Business and Biodiversity Offsets Programme (BBOP)<br />

BBOP Pilot <strong>Project</strong><br />

Case Study<br />

The <strong>Ambatovy</strong> <strong>Project</strong>


<strong>Forest</strong> <strong>Trends</strong>, Conservation International and the Wildlife Conservation Society provided the<br />

Secretariat for BBOP during the first phase of the programme's work (2004 <strong>–</strong> 2008).<br />

Publication Data<br />

The <strong>Ambatovy</strong> <strong>Project</strong> Business and Biodiversity Offsets Programme Pilot <strong>Project</strong> Case Study, 2009: The<br />

<strong>Ambatovy</strong> <strong>Project</strong> is a Joint Venture project between Sherritt Incorporated, Sumitomo Incorporated, Kores and<br />

SNC Lavalin. The <strong>Ambatovy</strong> <strong>Project</strong> is comprised of the following two Madagascan operating companies,<br />

<strong>Ambatovy</strong> Minerals SA (AMSA) and Dynatec <strong>Madagascar</strong> S.A. (DMSA). The <strong>Project</strong> Administrative offices are<br />

located at Trano Fitaratra, 7ème étage, Ankorondrano, Antananarivo, <strong>Madagascar</strong> (PO Box 12085, Poste<br />

Zoom, Ankorondrano), T: +261 20 22 230 88 / 22 397 35 <strong>–</strong> 37 F: +261 20 22 540 30, http://www.sherritt.mg/<br />

Available from www.forest-trends.org/biodiversityoffsetprogram/guidelines/ambatovy-case-study.pdf.<br />

© The <strong>Ambatovy</strong> <strong>Project</strong> (<strong>Ambatovy</strong> Minerals SA/Dynatec <strong>Madagascar</strong> SA) 2009.<br />

Reproduction of this publication for educational or other non-commercial purposes is authorised without prior<br />

written permission from the copyright holder provided the source is fully acknowledged.<br />

Reproduction of this publication for resale or other commercial purposes is prohibited without prior written<br />

permission of the copyright holder.<br />

The findings, interpretations and conclusions expressed here are those of the authors and do not necessarily<br />

reflect the views of The <strong>Ambatovy</strong> <strong>Project</strong>. Any errors are purely the responsibility of the authors.<br />

Cover and graphic design by Rima Design.


THE AMBATOVY PROJECT<br />

BBOP PILOT PROJECT<br />

BUSINESS AND BIODIVERSITY OFFSETS<br />

PROGRAMME<br />

CASE STUDY<br />

PREPARED BY PIERRE O. BERNER, STEVEN DICKINSON AND ARISTIDE ANDRIANARIMISA<br />

JANUARY 2009


About this document<br />

To help developers, conservation groups, communities, governments and financial institutions that wish to<br />

consider and develop best practice related to biodiversity offsets, the Business and Biodiversity Offsets<br />

Programme (BBOP) has prepared a set of Principles, interim guidance and resource documents 1 , including<br />

pilot project case studies, of which this Document 2 is one. All those involved in BBOP are grateful to the<br />

companies who volunteered pilot projects in this first phase of its work.<br />

The ability to test methods and learn from practical experience in a set of pilot projects has played an<br />

important role in the development of the BBOP Principles on Biodiversity Offsets and supporting materials<br />

during the first phase of the programme’s work (2004 <strong>–</strong> 2008). The <strong>Ambatovy</strong> <strong>Project</strong>’s four shareholders<br />

volunteered to undertake pilot projects during BBOP’s first phase, with some joining at the outset, and some<br />

at later stages. While BBOP has offered some support and technical advice to the individual pilot projects<br />

through its Secretariat and Advisory Committee, each pilot project has been directed and managed by a team<br />

employed or contracted by the companies and city council leading the respective projects. Each of the case<br />

studies prepared by the pilot projects explains the approach taken and how close the <strong>Project</strong> has come to<br />

completing the design of the biodiversity offset concerned, and sets out the developer’s current thinking on the<br />

most appropriate offset. This may change as the <strong>Project</strong> teams finalise their offset programme design and<br />

further implementation. The nature of the guidance used by the pilot projects has varied according to which<br />

drafts of the evolving BBOP Handbooks were available to them at the time. This and the individual<br />

circumstances and context of each pilot project have affected the extent to which they have used or adapted<br />

the BBOP guidance. Consequently, the case studies do not necessarily reflect the range of interim guidance<br />

currently presented in BBOP’s Biodiversity Offset Design Handbook, Cost-Benefit Handbook and<br />

Implementation Handbook.<br />

This Document has been provided by the <strong>Ambatovy</strong> <strong>Project</strong> subject to the limitations set out herein.<br />

The <strong>Ambatovy</strong> <strong>Project</strong> is still working on the design of the proposed biodiversity offset discussed in this case<br />

study. Consequently, none of the suggested or projected activities based on fieldwork to date represent a<br />

commitment on the part of The <strong>Ambatovy</strong> <strong>Project</strong>, it shareholders or potential partners to proceed with the<br />

offset as described in draft form in this Document. Such commitment is the subject of continuing internal<br />

discussions. The information and data relating to possible offset sites, areas and activities are presented here<br />

to communicate the initial work that has been done on a potential offset design and to illustrate one possible<br />

approach to the design of a biodiversity offset intended to comply with the BBOP principles.<br />

Where data supplied by external sources, including previous site investigation data, have been used, it has<br />

been assumed that the information is correct unless otherwise stated. No responsibility is accepted by the<br />

<strong>Ambatovy</strong> <strong>Project</strong> for incomplete or inaccurate data supplied by others.<br />

1 The BBOP Principles, interim guidance and resource documents, including a glossary, can be found at<br />

www.forest-trends.org/biodiversityoffsetprogram/guidelines/. To assist readers, a selection of terms with an entry in the BBOP<br />

Glossary has been highlighted thus: biodiversity offsets. Users of the Web or CD-ROM version of this document can move their<br />

cursors over a glossary term to see the definition.<br />

2 This case study was prepared by Pierre O. Berner, Steven Dickinson and Aristide Andrianarimisa.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

1


About this document 2<br />

The <strong>Ambatovy</strong> <strong>Project</strong> may have retained sub-consultants affiliated with the <strong>Ambatovy</strong> <strong>Project</strong> to provide<br />

Services for the benefit of the <strong>Ambatovy</strong> <strong>Project</strong>. To the maximum extent allowed by law, users of this<br />

Document acknowledge and agree they will not have any direct legal recourse to, and waive any claim,<br />

demand, or cause of action against, the <strong>Ambatovy</strong> <strong>Project</strong>’s contractors, sub-contractors, partners,<br />

shareholders and other related or affiliated companies, and their respective employees, officers and directors.<br />

This Document is provided for the use by developers, conservation groups, communities, governments and<br />

financial institutions that wish to consider and develop best practice related to biodiversity offsets. No<br />

responsibility whatsoever for the contents of this Document will be accepted by any person. Any use made of<br />

this Document or any reliance on or decisions to be made based on it, is the responsibility of such users. The<br />

<strong>Ambatovy</strong> <strong>Project</strong> accepts no responsibility for damages, if any, suffered by any third party as a result of<br />

decisions made or actions based on this Document.<br />

For greater certainty, this Document has been prepared for the particular purpose outlined herein and no<br />

responsibility is accepted for the use of this Document, in whole or in part, in other contexts or for any other<br />

purpose.<br />

BBOP is embarking on the next phase of its work, during which BBOP hopes to collaborate with more<br />

individuals and organisations around the world, to test and develop these and other approaches to biodiversity<br />

offsets more widely geographically and in more industry sectors. BBOP is a collaborative programme, and we<br />

welcome your involvement. To learn more about the programme and how to get involved please:<br />

See: www.forest-trends.org/biodiversityoffsetprogram/<br />

Contact: bbop@forest-trends.org<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Contents<br />

Table of contents<br />

About this document 1<br />

1. Executive Summary 6<br />

2. <strong>Project</strong> Context 11<br />

2.1 Policy context 11<br />

2.2 Regional context 12<br />

2.3 Shareholders involved in offset design 14<br />

3. <strong>Project</strong> Summary 15<br />

3.1 General project description 15<br />

3.2 <strong>Ambatovy</strong> offset programme 17<br />

4. How the <strong>Ambatovy</strong> <strong>Project</strong> is Applying the BBOP Principles 19<br />

5. Current Status of the <strong>Project</strong> and Offset 24<br />

5.1 <strong>Project</strong> chronology and status (as of December 2008) 24<br />

5.2 Offset chronology and status (as of December 2008) 24<br />

6. Business Case for a Biodiversity Offset 26<br />

7. The Offset Design Process 28<br />

7.1 Guidance and methodologies used 28<br />

7.2 Roles and responsibility 28<br />

7.3 The offset design process 29<br />

7.3.1 Step 1: Review project scope and activities 29<br />

7.3.2 Step 2: Review the legal framework and / or policy context for a biodiversity offset 29<br />

7.3.3 Step 3: Initiate a stakeholder participation process 29<br />

7.3.4 Step 4: Determine the need for an offset based on residual adverse effects 29<br />

7.3.5 Step 5: Choose methods to calculate loss / gain and quantify residual losses 35<br />

7.3.6 Step 6: Review potential offset locations and activities and assess the<br />

biodiversity gains which could be achieved at each 46<br />

7.3.7 Step 7: Calculate offset gains and select appropriate offset locations and activities 51<br />

7.3.8 Step 8: Record the offset design and enter the offset implementation process 51<br />

8. Implementation Plan and Long-term Management 53<br />

9. Summary of Offset Process Costs 54<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

3


Contents 4<br />

10. <strong>Project</strong> Outcomes 56<br />

11. Lessons Learned 58<br />

11.1 Limitations 58<br />

11.1.1 Available data 58<br />

11.1.2 Averaging 59<br />

11.2 Recommendations 59<br />

12. Next Steps 60<br />

13. References 62<br />

Tables<br />

Table 1: Summary of the <strong>Ambatovy</strong> pilot <strong>Project</strong> 9<br />

Table 2: <strong>Ambatovy</strong> <strong>Project</strong> offset programme 18<br />

Table 3: Summary of attribute weighting (December 2008) 41<br />

Table 4: Azonal habitat (December 2008) 43<br />

Table 5: Transitional habitat (December 2008) 43<br />

Table 6: Zonal habitat (December 2008) 43<br />

Table 7: Pipeline zonal habitat (December 2008) 43<br />

Table 8: Biodiversity loss calculations scenarios at impact site and effect of post-impact remediation 45<br />

