SAP TCode (Transaction Code) - PP6C
The SAP TCode PP6C is used for the task : Undo Completed Target Plan. The TCode belongs to the PP08 package.
SAP Shift Planning Tcodes
Tcode | Description | Module |
---|
OODU | Shift Planning: Report Variant | PT-SP |
OODO | Shift Planning: Difference Payment | PT-SP |
PP6G | Info Column: Main Proposal | PT-SP |
OORU | Shift Planning: Proposal Strategy | PT-SP |
OODX | Shift Planning: Groupings | PT-SP |
OODH | Shift Planning: Selection View | PT-SP |
OODF | Shift Planning: Abbrev. Proposal | PT-SP |
PP6E | Substitution Types in Shift Plans | PT-SP |
OODE | Shift Planning: Work Center View | PT-SP |
OODC | Shift Planning: Requirements Entry | PT-SP |
Full List of
SAP Shift Planning Tcodes