpoint Presentation Slides
IT Infrastructure Management Powerpoint Presentation SlidesIT Infrastructure Management Powerpoint Presentation Slides
IT Infrastructure Management Powerpoint Presentation Slides
 
OIA administration
OIA administrationOIA administration
OIA administration
 
CA Mainframe Resource Intelligence
CA Mainframe Resource IntelligenceCA Mainframe Resource Intelligence
CA Mainframe Resource Intelligence
 
Demantra case study
Demantra case studyDemantra case study
Demantra case study
 
OracleappsBAEPresentationfinalshannononly
OracleappsBAEPresentationfinalshannononlyOracleappsBAEPresentationfinalshannononly
OracleappsBAEPresentationfinalshannononly
 
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
Case Study: Driving Quality Control Processes for a Manufacturing Client usin...
 
Open Source Data Management for Industry 4.0
Open Source Data Management for Industry 4.0Open Source Data Management for Industry 4.0
Open Source Data Management for Industry 4.0
 

More from Mike Poland, CMRP

Track 2 Tuesday Michael Rose and Chris Gould- pres.
Track 2 Tuesday Michael Rose and Chris Gould- pres.Track 2 Tuesday Michael Rose and Chris Gould- pres.
Track 2 Tuesday Michael Rose and Chris Gould- pres.Mike Poland, CMRP
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Mike Poland, CMRP
 
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALImplementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALMike Poland, CMRP
 
Leveraging Performance Standards to Reduce Risk - Houston SMRP MaRS 2013
Leveraging Performance Standards to Reduce Risk - Houston SMRP MaRS 2013Leveraging Performance Standards to Reduce Risk - Houston SMRP MaRS 2013
Leveraging Performance Standards to Reduce Risk - Houston SMRP MaRS 2013Mike Poland, CMRP
 
Emerging international standards on asset asset management
Emerging international standards on asset asset managementEmerging international standards on asset asset management
Emerging international standards on asset asset managementMike Poland, CMRP
 
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyIdentifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyMike Poland, CMRP
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMike Poland, CMRP
 

More from Mike Poland, CMRP (7)

Track 2 Tuesday Michael Rose and Chris Gould- pres.
Track 2 Tuesday Michael Rose and Chris Gould- pres.Track 2 Tuesday Michael Rose and Chris Gould- pres.
Track 2 Tuesday Michael Rose and Chris Gould- pres.
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
 
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALImplementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
 
Leveraging Performance Standards to Reduce Risk - Houston SMRP MaRS 2013
Leveraging Performance Standards to Reduce Risk - Houston SMRP MaRS 2013Leveraging Performance Standards to Reduce Risk - Houston SMRP MaRS 2013
Leveraging Performance Standards to Reduce Risk - Houston SMRP MaRS 2013
 
Emerging international standards on asset asset management
Emerging international standards on asset asset managementEmerging international standards on asset asset management
Emerging international standards on asset asset management
 
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyIdentifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCM
 

Recently uploaded

Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 

Recently uploaded (20)

Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 

Leveraging SAP to Support Reliability Analytics

  • 1. Produced by:Platinum SponsorPremier Sponsor Leveraging SAP to Support Reliability Analytics Chris Zawislak & Mike Poland ConAgra Foods, Inc Life Cycle Engineering, Inc.
  • 2. • ConAgra Overview • Taxonomy • Criticality • Workflows • Key points to take home • Questions What I’ll Cover
  • 3. ConAgra Foods overview Slide 3 ConAgra Foods started in 1919 as Nebraska Consolidated Mills. In 1971 it was renamed ConAgra, Inc., and the company became ConAgra Foods in 2000. ConAgra Foods is a Fortune 500 company with more than 24,000 employees, with the company’s world headquarters located in Omaha, Neb. ConAgra Foods is one of North America’s leading food companies, with brands in 97 percent of America’s households. In fiscal year 2010, ConAgra Foods brought in $12+ billion in net sales.
  • 6. Introduction & Overview Executive Vision • Leverage CPS to improve performance • Leverage SAP to drive cost down
  • 7. Situation • 2007 PM Pillar established • Working to establish foundation (PM Step 1) • Implemented SAP across consumer plants • Currently working to develop reliability competencies • SAP configuration was adequate to support foundation but requires optimization to support reliability analytics and other continuous improvement activities
  • 8. SAP PM Risk Analysis Failure Mode and Effect Analysis Severity of Failure Likelihood of Occurrence Delectability of Failure Risk Ranking Control Plans Reliability Analysis Asset Module of EAM Continuous Improvement Functional Hierarchy Criticality Analysis Reliability Maturity
  • 9. Action Create a Reliability Center of Excellence • Reliability Action Team • Reliability Focus Team • Reliability Engineering function and resource development • Reliability Infrastructure – SAP Configuration  Taxonomy  Criticality  Workflows
  • 10. •Learning to See Process Flow Diagram Value Stream Mapping Relationship Models Equipment Criticality Failure Analysis Risk Analysis Risk Ranking Standard Work Operating Procedures Preventive Predictive Condition Monitoring Remote Monitoring Operator Care Critical Spares OEE TCO Asset Utilization MTBF MTTR OPERATIONAL STABILITY MeasureControlAnalyzeClassify Continuous Improvement Plan Do Check Act Reliability Infrastructure
  • 11. Slide 11 Taxonomy “Systematic classification of items into generic groups based on factors possibly common to several of the items” ISO 14224, Petroleum and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • 12. Slide 12 Hierarchy (1) Business Category (2) Installation/ Business Unit (3) Cost Center/ Op Unit (4) Function (5) System/ Process Line (6) Sub system/Asset/Equipment (7) Component/Maintainable Item (8) Part/ BOM Use/LocationDataEquipmentSubdivision Taxonomy per ISO 14224:2006
  • 13. Functional Block Diagram In Feed Assembly Out feed AssemblyFill Table Shaker VFD Drive Unit PLC Rotary Filler – Technical Object Objects
  • 14. FMEA to SAP Slide 14 FAILURE MODE (FUNCTIONAL FAILURE) POTENTIAL CAUSE(S) CURRENT CONTROL(S) SEVERITY PROBABILITY DETECTION RISK PRIORITY NUMBER STRATEGY: CM ‐ Corrective  (RTF) PM ‐ Time Based CBM ‐ Condition  Based MOD ‐  Modification THERMOGRAPHY VIBRATION ANALYSIS ULTRASOUND OIL ANALYSIS MOTOR CIRCUIT ANALYSIS TEMPERATURE READING INSPECTION LUBRICATION SCHEDULED REBUILD SCHEDULED REPLACEMENT ROUTINE CLEANING AMD CLEANING AMD INSPECTION AMD LUBRICATION CSD VALIDATION RUN TO FAILURE DINNER OUT OF POSITION AND OR DOES NOT TRANSFER LUG MISALIGNMENT DAILY PM INSPECTION 3 2 2 12 CBM D CHAIN STRETCH DAILY PM INSPECTION, AUTO LUBE 8 2 1 16 CBM D RAIL MISALIGNMENT DAILY PM INSPECTION 3 2 2 12 CBM D SERVO MOTOR FAILURE 1W PM INSPECTION (VISUAL) 5 4 9 180 CBM 1M 1W PHOTO EYE FAILURE (2) NONE 3 5 7 105 PM 1M DRIVE CHAIN FAILURE 1W PM INSPECTION (VISUAL) 4 2 3 24 CBM 1W DRIVE SPROCKET WORN 1W PM INSPECTION (VISUAL) 4 2 3 24 CBM 1W LUG CHAIN CONTAMINATION (PRODUCT FALLING) NONE 2 5 9 90 MOD DINNER NOT IN 4 X 5 MATRIX RAIL MISALIGNMENT INFORMAL PM DAILY INSPECTION 3 2 4 24 MOD BELT CONTAMINATION NONE 3 8 8 192 MOD SERVO MOTOR FAILURE NONE 5 4 9 180 CM, POSSIBLE MOD BELT DRIVE GEAR(2) FAILURE (ONE PLASTIC, ONE METAL) DAILY PM INSPECTION 4 2 2 16 CBM D BELT TORN OR EXCESSIVELY WORN INFORMAL PM DAILY INSPECTION 3 3 3 27 CBM D Damage Codes Cause Codes Task Codes
  • 15. Rotary Filler Catalog Profile Code Component Description In feed Fill Table Out Feed Shaker Drive Unit VFD PLC 1001 Rail Misalignment X X 1002 Failed Bearing X X 1003 Worn Gear X X X X 1004 Air Leak X 1005 Failed Electrical Circuit X X X 1006 Failed Belt X X 1007 Programming Error 1008 Failed Belt X 1009 Failed Chain X 1010 Failed eye X X Cause Code Catalog Code Component Description In feed Fill Table Out Feed Shaker Drive Unit VFD PLC 2001 Process Stopped X X X X X X 2002 Process Slow X X X X X X 2003 Process Fast X X 2004 Over fill X X X X X 2005 Under fill X X Damage Code Catalog Rotary Filler Cause Code Group Rotary Filler Task Code Group Rotary Filler Damage Code Group Maintenance Plan
  • 16. Finding: ABC Indicator does provide adequate granularity for equipment criticality Result: Insufficient indicators provide requisite separation of assets for prioritizing the application of corporate resources Recommendation: Develop a criticality business process and RACI to at least Base-10 There are 36 characters available in ABC Indicator which provide considerable granularity but often only 3 are used…. Criticality Analysis Slide 16
  • 17. Criticality Analysis • Single point failure • Impact to value stream • Impact to corporate objectives • Replacement asset value • Impact on reputation • Impact on EHS
  • 19. RIME Index Slide 19 Work Order Type EquipmentCriticality 10 9 8 7 6 5 4 3 2 1 10 100 90 80 70 60 50 40 30 20 10 9 90 81 72 63 54 45 36 27 18 9 8 80 72 64 56 48 40 32 24 16 8 7 70 63 56 49 42 35 28 21 14 7 6 60 54 48 42 36 30 24 18 12 6 5 50 45 40 35 30 25 20 15 10 5 4 40 36 32 28 24 20 16 12 8 4 3 30 27 24 21 18 15 12 9 6 3 2 20 18 16 14 12 10 8 6 4 2 1 10 9 8 7 6 5 4 3 2 1
  • 21. Key Points to Take Home • SAP configuration needs to mature along with your organization • Collaboration between reliability, maintenance, and IT professionals is key • Control strategy performance indicators should depend on work order accuracy • Leverage FMEA for development of technical object catalogs as well as overall control strategy • FMEA and technical object catalogs are living documents and should be updated when appropriate • Criticality needs to be granular enough to support reliability analytics and backlog management • Task, damage, and cause codes are linked to equipment class for ease of replication across the enterprise
  • 22. Build or Migrate Database Risk Analysis Failure Mode and Effect Analysis Severity of Failure Likelihood of Occurrence Detectability of Failure Risk Ranking Control Plans Reliability Analysis Asset Module of EAM Continuous Improvement Functional Hierarchy Criticality Analysis Close the Loop