Table 9: Summary of estimated costs 54<br />

Table A5.1: Fauna and flora species vulnerability matrix (April 2008) 92<br />

Table A5.2: Key Biodiversity Components Matrix (KBCM) vulnerability scores (April 2008) 92<br />

Graphs<br />

Graph 1: Post-impact mitigation influence on biodiversity loss for forest habitats at impact site 45<br />

Photographs<br />

Photograph 1: Ankerana aerial view 48<br />

Photograph 2: Ankerana azonal habitat 48<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Contents 5<br />

Figures<br />

Figure 1: <strong>Project</strong> location map 13<br />

Figure 2: <strong>Project</strong> components map 16<br />

Figure 3: Mine area, showing conservation zones (green) that constitute on-site offset area<br />

(including azonal, transitional and zonal forests) 32<br />

Figure 4: Mine area habitat map 37<br />

Figure 5: Mine footprint and environmental buffer map 37<br />

Figure 6: BBOP benchmark site map 40<br />

Figure 7: <strong>Forest</strong> habitat percentage hectares loss for the mine component (the pipeline affects only<br />

a small portion of the zonal habitat) 44<br />

Figure 8: Ankerana offsite offset area location and other candidate sites surveyed by the project, in<br />

relation to the <strong>Ambatovy</strong> mine area 47<br />

Figure 9: Correlation between EVC (azonal, transitional and zonal), substrate and topography 48<br />

Figure 10: Ankerana map 50<br />

Figure 11: Mine area and Analamay-Mantadia forest corridor, allowing link between on-site offset and<br />

forest corridor 50<br />

Figure 12: Actions and timings (2004 <strong>–</strong> onwards) 53<br />

Appendices<br />

Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score,<br />

December 2008 Iteration 64<br />

Appendix 2: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score,<br />

February 2008 Iteration 78<br />

Appendix 3: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score,<br />

April 2008 Iteration 80<br />

Appendix 4: Mine Footprint Status Sheet, 2nd Iteration 87<br />

Appendix 5: Vulnerability Index 91<br />

Appendix 6: Survey for Off-site Azonal Outcrops (in French) 94<br />

Appendix 7: Comparison of <strong>Ambatovy</strong> / Analamay and Ankerana Azonal Habitats 115<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


1. Executive Summary<br />

The <strong>Ambatovy</strong> <strong>Project</strong> is a large-tonnage nickel project in <strong>Madagascar</strong> with an annual design capacity of<br />

60,000 tonnes of nickel and 5,600 tonnes of cobalt. The <strong>Project</strong> is comprised of two companies <strong>Ambatovy</strong><br />

Minerals SA and Dynatec <strong>Madagascar</strong> SA each owned in the same proportion by Sherritt Incorporated,<br />

Sumitomo Incorporated, Kores and SNC Lavalin. The <strong>Project</strong> was permitted in December 2006. Construction<br />

began in early 2007 and production is due to begin by the end of 2010, reaching full capacity by 2013. The<br />

<strong>Project</strong>’s expected LIFECYCLE is 27 years, although operation beyond this is likely.<br />

The <strong>Ambatovy</strong> <strong>Project</strong> has six components: the mine, the slurry pipeline, the processing plant (including<br />

refinery), the tailings management facility, the harbour extension and the resettlement site. The <strong>Project</strong> covers<br />

a large territory extending over two of <strong>Madagascar</strong>’s twenty-two regions. The mine is located at an elevation<br />

of approximately 1,000 m above sea level, on <strong>Madagascar</strong>’s eastern escarpment, near the town of<br />

Moramanga. The industrial complex (plant, tailings management facility and harbour) is located 130 km to the<br />

northeast of the mine site, in the seaport city of Toamasina. A 218 km slurry pipeline carrying a water laterite<br />

slurry, which contains the ore, links the mine and plant. The proposed off-site offset of Ankerana, which<br />

constitutes the key component of the multifaceted offset programme, is situated in a very remote area<br />

between the mine site and Toamasina.<br />

The <strong>Ambatovy</strong> <strong>Project</strong>’s vision states that it will operate a sustainable nickel / cobalt mining and processing<br />

enterprise that delivers outstanding environmental and social records. The <strong>Project</strong> developed an<br />

environmental strategy aiming at honouring the <strong>Project</strong>’s vision, by producing positive CONSERVATION<br />

OUTCOMES on biodiversity through an offset programme. The offset programme aims at achieving NO NET LOSS<br />

on biodiversity, and preferably NET GAIN. The business benefit is essentially linked to risk management and<br />

aims to sustain ‘a good citizen project’ status in a host country recognised to constitute a BIODIVERSITY<br />

HOTSPOT but suffering from chronic poverty.<br />

The <strong>Ambatovy</strong> offsets programme is multifaceted with many components. The programme has been adopted<br />

voluntarily to go above and beyond the <strong>Project</strong>’s impacts management strategy. The Programme includes:<br />

1. The Ankerana offset: the off-site offset area covers 11,600 hectares (ha) of endangered forest, with<br />

similar ABIOTIC and BIOTIC conditions to those found at the mine site; the <strong>Project</strong> aims to ensure its long<br />

term protection through legal arrangements, financing and community consensus.<br />

2. Two azonal forest sites: two on-site (mine) azonal forest conservation areas occur partially over the<br />

ore body footprint; the <strong>Project</strong> aims to ensure their long term protection through legal and managerial<br />

commitments.<br />

3. The mine area conservation forest: the conservation forest area around the mine footprint is 4,900<br />

ha; the <strong>Project</strong> aims to ensure its long term conservation as part of the priority species management<br />

programme and maintenance of the ecological services for the local communities.<br />

4. The Analamay-Mantadia forest corridor: the <strong>Project</strong> is spearheading the establishment of a forest<br />

corridor between the mine area forests and the nearby Ankeniheny-Zahamena Corridor; the forest<br />

corridor aims at long term landscape level CONNECTIVITY for the protection of mine area biodiversity<br />

through partnerships with government, NGOs and local communities.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

6


Executive Summary 7<br />

5. The Torotorofotsy Ramsar wetland ecosystem: the <strong>Project</strong> is supporting the site management plan<br />

design and implementation in conjunction with government and local NGOs; these efforts aim to ensure<br />

the permanency of legal and managerial commitments in partnership with government and a local NGO.<br />

6. The pipeline right of way reforestation programme: the programme aims at enhancing FOREST<br />

CONNECTIVITY in targeted areas of the Ankeniheny-Zahamena Corridor through expanded reforestation<br />

activities along the slurry pipeline right of way by conducting targeted reforestation in partnership with<br />

government and local NGOs.<br />

7. The mine footprint replacement forest: the <strong>Project</strong> aims to create a replacement, multifunctional<br />

forest on the footprint during progressive reclamation with an established, integrated managerial<br />

structure by mine closure.<br />

The <strong>Ambatovy</strong> offset programme design approach was tailored according to the guidelines provided by the<br />

BBOP Secretariat and Advisory Committee. It includes the following steps:<br />

Step 1. Reviewing the offset project scope and activities: the offset project was outlined in the<br />

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA), to go above and beyond the expected<br />

regulatory requirements, and was presented during stakeholder consultation; the <strong>Project</strong> became a<br />

pilot project in 2006 before obtaining its operating permit.<br />

Step 2. Reviewing the legal policy context for its biodiversity offset programme: key elements<br />

comprise the MECIE decree (Mise en Compatibilité des Investissements avec l'Environnement,<br />

Decree N° 2004-167 modified), the <strong>Madagascar</strong> Action Plan (MAP) 2007 <strong>–</strong> 2012, the regional and<br />

communal development plans and the EQUATOR PRINCIPLES.<br />

Step 3. Initiating stakeholder participation: PARTICIPATION has been pursued since the ESIA stage,<br />

engaging the <strong>Project</strong>’s shareholders, government, financiers, NGOs and local communities in the<br />

design of the offset programme and integrating their feedback.<br />

Step 4. Determining the need for an offset based on residual adverse effects: the <strong>Project</strong>’s principal<br />

impacts on natural systems and biodiversity were assessed by the project ESIA. DIRECT IMPACTS<br />

were predicted to occur at the mine area through the phased clearing of the 1,336 ha mine footprint<br />

within an ecologically sensitive semi-pristine forest mosaic. The KEY BIODIVERSITY COMPONENTS in<br />

the mine area and upper slurry pipeline portion include significant numbers of fauna (16 lemurs, 62<br />

birds, 123 herpetofauna), fish and 376 flora species, three structurally distinct HABITAT TYPES and a<br />

landscape-level habitat assemblage with functional interactions between its forest habitats. A very<br />

substantial MITIGATION programme was implemented through the <strong>Ambatovy</strong> <strong>Project</strong>’s Biodiversity<br />

Management Plan (BMP). The <strong>Project</strong>’s most significant RESIDUAL IMPACTS occur at the mine site,<br />

including both direct impacts through the clearing of the 1,336 ha footprint (and associated<br />

biodiversity) and indirect residual impacts from edge effects on the environmental buffer (790 ha).<br />

Other key <strong>Project</strong> components are located in areas that are already heavily and historically<br />

degraded and thus have negligible negative impacts on biodiversity.<br />

Step 5. Methods to calculate LOSSES / GAINS and quantify residual losses: the <strong>Project</strong> used the BENCHMARK<br />

and HABITAT HECTARES methodology to determine the scale of the offset needed to achieve the<br />

CONSERVATION GAINS that will achieve no net loss of biodiversity. The <strong>Project</strong> will generate a total loss<br />

of 1,168 habitat hectares that any offset will be required to compensate; this result will be refined with<br />

complementary fauna quantitative data acquired in early 2009. Socioeconomic losses and<br />

compensations from the offset programme will be determined during 2009.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Executive Summary 8<br />

Step 6. Reviewing potential offset locations and activities to assess biodiversity gains which could<br />

be achieved: preliminary surveys of offset candidate sites were undertaken in 2005 with the<br />

objective of identifying potential IN-KIND type offsets. The Ankerana forest site has many similarities<br />

with the <strong>Ambatovy</strong> mine site forests, supporting the hypothesis that Ankerana can be considered ‘inkind’<br />

relative to the <strong>Ambatovy</strong> azonal habitats.<br />

Step 7. Calculating offset gains and select appropriate offset locations and activities: additional work<br />

to verify Ankerana’s similarities is required and planned for 2009, including detailed quantification of<br />

potential offset gains. Gains from other offset programme components will also be calculated and<br />

integrated.<br />

Step 8. Recording the offset design and entering the offset implementation process: the Ankerana<br />

offset design and other components of the offset programme have not yet been finalised, thus the<br />

implementation process has not formally begun. The <strong>Project</strong> will finalise the offset programme<br />

design, using BBOP guidance, during the course of 2009.<br />

The team plans to complete the design of the offset programme implementation plan by the end of 2009, with<br />

the Ankerana and other offset sites’ gain calculated in 2010, and thus the final offset design completed at that<br />

point. The <strong>Project</strong> will have the responsibility of ensuring the management of the Ankerana site, while actual<br />

site protection and local management will likely be entrusted to an NGO. For Ankerana, the annual<br />

operational costs are in the process of being established and are estimated to be in the range US$ 250,000 <strong>–</strong><br />

300,000 per annum. Since the offset programme is still in the design phase, the actual conservation outcomes<br />

to date are limited. They represent what the <strong>Project</strong> has achieved thus far and the benefits the <strong>Project</strong> has<br />

already enjoyed and include securing the temporary protection of Ankerana until the Ministerial decree for its<br />

protection is finalised; integrating Ankerana into the national protected areas network; coordination between<br />

government organisations, NGOs, local communities and the private sector; local community awareness and<br />

reforestation activities. At the mine site, forest and TAXA-specific conservation management plans were<br />

developed for flora and fauna, (e.g., lemurs, Mantella frog species and fish). Although these programmes<br />

were developed as part of the Biodiversity Management Plan, their importance is reinforced by their aim of<br />

ensuring the conservation of azonal habitat and associated species, thus ensuring that all key biodiversity<br />

components present on the IMPACT SITE are present at the offset.<br />

A summary of the <strong>Ambatovy</strong> <strong>Project</strong> pilot project BBOP programme is presented in Table 1.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Executive Summary 9<br />

Table 1: Summary of the <strong>Ambatovy</strong> pilot <strong>Project</strong><br />

Company name <strong>Ambatovy</strong> Minerals SA & Dynatec <strong>Madagascar</strong> SA (AMSA / DMSA)<br />

<strong>Project</strong> name <strong>Ambatovy</strong> <strong>Project</strong> <strong>–</strong> <strong>Madagascar</strong><br />

Sector &<br />

project<br />

description<br />

<strong>Ambatovy</strong> is a large-tonnage nickel <strong>Project</strong> with an annual design capacity of 60,000 tonnes of<br />

nickel, 5,600 tonnes of cobalt and 190,000 tonnes of ammonium sulphate. Production is scheduled<br />

to begin in 2010, with full capacity expected to be achieved by 2013. The <strong>Project</strong>’s assessed reserve<br />

life is 27 years, with potential for extension beyond this. The main impacts to biodiversity are located<br />

at the mine footprint with the clearing of near-primary forest. The <strong>Project</strong> has designed and<br />

implemented a Biodiversity Management Programme to mitigate and monitor the residual impacts<br />

associated to development, whilst pursuing its impact AVOIDANCE and reduction approach. The<br />

mitigation measures cover flora, fauna and aquatics.<br />

Country Republic of <strong>Madagascar</strong> (Alaotra Mangoro and Atsinanana regions, eastern <strong>Madagascar</strong>).<br />

Shareholders Sherritt International Corporation, Sumitomo Corporation, Kores, and SNC Lavalin Incorporated.<br />

Principal<br />

biodiversity<br />

components<br />

affected by<br />

<strong>Project</strong><br />

The key biodiversity components, mostly confined to the mine area and upper slurry pipeline portion,<br />

can be summarised as follows:<br />

Priority species:<br />

<strong>–</strong> 16 lemurs species, including Prolemur simus (IUCN CR), Propithecus d. diadema (IUCN<br />

EN), Indri indri (IUCN EN), Eulemur rubriventer (IUCN VU), Daubentonia madagascarensis<br />

(IUCN NT), Hapalemur griseus (VU), Allocebus trichotis (IUCN DD);<br />

<strong>–</strong> 62 birds species, including Tyto soumagnei, Anas melleri and Ardea humbloti, Sarothura<br />

watersi (IUCN EN);<br />

<strong>–</strong> 123 herpetofauna species, including Mantella aurantiaca (IUCN CR), M. crocea (IUCN EN)<br />

and Sanzinia madagascariensis (IUCN VU);<br />

<strong>–</strong> 5 fish species of which Rheoles alaotrensis (IUCN VU) and at least two new Ratsirakia<br />

species;<br />

<strong>–</strong> 24 insect species, which are considered rare at a national level;<br />

<strong>–</strong> 376 plants including Asteropeia mcphersonii (IUCN VU), Leptolaena multiflora (IUCN EN),<br />

Dalbergia baroni (IUCN VU) and 330 species of concern, which are considered rare in<br />

<strong>Madagascar</strong>;<br />

Three structurally distinct habitat types: zonal, transitional and azonal forests (the latter including<br />

seasonal ponds and upper watershed stream systems) and their fauna and flora communities;<br />

and<br />

The landscape-level habitat assemblage with the functional interaction between the zonal,<br />

transitional and azonal forests.<br />

Scale of impact The main anticipated residual impacts on biodiversity caused by the <strong>Project</strong> will occur at the mine<br />

site and in the upper portion of the slurry pipeline through the progressive clearing of the mine<br />

footprint (approximately 1,336 ha), located within an ecologically sensitive natural forest mosaic of<br />

the eastern mid-altitudinal forest corridor. Stringent impact avoidance and minimisation strategies<br />

were applied in the design phase of the <strong>Project</strong>. Residual impacts on biodiversity at the other <strong>Project</strong><br />

components are insignificant due to human-induced degradation in these areas but will nonetheless<br />

be offset. These include pipelines, the processing plant, the tailings area and a pier extension<br />

project.<br />

The 218 km of buried slurry pipelines will involve the clearing of a mix of native and non-native<br />

secondary vegetation resulting from historical slash and burn with comparatively little biodiversity<br />

value. However, two sections of the pipeline cross sensitive habitats: the first 2 km of zonal, nearprimary<br />

forest accounted for in the mine footprint and the crossing of the Ankeniheny-Zahamena<br />

Corridor at Vohimana, where the pipeline has been routed to avoid residual primary forest fragments.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Executive Summary 10<br />

Description of<br />

offset<br />

Links to further<br />

information<br />

The processing plant occupies 2.6 km 2 of the Toamasina industrial zone. The associated tailings<br />

system of 14 km 2 will be located in a highly degraded agricultural matrix. An existing pier at the<br />

harbour will be extended by over 300 m to accommodate the <strong>Project</strong>’s logistical needs. The<br />

processing plant, tailings and pier extension have been assessed in the Environmental and Social<br />

Impact Assessment (ESIA) to have negligible residual impacts on biodiversity.<br />

As the <strong>Project</strong> is developing the ESIA is being revisited to ensure that no residual impact to<br />

biodiversity is being neglected. Any further residual impacts identified will be accounted for in the<br />

biodiversity offset calculation.<br />

The <strong>Ambatovy</strong> offsets programme is multifaceted with many components. The <strong>Ambatovy</strong> <strong>Project</strong> is<br />

committed to achieve positive conservation outcomes through designing and implementing its<br />

multifaceted programme, that includes:<br />

1. Ankerana offset: establishing an 11,600 ha endangered forest off-site offset, with similar abiotic<br />

and biotic conditions to those found at the mine site and ensuring long term protection through<br />

legal arrangements and community consensus.<br />

2. Azonal forest sites: establishing two on-site (mine) azonal forest habitats conservation areas<br />

that occur partially over the mine footprint and ensuring long term protection through legal and<br />

managerial commitments.<br />

3. Mine area conservation forest: establishing a 4,900 ha conservation forest area around the<br />

footprint and ensuring long term conservation as part of the priority species management<br />

programme and maintenance of the ecological services for the local communities.<br />

4. Analamay-Mantadia forest corridor: spearheading the establishment of a forest corridor<br />

between the mine area forests and the nearby Ankeniheny-Zahamena Corridor and securing<br />

long term landscape level connectivity for the protection of mine area biodiversity through<br />

partnerships with government, NGOs and local communities.<br />

5. Torotorofotsy Ramsar: supporting the site management plan design and implementation in<br />

conjunction with government and local NGOs and ensuring permanency of legal and managerial<br />

commitments with its partnerships.<br />

6. Pipeline right of way reforestation: enhancing forest connectivity in targeted areas of the<br />

Ankeniheny-Zahamena Corridor through expanded reforestation activities along the slurry<br />

pipeline right of way and conducting targeted reforestation in partnership with government and<br />

local NGOs.<br />

7. Mine footprint replacement forest: creating a replacement, multifunctional forest on the<br />

footprint during progressive reclamation with an established, integrated managerial structure by<br />

mine closure.<br />

While the design and implementation of the several components of the <strong>Ambatovy</strong> offset programme<br />

has progressed, the predicted conservation outcomes from these various offset components have<br />

not yet been fully calculated. Meanwhile, <strong>Ambatovy</strong> has focused on its proposed Ankerana offset as<br />

the most significant component of its offset. However, the high degree of social sensitivity around<br />

Ankerana has led the project to undertake community involvement before the planned biodiversity<br />

assessment at the site. The impact of the first pipeline section will be included in the offset<br />

calculation for the mine site. The second section of pipeline will be offset by reforestation not only of<br />

the pipeline footprint but also of broader areas with the aim of reconnecting the forest corridor.<br />

http://www.sherritt.com and http://www.sherritt.mg<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


2. <strong>Project</strong> Context<br />

2.1 Policy context<br />

Investment projects in <strong>Madagascar</strong> must be compatible with Malagasy environmental regulations. This<br />

principle is embedded in the MECIE (Mise en Compatibilité des Investissements avec l'Environnement)<br />

decree (Decree N° 2004-167 modified). The application of this decree is enforced by the environmental<br />

regulator, ONE (Office National de l’Environnement), which has developed stringent guidelines and protocols<br />

on how to elaborate, review, permit and monitor Environmental and Social Impact Assessments (ESIA).<br />

Although the terms of reference for an ESIA in <strong>Madagascar</strong> typically require stringent mitigation of impacts,<br />

biodiversity offsets are not included in the text.<br />

The Government of <strong>Madagascar</strong> became aware of biodiversity offset mechanisms through interactions with<br />

environmental NGOs in 2005 (WWF, Conservation International <strong>–</strong> CI, Wildlife Conservation Society <strong>–</strong> WCS).<br />

Subsequently, the BBOP Secretariat attended a presidential audience to discuss biodiversity offsets in June<br />

2006 during which the concept of offsets as a complementary mechanism to reduce impacts on <strong>Madagascar</strong>’s<br />

heritage was well received by the President of <strong>Madagascar</strong>. Biodiversity offsets were subsequently referred to<br />

in the <strong>Madagascar</strong> Action Plan (MAP) 2007 <strong>–</strong> 2012:<br />

Commitment # 7 “Cherishing the Environment”<br />

Challenge # 3 “Develop the Environmental Reflex at All Levels"<br />

Priority <strong>Project</strong>s and Activities # 3 “Develop a policy for mining companies and logging companies for<br />

biodiversity offsets and other mechanisms and incentives for environmental protection”<br />

The ESIA for the <strong>Ambatovy</strong> <strong>Project</strong> (MINEVEF/ONE Permit # 47/06 dated December 1st, 2006) established<br />

that the <strong>Project</strong>, and specifically the mine component, would be located in a sensitive biodiversity area and<br />

that the mitigation of residual impacts would require both on-site and off-site compensation measures. While<br />

on-site measures at the mine are commitments made in the ESIA, the <strong>Ambatovy</strong> offset programme goes<br />

above and beyond compliance with legal obligations. The offset programme is believed to deliver positive<br />

conservation outcomes under a vision of no net loss of biodiversity, and possibly net gain. This would enable<br />

the <strong>Project</strong> to honour its stringent biodiversity policy developed and endorsed by its shareholders:<br />

“… to cause no net harm to biological diversity where we operate, to mitigate unavoidable impacts, and to<br />

practice responsible closure procedures;<br />

… to assure the conservation of habitats, flora and fauna, using all reasonable actions and technologies;<br />

… to ensure responsible attention to the maintenance and, where possible, enhancement of biodiversity in<br />

the best interest of our business, the communities in which we operate, and the world at large.”<br />

The <strong>Project</strong>’s principal financial lenders have subscribed to the Equator Principles (http://www.equatorprinciples.com/index.shtml).<br />

In this context, full regulatory compliance and the implementation of a thorough<br />

impact management strategy is expected. In addition, the lenders also require the <strong>Project</strong>’s general<br />

compliance with the IFC Performance Standards and specifically Performance Standard 6 (Biodiversity<br />

Conservation and Sustainable Natural Resource Management). In the context of biodiversity offsets,<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

11


<strong>Project</strong> Context 12<br />

paragraph 8 of Standard 6 is particularly relevant and requires the design of mitigation measures to achieve<br />

no net loss of biodiversity where feasible. These measures may include a combination of actions, such as:<br />

Post-operation restoration of habitats<br />

Offset of losses through the creation of ecologically comparable area(s) that is managed for biodiversity<br />

Compensation to direct users of biodiversity<br />

The <strong>Project</strong> is thus designed to comply with the IFC Performance Standards for major projects.<br />

2.2 Regional context<br />

The <strong>Ambatovy</strong> <strong>Project</strong> has six components, including the mine, the slurry pipeline, the processing plant<br />

(including refinery), the tailings management facility, the harbour extension and resettlement sites (see Figure<br />

1). The <strong>Project</strong> covers a large territory extending over two of <strong>Madagascar</strong>’s twenty-two regions (Alaotra-<br />

Mangoro and Toamasina). The mine is located at an elevation of approximately 1,000 m above sea level<br />

(m.a.s.l.), near the town of Moramanga. The industrial complex (plant, tailings management facility and<br />

harbour) is located 130 km to the northeast of the mine site, in the seaport city of Toamasina. A slurry pipeline<br />

carrying a water laterite slurry, which contains the ore, links the mine and plant. The proposed Ankerana<br />

offset, constituting the key component of the multifaceted offset programme, is situated in a very remote area<br />

between the mine site and Toamasina.<br />

As presented in the <strong>Project</strong> ESIA, the principal biodiversity sensitivities of the <strong>Project</strong> are concentrated in the<br />

forested mine area and within the upper portion of the slurry pipeline, while social issues are relevant for all<br />

components. Biodiversity resources within the mine region have strong intrinsic and USE VALUES and<br />

communities there largely depend on these biodiversity resources for their LIVELIHOODS. However, in light of<br />

current agricultural practices and population growth, natural resource and biodiversity utilisation by local<br />

communities is far from sustainable in the mine region; the depletion is such that this natural capital will not be<br />

available to future generations unless fundamental changes take place. The socioeconomic impacts on the<br />

local communities from the <strong>Project</strong>’s offset programme will need to be considered. The mitigation of these<br />

impacts needs to be designed in the context of national, regional and communal plans that address long-term<br />

issues of sustainable resource use in the regions in which the <strong>Project</strong> operates.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


<strong>Project</strong> Context 13<br />

Figure 1: <strong>Project</strong> location map<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


<strong>Project</strong> Context 14<br />

2.3 Shareholders involved in offset design<br />

Shareholders: the <strong>Project</strong> is jointly owned by Sherritt Incorporated, Sumitomo Incorporated, Kores and<br />

SNC Lavalin. Each partner has played an important role in the <strong>Project</strong>’s environmental programme,<br />

including regulatory compliance, impact mitigation, risk management and design of a comprehensive<br />

biodiversity offset programme. The <strong>Ambatovy</strong> vision, besides the goal of generating attractive economic<br />

results, is to contribute significantly to the host country and to deliver outstanding safety, social and<br />

environmental performance.<br />

Government: the general offset principle is captured in the MAP (see Policy Context section above) and<br />

specific governmental entities have been involved in the offset design, including the Ministry of<br />

Environment, Water, <strong>Forest</strong>s and Tourism (MEWFT) and the Malagasy <strong>Forest</strong> Service, which have actively<br />

participated in securing the proposed offset site at Ankerana via a community-led zoning process.<br />

Lenders: the <strong>Ambatovy</strong> <strong>Project</strong> is one of the largest capital investment projects in the world and it is<br />

financially supported by a number of lender banks, most of which have adopted the EQUATOR PRINCIPLES.<br />

Lenders includes the African Development Bank (AFDB), Export Development Canada (EDC), Export-<br />

Import Bank of Korea (K-EXIM), the European Investment Bank (EIB), the Japan Bank for International<br />

Cooperation (JBIC) and various commercial banks such as Société Générale and BNP Paribas. The<br />

consideration of Performance Standard 6 in the <strong>Project</strong>’s Biodiversity Management Plan, including the<br />

taxa-specific plans, reflects this.<br />

NGOs: environmental NGOs in <strong>Madagascar</strong> are aware of the offset concept and are encouraging the<br />

<strong>Ambatovy</strong> <strong>Project</strong> to continue moving its offset programme forward in an effort to ensure NO NET LOSS on<br />

biodiversity and, preferably, net gain. However, it is worth noting that some STAKEHOLDERS voice concerns<br />

about the <strong>Project</strong>’s ability to deliver no net loss of biodiversity and are closely scrutinising the <strong>Project</strong>’s<br />

offset initiative. Given this, the <strong>Project</strong> has been actively working to enhance its offset programme in<br />

collaboration with NGOs such as CI, WCS and ERI (Eco Regional Initiative). A number of other NGOs<br />

working with the <strong>Ambatovy</strong> <strong>Project</strong> on impact mitigation have also provided valuable input to the offset<br />

design process (e.g., Groupe d’Etudes et de Recherche des Lémuriens, Henry Doorly Zoo and its<br />

<strong>Madagascar</strong> Biodiversity Program, Madagasikara Voakajy, Missouri Botanical Garden, Mitsinjo, University<br />

of Antananarivo Biology department, the South African Institute of Aquatic Biology, WWF and others).<br />

Local communities: the <strong>Project</strong> continues to engage stakeholders, including local communities, to ensure<br />

that any offset is compatible and integrated with regional and local land and resource management visions.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


3. <strong>Project</strong> Summary<br />

3.1 General project description<br />

The <strong>Ambatovy</strong> <strong>Project</strong> is a large-tonnage nickel project with an annual design capacity of 60,000 tonnes of<br />

nickel and 5,600 tonnes of cobalt. Additionally, the <strong>Project</strong> will produce 190,000 tonnes of fertiliser<br />

(ammonium sulphate) as a by-product from the refinery, a product much needed in this part of the world.<br />

The <strong>Project</strong> was permitted in December 2006 and construction began in early 2007. Production is due to<br />

begin at the end of 2010, reaching full capacity by 2013. Based on proven nickel and cobalt ore reserves, the<br />

<strong>Project</strong>’s expected lifecycle is 27 years, although operation beyond this is likely, as stored low-grade ore could<br />

become an economic commodity in the future.<br />

The locations of the main <strong>Project</strong> components are shown in Figure 2, and the key features are summarised below:<br />

The <strong>Ambatovy</strong> mine lies within the mid-altitude forests, at the westerly limit of the residual eastern rain<br />

forest known as the Ankeniheny-Zahamena Corridor. The near-primary forests of the mine area have<br />

undergone considerable human-induced pressures including hunting and gathering, selective logging,<br />

slash and burn agriculture, uncontrolled fires and species collection for trade;<br />

The slurry pipeline, buried over the majority of its route, will pass through 2 km of near-primary forest<br />

surrounding the mine, crosses a Ramsar site (avoiding the wetlands by following an old railroad spur) and<br />

traverses the Ankeniheny-Zahamena forest corridor by avoiding residual forest fragments whenever<br />

possible. It then continues to the coast through hilly terrain of the former eastern rain forest destroyed by<br />

extensive slash and burn agriculture;<br />

The industrial complex, including the processing plant and the refinery, the tailings and the harbour, is<br />

located within an anthropogenic coastal landscape in a suburban setting. The plant and harbour lay within<br />

the industrial zones of Toamasina; and<br />

The proposed Ankerana offset site, which is equidistant between the mine and Toamasina, is a large,<br />

mountainous dome covered with primary forest, encroached only by slash and burn agriculture in<br />

surrounding valleys where frontier dwellings exist. The pristine character of the site is a result of its<br />

remoteness and the low density of surrounding human populations.<br />

The <strong>Project</strong>’s principal impacts on natural systems and biodiversity will occur at the mine area, through the<br />

phased clearing of the mine footprint within an ecologically sensitive natural forest mosaic. The sensitivity of<br />

this mosaic arises from the considerable local heterogeneity in terms of geology, geomorphology, substrate,<br />

topography and meso-climate.<br />

It is widely documented that the average annual deforestation rate calculated over the period between 2000<br />

and 2005 was 0.35%. In total, between 1990 and 2005, <strong>Madagascar</strong> lost 6.2% of its forest cover,<br />

approximately 854,000 ha. The current annual loss of the residual eastern rain forest is equivalent to 14,000<br />

ha per year. The total mine footprint to be cleared (1,336 ha) represents only 0.03% of the residual eastern<br />

rain forest, estimated in 2008 at 4,012,100 ha. In consideration of the large forest loss in eastern <strong>Madagascar</strong>,<br />

the INTRINSIC VALUE of the offset area at Ankerana (11,600 ha) will increase over time as such forest estates<br />

and their associated biodiversity become rarer.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

15


<strong>Project</strong> Summary 16<br />

Figure 2: <strong>Project</strong> components map<br />

While the bulk of the residual biodiversity impact will arise in the mine area and in the upper portion of the<br />

pipeline, the <strong>Project</strong>’s offset calculation considers residual impacts from each project component including the<br />

entire slurry pipeline, the processing plant, the tailings and the harbour extension. The intention is that all<br />

residual impacts will be offset.<br />

Approximately 90% of the pipeline’s 218 km right of way will require the clearance of secondary, non-sensitive<br />

and mostly non-ligneous vegetation, which has resulted from historical slash and burn and has comparatively<br />

little biodiversity value. Disturbed land will ultimately be rehabilitated using species appropriate to current land<br />

use in the different pipeline sectors (including provision of fuel wood species to reduce pressure on native<br />

forests). However, two sections of the pipeline cross sensitive habitats:<br />

The first 2 km of zonal, near-primary forest at the mine area; these losses are integrated to the mine<br />

footprint loss calculations; and<br />

The Ankeniheny-Zahamena forest corridor area, which led to 16.5 ha of zonal forest being cleared, despite<br />

planning and routing efforts to avoid the residual primary forest fragments present there.<br />

The processing plant, currently under construction, covers 2.6 km 2 of Toamasina’s industrial zone. The<br />

tailings management facility has a footprint of 14 km 2 and is located in a highly degraded, fire-driven<br />

agricultural matrix, where irreversible, human-induced depletion of the original biodiversity occurred during<br />

historical forest clearance. The harbour expansion requires the construction of an extended pier (over 300 m)<br />

to accommodate the unloading of equipment during the construction and the importation of raw material (coal,<br />

sulphur, limestone and diesel) and the loading of nickel and cobalt briquette bags and ammonium sulphate<br />

during operation. At the <strong>Project</strong>’s industrial complex (plant, tailings management facility and harbour), most of<br />

the biodiversity values were lost many years ago through extensive habitat conversion. The <strong>Project</strong>’s ESIA<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


<strong>Project</strong> Summary 17<br />

notes that the industrial complex will have negligible residual impacts on biodiversity, which will nonetheless<br />

be traded up through the <strong>Project</strong>’s offset programme.<br />

Specific aspects of the biological environment assessed in the ESIA are being revisited through expanded<br />

BASELINE STUDIES to ensure that residual impacts are fully documented and included in the biodiversity offset<br />

calculation.<br />

The KEY BIODIVERSITY COMPONENTS in the mine area and upper slurry pipeline portion can be summarised as:<br />

Priority species, with home ranges overlapping (and or potentially overlapping) the mine footprint:<br />

<strong>–</strong> 16 lemurs species, including Prolemur simus (IUCN CR), Propithecus d. diadema (IUCN EN), Indri indri<br />

(IUCN EN), Eulemur rubriventer (IUCN VU), Daubentonia madagascarensis (IUCN NT), Hapalemur<br />

griseus (VU), Allocebus trichotis (IUCN DD);<br />

<strong>–</strong> 62 birds species, including Tyto soumagnei, Anas melleri and Ardea humbloti, Sarothura watersi (all<br />

IUCN EN);<br />

<strong>–</strong> 123 herpetofauna species, including Mantella aurantiaca (IUCN CR), M. crocea (IUCN EN), Sanzinia<br />

madagascariensis (IUCN VU);<br />

<strong>–</strong> 5 fish species of which Rheoles alaotrensis (IUCN VU) and at least two new Ratsirakia species;<br />

<strong>–</strong> 24 insects species, which are considered rare at a national level;<br />

<strong>–</strong> 376 plants including Asteropeia mcphersonii (IUCN VU), Leptolaena multiflora (IUCN EN), Dalbergia<br />

baroni (UCN VU) and the 330 species of concern which are considered rare in <strong>Madagascar</strong>;<br />

Three structurally distinct HABITAT TYPES: zonal, transitional and azonal forests (the latter including<br />

seasonal ponds and upper watershed stream systems) and their fauna and flora communities; and<br />

The landscape-level habitat assemblage with the functional interaction between the zonal, transitional and<br />

azonal forests.<br />

Section 7.3 presents more detail in the form of a Key Biodiversity Components Matrix (KBCM) and the steps<br />

followed in its completion. The full KBCM (December 2008 iteration) is provided in Appendix 1. Earlier<br />

iterations (February and April 2008) are presented in Appendices 2 and 3 respectively.<br />

3.2 <strong>Ambatovy</strong> offset programme<br />

The <strong>Ambatovy</strong> <strong>Project</strong> offset programme is a multifaceted endeavour to achieve measurable CONSERVATION<br />

OUTCOMES resulting in no net loss and preferably a NET GAIN of biodiversity. It has been adopted voluntarily to<br />

go above and beyond the <strong>Project</strong>’s impacts management strategy. The <strong>Ambatovy</strong> <strong>Project</strong> intends to<br />

implement its diversified offset portfolio, as presented in Table 2.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


<strong>Project</strong> Summary 18<br />

Table 2: <strong>Ambatovy</strong> <strong>Project</strong> offset programme<br />

#<br />

Offset<br />

component<br />

Design Implementation<br />

1 Ankerana Establishing a large off-site offset site at<br />

Ankerana, encompassing similar ABIOTIC<br />

and BIOTIC conditions to those found at<br />

the mine site. The site is located 71 km to<br />

the northeast of the mine site and would<br />

involve conservation of 11,600 ha of<br />

endangered forest, including a multiple<br />

use area of 7,000 ha and a core<br />

conservation area of 4,600 ha, within<br />

which there is a large tract of azonal<br />

forest.<br />

2 Azonal forest<br />

sites<br />

3 Mine area<br />

conservation<br />

forest<br />

4 Analamay-<br />

Mantadia<br />

forest corridor<br />

5 Torotorofotsy<br />

Ramsar<br />

6 Pipeline right<br />

of way<br />

reforestation<br />

7 Mine footprint<br />

replacement<br />

forest<br />

Protecting, for the long term, two on-site<br />

conservation sites of the azonal forest<br />

habitats that occur partially over the mine<br />

footprint that would otherwise be lost to<br />

deforestation.<br />

Ensuring long term conservation of the<br />

forest surrounding the mine footprint as<br />

part of the priority species management<br />

programme and maintenance of the<br />

ecological services for the local<br />

communities. The area consists of the<br />

establishment of 4,900 ha of buffer forest<br />

around the footprint.<br />

Promoting the landscape level<br />

connectivity of the mine area forests with<br />

the nearby Ankeniheny-Zahamena<br />

Corridor to secure long term protection of<br />

mine area biodiversity as part of the<br />

Durban Vision implementation.<br />

Supporting the Torotorofotsy Ramsar site<br />

management plan design and<br />

implementation in conjunction with<br />

government and local NGO.<br />

Enhancing FOREST CONNECTIVITY in<br />

targeted areas of the Ankeniheny-<br />

Zahamena Corridor through expanded<br />

reforestation activities along the slurry<br />

pipeline right of way.<br />

Creating a replacement, multifunctional<br />

forest on the entire footprint during<br />

progressive reclamation with an<br />

established, integrated managerial<br />

structure by mine closure.<br />

Ensure long term protection of the Ankerana offset<br />

site through the stringent legal arrangements and<br />

strong community consensus. Community<br />

motivation and consent is the highest priority of the<br />

<strong>Ambatovy</strong> <strong>Project</strong> offset implementation in its early<br />

phase and needs to be obtained before the<br />

BIODIVERSITY INVENTORIES are conducted (perceived<br />

as external intrusions by the local communities if ill<br />

prepared). Adhere to BBOP principles and<br />

guidelines for offset processes. Monitoring of<br />

efficacy of BBOP tools used and offset programme<br />

evaluation in 2011 and option analysis.<br />

Ensure permanency of on-site conservation azonal<br />

sites through legal and managerial commitments.<br />

Ensure permanency of surrounding mine area<br />

forests (see offset component #3) with same<br />

measures as mentioned above. Ensure connectivity<br />

of mine area forests with surrounding protected<br />

areas (see offset component #4).<br />

Conduct multifunctional zoning based on existing<br />

models in <strong>Madagascar</strong> and ensure management of<br />

leased lands and in areas of targeted community<br />

transfer. It is believed that site that would otherwise<br />

be lost given regional deforestation rates.<br />

Enter into formal partnerships with government,<br />

NGOs and local communities to design and develop<br />

implementation plans for the Analamay-Mantadia<br />

Corridor, that take present and future community<br />

needs into account.<br />

In partnership with government and local NGO,<br />

ensure permanency of legal and managerial<br />

commitments. In a first phase, complete zoning and<br />

management plan for Ramsar site. Development of<br />

pragmatic viable resources uses to maintain<br />

ecological functions of wetland area while<br />

community needs are met.<br />

In partnership with government and local NGOs<br />

conduct targeted reforestation of the Ankeniheny-<br />

Zahamena Corridor (CAZ) with the aim of reestablishing<br />

forest connectivity.<br />

Design and implement management plans for<br />

engineering, water management, erosion control,<br />

early vegetation establishment, targeted species<br />

reforestation, induced and facilitated secondary<br />

successions and sylviculture treatments.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


4. How the <strong>Ambatovy</strong> <strong>Project</strong> is<br />

Applying the BBOP Principles<br />

During the ESIA in 2004 and 2005, the <strong>Ambatovy</strong> <strong>Project</strong> initiated its offset programme based on an improved<br />

understanding of RESIDUAL IMPACTS and the need for developing compensatory conservation activities. In<br />

2006, <strong>Ambatovy</strong> became a BBOP PILOT PROJECT and refined its initial offset vision and the design approach<br />

was tailored according to the guidelines provided by the BBOP Secretariat and Advisory Committee.<br />

The BBOP PRINCIPLES ON BIODIVERSITY OFFSETS were finalised in December 2008 3 , following several years of<br />

groundwork including the development of draft guidance and tools. The <strong>Project</strong>’s offset initiative was<br />

developed alongside, and is generally well-aligned with, the BBOP Principles. The <strong>Project</strong>’s alignment with the<br />

BBOP Principles is illustrated in more detail in Section 7. The <strong>Project</strong> applies the BBOP Principles as follows:<br />

1. No net loss:<br />

The <strong>Project</strong>’s aim is to achieve measurable conservation outcomes that deliver NO NET LOSS of biodiversity<br />

and a possible net gain through a mix of complementary offset and mitigation activities, including:<br />

An offset site at Ankerana that contains a core conservation area designed to compensate for the <strong>Project</strong>’s<br />

residual impacts on azonal forest biodiversity.<br />

Protection of viable tracts of azonal forest habitats through the set-aside of two specific on-site azonal<br />

forest habitat conservation zones within the forests surrounding the mine footprint (see next point).<br />

Implementation of a ‘no species EXTINCTION’ commitment and protection of forests surrounding the mine<br />

footprint to ensure the long-term viability of priority species populations impacted by the <strong>Project</strong>. This<br />

approach would include the on-site azonal forest habitat conservation zones and mechanisms to control<br />

current human pressure on these areas.<br />

Design and implementation of protection measures for an existing residual forest corridor linking forests<br />

surrounding the mine area and the Mantadia National Park to ensure landscape-level forest connectivity.<br />

Targeted reforestation of the Ankeniheny-Zahamena Corridor, in partnership with government and local<br />

NGOs, to re-establish forest connectivity between Mantadia National Park and the Man and the Biosphere<br />

Private Reserve.<br />

Development of the Ramsar Torotorofotsy Management Plan in partnership with government and local<br />

NGOs, and contribution to its subsequent implementation.<br />

Progressive rehabilitation at the mine site to produce a multifunctional replacement forest with reinstated<br />

biodiversity values to be included in the offset calculation.<br />

To date, the <strong>Project</strong>’s offset planners have used BBOP guidance and methodologies to assess the impact on<br />

biodiversity and to identify potential sites for biodiversity offsets. BBOP methodologies will also be followed to<br />

3 The full text of the BBOP Principles is available in the BBOP document “Business, Biodiversity Offsets and BBOP: An Overview” <strong>–</strong><br />

see www.forest-trends.org/biodiversityoffsetprogram/guidelines/overview.pdf.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

19


How the <strong>Ambatovy</strong> <strong>Project</strong> is Applying the BBOP Principles 20<br />

determine the scale of the offset required to deliver no net loss, to verify that no net loss has been achieved<br />

and to define implementation measures that will ensure the long-term sustainability of the offset.<br />

2. Additional conservation outcomes:<br />

The <strong>Project</strong> is designing and implementing conservation activities that are predicted to deliver ADDITIONALITY,<br />

as summarised below for each of the <strong>Project</strong>’s components:<br />

The proposed Ankerana offset site is currently being integrated within the recently established SAPM<br />

(National Protected Areas System) under the Durban Vision. However, there is a significant shortfall in the<br />

financial and human resources to offer protection to all these areas and the Durban Vision can only be<br />

implemented if an array of different partners commits to developing the required financial and human<br />

resources. Through the proposed offset, the <strong>Project</strong> will play a role in that development process.<br />

Historically the azonal forest habitats of <strong>Ambatovy</strong> and Analamay have suffered significant anthropogenic<br />

impacts (e.g., from hunting and gathering, destructive honey collection, fire, charcoal, slash and burn, and<br />

the pet trade). The long-term survival of this habitat in the absence of the <strong>Project</strong> is far from proven. This is<br />

clearly seen in the baseline data for the mine area: of the total area of 1,347 ha of azonal forest habitat in<br />

the mine area, only 60% is of prime quality, the rest being significantly degraded before the project was<br />

established. While the mine development is predicted to impact 590 ha of prime quality azonal forest<br />

habitat, 212 ha (26.4% of the total prime quality habitat) will be preserved through the <strong>Project</strong>’s on-site<br />

azonal habitat conservation initiative. The likelihood of successful conservation of a viable portion of the<br />

unique azonal forest habitat at <strong>Ambatovy</strong> is therefore significantly increased by the presence of the <strong>Project</strong>.<br />

Similarly, the zonal forests surrounding the mine footprint have experienced historic anthropogenic impacts<br />

such as forest structure modification (logging), species composition modification though canopy openings<br />

(invaders, heliophytes), FOREST FRAGMENTATION through clear cutting, and plain, irreversible loss of forest<br />

areas. The <strong>Project</strong> has committed to preserving the residual forests of the mine area by, for example,<br />

implementing forest community transfer 4 to avoid further anthropogenic losses. Such additionality, if clearly<br />

established, will be included in the offset calculations once data and a model for the rate of regional<br />

deforestation are available.<br />

In the long-term, the forests of the mine area and Mantadia National Park are likely to become isolated<br />

unless the existing forest corridor that links these areas is managed and protected. The loss of this corridor<br />

would cause landscape-level forest fragmentation and jeopardise the long-term viability of populations of<br />

critical species that the project has committed to protect at the mine area. As of December 2008, the forest<br />

corridor has not been included in the first zoning approximation of the Durban Vision. The <strong>Project</strong> and its<br />

partners plan to create a westerly extension of the Durban Vision zoning to incorporate this area in the<br />

protection zone of the Ankeniheny-Zahamena Corridor. <strong>Forest</strong> loss avoidance via the successful<br />

management and protection of the corridor will be taken into account in offset calculations based on a fair<br />

assessment of the resulting additionality.<br />

The Ramsar Torotorofotsy site is experiencing considerable pressure from inward migration, the drainage<br />

of wetlands and subsequent conversion to rice paddies, wildfires, slash and burn activities in the forested<br />

watersheds, hunting and the pet trade. The National Committee on Ramsar (CONARAMS) has given a<br />

local NGO (Mitsinjo) the mandate to design and implement a management plan. <strong>Ambatovy</strong> has joined this<br />

effort as a partner and will work with Mitsinjo and others to enhance the management plan. The first step<br />

4 The targeted forest areas are jointly managed with local communities, using a defined management programme that meets<br />

conservation and sustainable use requirements.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


How the <strong>Ambatovy</strong> <strong>Project</strong> is Applying the BBOP Principles 21<br />

will be to establish a functional zoning that results in the avoidance of BIODIVERSITY LOSS, which will be<br />

taken into account in offset calculations, again based on a fair assessment of the resulting additionality.<br />

Reforestation activities to reconnect residual patches of primary forests at the perimeter of the slurry<br />

pipeline right of way within the Ankeniheny-Zahamena Corridor will contribute to an overall corridor<br />

defragmentation. The areas to be reforested sit outside of the SAPM and will be accounted for in the offset<br />

GAIN calculation as clearly additional outcomes.<br />

3. Adherence to the mitigation hierarchy:<br />

Given the <strong>Project</strong>’s setting (high regional biodiversity and endemicity), rigorous biodiversity management is<br />

necessary to meet its policy of ‘no net harm to biodiversity’. Before considering biodiversity offsets, the<br />

<strong>Ambatovy</strong> <strong>Project</strong> implemented appropriate avoidance and minimisation measures according to the<br />

MITIGATION HIERARCHY, for example:<br />

AVOIDANCE: analysis of pipeline route alternatives, including the study of 21 major re-routes to avoid<br />

ecologically, socially and culturally sensitive areas; avoidance of other sensitive areas during the<br />

development of other <strong>Project</strong> components whenever possible. Also, set-aside of an area of the ore body<br />

that would otherwise be mined as the foundation of the on-site azonal habitat conservation initiative.<br />

Minimisation: reduction of the surface area subject to impacts through appropriate design and<br />

implementation.<br />

<strong>–</strong> Early (2004 / 05) impact mitigation through the rehabilitation of 50 km of exploration roads and<br />

platforms in the mine area.<br />

<strong>–</strong> Mitigation of impacts following forest clearance through biodiversity rescue and management programs<br />

(lemurs, small mammals, herpetofauna and fish).<br />

<strong>–</strong> Management of surges in total suspended solids to protect water quality and aquatic biodiversity in<br />

seven affected watersheds downstream of the mine site using large retention dams (at a cost of US$ 40<br />

million).<br />

Restoration / rehabilitation: planned progressive rehabilitation of the mine site footprint to create a<br />

replacement forest with reinstated biodiversity values and reduce the net residual impact.<br />

4. Limits to what can be offset:<br />

The <strong>Ambatovy</strong> <strong>Project</strong> currently believes that all its direct residual impacts on biodiversity are OFFSETABLE. No<br />

habitat or species (flora and fauna) ENDEMIC to the mine footprint alone have been identified during the<br />

thorough investigations to date. Nevertheless, given the high levels of biodiversity and endemicity around the<br />

<strong>Project</strong>, field studies will continue as the mine is developed and forest clearance progresses.<br />

In contrast, the <strong>Project</strong> believes that there are limits to offsetting certain social impacts. For local communities,<br />

there were few legal and cultural constraints on the exploitation of natural resources and biodiversity prior to<br />

the arrival of the mine. In light of forest clearance during development of the mine and the <strong>Project</strong>’s<br />

commitment to conserve the surrounding forests by introducing a zoned approach to forest use, the local<br />

communities’ existing way of life, including unsustainable use of biodiversity, will undoubtedly be disrupted.<br />

The <strong>Ambatovy</strong> <strong>Project</strong> believes that this disruption cannot be entirely offset and also that, in light of dwindling<br />

forest resources and population growth, it is desirable from a BIODIVERSITY CONSERVATION perspective to seek<br />

to break the cycle of unsustainable use by local communities and replace it with a more sustainable model.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


How the <strong>Ambatovy</strong> <strong>Project</strong> is Applying the BBOP Principles 22<br />

The present unfettered community exploitation of resources may reflect a lack of community empowerment<br />

and choice. Hence, the changes envisioned by the <strong>Project</strong> (sustainable, participatory forest use) may<br />

ultimately be viewed by local communities as a positive transformation relative to the current situation.<br />

The same concept applies to the Ankerana offset site where the <strong>Project</strong> believes that the pre-project<br />

socioeconomic conditions should not be, and ultimately cannot be, maintained. While this change can also not<br />

be offset, the <strong>Project</strong> believes the change to sustainable use of natural resources will ultimately be to the<br />

benefit of both local communities and biodiversity.<br />

5. Landscape context:<br />

The spatial spread of the <strong>Project</strong> has driven the integration of planned conservation activities with regional<br />

and landscape-level environmental and social initiatives. At the mine, the landscape approach currently<br />

consists of maintaining forest connectivity between the on-site azonal habitat conservation zones (and<br />

rehabilitated areas as these progress) and the surrounding forests. Moreover, forest connectivity between the<br />

mine area and the Ankeniheny-Zahamena Corridor will be maintained through landscape-level designs and<br />

interventions in line with the Durban Vision to increase the surface areas of protected areas in <strong>Madagascar</strong>;<br />

the development of this programme is at an early stage and aims to be conducted in collaboration with<br />

Conservation International. At Ankerana, the offset design is based on a phased and spatially concentric,<br />

landscape-level approach. Long-term community needs have been identified and participative zoning has<br />

been completed.<br />

6. Stakeholder participation:<br />

The <strong>Project</strong> is committed to stakeholder PARTICIPATION and has made significant progress with local<br />

communities and NGOs. Examples include interaction during the integration of the <strong>Ambatovy</strong> <strong>Project</strong> offset<br />

programme with national, regional and local plans and community involvement at the heart of the zoning<br />

project at the proposed Ankera offset site. In the latter example, a functional, participatory forest zoning<br />

process is being implemented by the community with assistance from the <strong>Forest</strong> Services and the help of<br />

local NGOs. This will result in areas identified for multiple-use at the periphery of the offset site being<br />

transferred to the community as stipulated by Malagasy law and promoted in the regional plan.<br />

7. Equity:<br />

While the <strong>Ambatovy</strong> <strong>Project</strong> is committed to BBOP Principles 6 and 7, insufficient data are currently available<br />

to apply the latter strictly. As data become available, the <strong>Project</strong> will develop its cost-benefit model and<br />

analysis using key elements of the BBOP BIODIVERSITY OFFSET COST-BENEFIT HANDBOOK 5 and in consultation<br />

with stakeholders. The <strong>Project</strong> is currently in the process of establishing a strategy to implement the socioenvironmental<br />

action programme, including assessing natural resources usages by the local communities at<br />

the Ankerana and mine sites, further to which dollar value of the losses will be determined and compensation<br />

options identified and provided.<br />

8. Long-term outcomes:<br />

The <strong>Ambatovy</strong> offset programme for the mine region, comprising on-site azonal habitat conservation,<br />

community-based forest management, forest connectivity of mine area, Ramsar wetland management, forest<br />

5 Available at www.forest-trends.org/biodiversityoffsetprogram/guidelines/cbh.pdf.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


How the <strong>Ambatovy</strong> <strong>Project</strong> is Applying the BBOP Principles 23<br />

corridor rehabilitation and the proposed Ankerana offset, is being designed for long-term success following its<br />

implementation. Four activities will support the long-term outcomes:<br />

Strong community involvement throughout the planning, designing and implementation phases with the<br />

development of complementary sustainable activities in the surrounding agricultural matrix and in the<br />

multiple use area of the forests surrounding the critical habitats (core areas). Appropriate joint activities are<br />

being identified as the result of ongoing stakeholder interaction and data gathering.<br />

Development of financial strategies, mechanisms, and commitments as the operational phase of the<br />

<strong>Project</strong> begins (2011), based on the analysis of stakeholder needs and the <strong>Project</strong>’s predicted economic<br />

operating environment. In light of the ongoing financial crisis and the resulting economic uncertainties,<br />

ADAPTIVE MANAGEMENT strategies will play a key role in securing long-term financing for the <strong>Ambatovy</strong><br />

offset programme.<br />

Identification of long-term governmental legal and political commitment to protect the conservation sites in<br />

the mine region and the proposed offset site at Ankerana. A high level of commitment is expected as<br />

elements of the mine area and the proposed offset site have been designed to fall under the future<br />

Malagasy protected area system (SAPM), which itself is a part of the Presidential Durban commitment and<br />

which is expected to attract significant outside funding as a result of a global concern for biodiversity.<br />

Determining the institutional arrangements for managing the offset sites into the long-term. It has not yet<br />

been decided how the Ankerana site will be managed, with all options remaining open, i.e., managed by<br />

governmental institutions, by an NGO, by the community, by the company or a combination of any of the<br />

foregoing. The on-site conservation zones forests will be managed by the <strong>Project</strong>, the FOREST<br />

CONNECTIVITY programme will likely be community-based, while the Ramsar site has a defined<br />

management structure.<br />

9. Transparency:<br />

The <strong>Ambatovy</strong> <strong>Project</strong>’s intention to offset its residual impacts on biodiversity is a commitment developed in<br />

the ESIA, which has undergone thorough public consultation, hearings and a public information process.<br />

Consequently, the <strong>Project</strong>’s strategic environmental and social commitments are in the public domain and its<br />

offset activities have been, and are being, scrutinised by the Malagasy environmental authorities, regional and<br />

international NGOs, the local communities and the lender banks. Since becoming a BBOP Pilot <strong>Project</strong>,<br />

<strong>Ambatovy</strong> has committed to ensuring that design (and ultimately implementation) activities are completed in a<br />

transparent fashion. Transparency allows the <strong>Project</strong> to ensure stakeholders are well informed and able to<br />

offer insightful feedback that contributes to the optimisation of conservation outcomes.<br />

10. Science and traditional knowledge:<br />

In order to evaluate residual impacts on biodiversity and quantify the required offset, the <strong>Project</strong> has applied<br />

established and developing scientific methodologies. In parallel, traditional knowledge is being utilised (for<br />

example, species identification in time and space, identification of species’ utilisation by humans (medicinal)<br />

and animals (fruit trees), and land use patterns (plant-substrate relationships)).<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


5. Current Status of the <strong>Project</strong><br />

and Offset<br />

5.1 <strong>Project</strong> chronology and status (as of December 2008)<br />

1960: Genim, a French company, conducts exploration drilling and identifies the <strong>Ambatovy</strong> and Analamay<br />

nickel cobalt ore bodies; environmental considerations of the early feasibility study were very limited and<br />

did not consider vegetation anomalies nor the importance of nearby wetland (e.g. using Torotorofotsy for<br />

tailings disposal);<br />

1970: Under the President of <strong>Madagascar</strong>, Didier Ratsiraka, a partnership with North Korea leads to the<br />

analysis of a bulk sample that confirmed the existence of nickel and cobalt but which led to no further<br />

development; environmental considerations were absent during exploration (e.g. no rehabilitation of test<br />

pit, which remains unvegetated today);<br />

1994 <strong>–</strong> 1997: Phelps-Dodge conducts exploration drilling and develops a feasibility study and an ESIA (not<br />

submitted to ONE); vegetation anomaly recognised and quantified (vegetation map), biological inventories<br />

created; management principles for surrounding forests conceptualised; importance of azonal habitats<br />

recognised;<br />

1998 <strong>–</strong> 2003: Restoration of exploration roads and platforms undertaken in light of <strong>Project</strong> development<br />

uncertainties;<br />

2003 <strong>–</strong> 2006: Dynatec conducts exploration drilling and develops a feasibility study and an ESIA; Final<br />

Investment Decision taken by the investors (Dynatec and partners); on-site and offset conservation ideas<br />

captured in the ESIA; <strong>Ambatovy</strong> becomes BBOP pilot <strong>Project</strong>; ESIA was permitted by ONE on December<br />

1 st , 2006; and<br />

2007 <strong>–</strong> 2008: Elaboration of the <strong>Ambatovy</strong> <strong>Project</strong> thematic Environmental and Social Plans (18 plans: air,<br />

noise, water etc and biodiversity); implementation of Biodiversity Action Plan (and others), development of<br />

priority TAXA-specific draft management plans (lemur, Mantella species, fish and flora). Confirmation of<br />

shareholders and loans and start of construction.<br />

5.2 Offset chronology and status (as of December 2008)<br />

2004 <strong>–</strong> 2005: Concept of biodiversity offset integrated with other <strong>Project</strong> activities, with a preliminary<br />

survey of proposed offset site undertaken and documented in the ESIA; proposed offset site selection<br />

based on geological, substrate, altitude and forest structure similarity (relative to principal IMPACT SITE);<br />

2006: <strong>Ambatovy</strong> <strong>Project</strong> selected as a BBOP Pilot <strong>Project</strong> at Pretoria meeting;<br />

2007: Participation in BBOP meetings (London and Bainbridge) and contribution to development of BBOP<br />

handbooks and guidelines; concepts for Ankerana site management programme developed and zoning<br />

initiated;<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

24


Current Status of the <strong>Project</strong> and Offset 25<br />

2008:<br />

<strong>–</strong> Preparation of interim report outlining technical aspects of the offset process (e.g. benchmark<br />

selection, confirmation of impacts, preliminary loss calculations and completed Key Biodiversity<br />

Components Matrix (KBCM);<br />

<strong>–</strong> Preparation of supplementary report with revised benchmark selection and loss calculations, including<br />

updated KBCM with quantitative species data;<br />

<strong>–</strong> Preparation of complementary field work (terrestrial fauna) in response to gap analysis; inclusion of other<br />

<strong>Project</strong> components (pipeline, tailings, plant and harbour) in overall assessment of residual impacts;<br />

<strong>–</strong> Implementation of Ankerana site management programme:<br />

Stakeholder consultations (local communities, NGOs and government including Office National<br />

l’Environnement (ONE,) <strong>Forest</strong>ry Department, Gendarmerie, District of Brickaville, local mayors and<br />

police forces);<br />

Reforestation work on periphery area of proposed offset; this focused mainly on planting wood for<br />

construction uses to avoid primary forest logging in the offset area;<br />

Population awareness campaigns around the proposed offset, conducted by field teams and<br />

partners. The objectives of the campaigns were to define the offset site boundary and explain<br />

existing laws that prohibit forest clearance;<br />

Support provided to the mixed brigade (includes local communities, NGOs, local administrative staff<br />

and the police force) which manages forestry resource exploitation through out the local communes;<br />

Financial and logistic support to update the five year Communal Development Plans for impacted<br />

communes; and<br />

Technical committee meeting with SAPM focusing on integration of the proposed offset site with the<br />

national protected areas network.<br />

Conceptualised and pending (for 2009):<br />

<strong>–</strong> The offset design work, following guidance in the BBOP BIODIVERSITY OFFSET DESIGN HANDBOOK has to<br />

date quantified biodiversity losses as presented below. The next phase of work will be to calculate<br />

offset gains and continue with the design of the offset and offset activity plan;<br />

<strong>–</strong> The proposed Ankerana offset site has undergone only preliminary characterisation. Detailed baseline<br />

ecological characterisation is planned for 2009 focusing on ecosystems, habitats, fauna, flora and<br />

socioeconomic attributes. This information will underpin the calculation of offset gains;<br />

<strong>–</strong> Socio-environmental losses will be defined and subsequently an appropriate compensation calculation<br />

strategy and programme will be designed; and<br />

<strong>–</strong> Continued interaction with stakeholders to refine and enhance the offset activity plan.<br />

In summary, the <strong>Project</strong> is committed to designing and financing a long-term offset programme that aims at<br />

achieving NO NET LOSS on biodiversity and preferably NET GAIN. Substantial progress has been made by<br />

calculating the residual impacts on biodiversity and identifying potential offset mechanisms. <strong>Ambatovy</strong> will<br />

continue to work closely with stakeholders on the offset design and plan the financial mechanisms to secure<br />

the offsets in the long-term, using adaptive management in response to the insecurities of the global financial<br />

crisis. The following pages of this case study detail the actions conducted and those that are planned for the<br />

future.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


6. Business Case for a<br />

Biodiversity Offset<br />

The vision of the <strong>Ambatovy</strong> <strong>Project</strong> is stated as follows: The <strong>Ambatovy</strong> partnership will develop and operate a<br />

sustainable nickel / cobalt mining and processing enterprise that significantly contributes to our host country,<br />

delivers outstanding safety, environmental and social records and generates attractive economic returns.<br />

The environmental strategy designed to honour the <strong>Project</strong>’s vision to deliver outstanding environmental<br />

records consists of:<br />

Ensuring full regulatory compliance and conformity with international loan agreements;<br />

Minimising residual impacts through the stringent application of the mitigation hierarchy;<br />

Reducing environmental risks through dynamic management guided by Malagasy know-how and<br />

stakeholder consultation; and<br />

Producing positive CONSERVATION OUTCOMES on biodiversity through the offset programme that aims at<br />

achieving no net loss on biodiversity, and possibly net gain, in order to sustain ‘a good citizen project’<br />

status in a host country recognised as constituting a biodiversity hotspot.<br />

The business benefit of its offset programme is essentially linked to risk management. As a world class mining<br />

project, <strong>Ambatovy</strong> and its shareholders believe in demonstrating good environmental management practices<br />

to secure its license to operate. To <strong>Ambatovy</strong>, a license to operate consists of the permanent support of civil<br />

society, local communities, national and international NGOs and governmental authorities in the manner<br />

social and environmental affaires are managed. Because <strong>Madagascar</strong>’s biodiversity is universally considered<br />

of utmost importance by national and international STAKEHOLDERS producing positive conservation outcomes<br />

that offset the residual impacts on biodiversity is a critical component of this license to operate.<br />

It is recognised by the <strong>Project</strong>’s shareholders that the <strong>Ambatovy</strong> offset programme has provided additional<br />

confidence to the lender banks in securing access to capital. This has created reputational benefits to the<br />

shareholders that can result in easier access to land, human and financial resources for future projects in<br />

<strong>Madagascar</strong> and elsewhere in the world. It is expected that this approach will result in competitive advantage<br />

for the shareholders in relation to other governments.<br />

Conversely, bad environmental practice is bound to produce higher operating costs, expensive permit delays,<br />

liabilities, and lost revenues. Consequently, engaging in good environmental practice will maximise the overall<br />

long-term economic return to shareholders, stakeholders and government.<br />

It is worth mentioning that the Malagasy governmental policy, through the <strong>Madagascar</strong> Action Plan, refers to<br />

biodiversity offsets. The <strong>Ambatovy</strong> offset programme under the BBOP guidance is thus aligned with<br />

<strong>Madagascar</strong>’s endeavour to protect its unique biodiversity heritage.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

26


Business Case for a Biodiversity Offset 27<br />

In summary, <strong>Ambatovy</strong> believes that its offset programme will bring about the following advantages:<br />

Continuing access to land and capital;<br />

Increasing investor confidence and loyalty;<br />

Reducing risks and liabilities;<br />

Strengthening relationships with local communities, government regulators, environmental groups and<br />

other stakeholders;<br />

Building trust on a credible reputation for environmental and biodiversity related management performance<br />

and winning a ‘social license to operate’;<br />

Increasing ‘regulatory goodwill’ which leads to faster permitting;<br />

Influencing emerging environmental regulation and policy;<br />

Developing more cost effective means of complying with increasingly stringent environmental regulations;<br />

Taking advantage of ‘first mover’ benefits in the marketplace <strong>Madagascar</strong>;<br />

Maximising strategic opportunities in the new markets and businesses emerging as biodiversity offsets<br />

become more widespread; and<br />

Improving staff loyalty.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


7. The Offset Design Process<br />

7.1 Guidance and methodologies used<br />

The <strong>Ambatovy</strong> biodiversity offset programme has been developed as an iterative process calling upon BBOP<br />

principles and guidance. Additional inputs towards the development of the <strong>Project</strong>’s offset programme came<br />

from a number of recent good practice guides, including Good Practice Guidance for Mining and Biodiversity<br />

(International Council on Mining and Metals 2006), Planning for Integrated Mine Closure: Toolkit (International<br />

Council on Mining and Metals 2008), Performance Standard 6: Biodiversity Conservation and Sustainable<br />

Natural Resource Management (International Finance Corporation 2006) and Biodiversity Offsets: Views,<br />

Experience, and the Business Case (ten Kate et al. 2004).<br />

The BBOP guidance supports the development of either single or COMPOSITE OFFSET sites to compensate for<br />

residual impacts on biodiversity. The <strong>Ambatovy</strong> offsets programme is multifaceted because it is a large project<br />

with many components (see Section 3.2). While the design and implementation of the several components of<br />

the <strong>Ambatovy</strong> offset programme has progressed, the predicted conservation outcomes from these various<br />

offset components have not yet been fully calculated. Meanwhile, <strong>Ambatovy</strong> has focused on its proposed<br />

Ankerana offset as the most significant component of its offset. The proposed Ankerana offset design is<br />

based on the guidance in the draft BBOP Biodiversity Offset Design Handbook revised in December 2008<br />

(available at www.forest-trends.org/biodiversityoffsetprogram/guidelines/odh.pdf). However, the high<br />

degree of social sensitivity around Ankerana has led the project to undertake community involvement before<br />

the planned biodiversity assessment at the site.<br />

7.2 Roles and responsibility<br />

The <strong>Ambatovy</strong> offset programme is designed, implemented and financially supported by the <strong>Ambatovy</strong><br />

<strong>Project</strong>. The offset commitment was reiterated by Sherritt Incorporated, the <strong>Project</strong>’s operator, in November<br />

2008 during a clarification meeting with the BBOP Secretariat and representatives of <strong>Forest</strong> <strong>Trends</strong>, CI and<br />

WCS. The offset programme is managed and monitored by the <strong>Project</strong>’s environmental department. Since<br />

<strong>Ambatovy</strong> became a BBOP Pilot <strong>Project</strong>, the BBOP Secretariat and members of the BBOP Advisory<br />

Committee have also monitored progress. Senior <strong>Project</strong> representatives attend all BBOP meetings and<br />

provide updates and feedback to the BBOP Secretariat. The <strong>Project</strong>’s BBOP team includes:<br />

A focal point (Pierre O. Berner, Environmental Director, <strong>Ambatovy</strong> <strong>Project</strong>);<br />

A full time consultant responsible for supporting the offset programme management implementation<br />

(Steven Dickinson of Golder Associates / <strong>Ambatovy</strong> <strong>Project</strong>);<br />

An ecological assessment consultant responsible for the benchmark, loss and gain calculations (Aristide<br />

Andrianarimisa of WCS); and<br />

Environmental superintendent (monsieur Alphonse) leading a technical environmental and social field team<br />

responsible for social and environmental management at the proposed Ankerana offset site. This team led<br />

consultations with local stakeholders, including local communities, local forestry and police authorities and<br />

local NGOs. A legal team is supporting the superintendent to ensure the legal protection status of the<br />

Ankerana site.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

28


The Offset Design Process 29<br />

7.3 The offset design process<br />

7.3.1 Step 1: Review project scope and activities<br />

The nature, scope and geographical location of the <strong>Ambatovy</strong> offset programme was outlined in the ESIA as a<br />

COMPENSATION measure that would go above and beyond the expected regulatory commitments. The basic<br />

<strong>Ambatovy</strong> offset concept was presented and discussed in the many stakeholder public information meetings<br />

associated with the ESIA review. As <strong>Ambatovy</strong> was accepted as a BBOP Pilot project in 2006, a more<br />

structured approach was developed, which led to the multifaceted programme outlined in Section 3.2.<br />

7.3.2 Step 2: Review the legal framework and / or policy context for a biodiversity offset<br />

The key elements of the legal framework and policy context for the <strong>Ambatovy</strong> <strong>Project</strong>’s biodiversity offset<br />

programme comprise the MECIE decree, the <strong>Madagascar</strong> Action Plan (MAP) 2007 <strong>–</strong> 2012, the regional and<br />

communal development plans and the EQUATOR PRINCIPLES. Further information on these and other regulatory<br />

requirements is provided in Section 2.1.<br />

7.3.3 Step 3: Initiate a stakeholder participation process<br />

As noted previously, the <strong>Ambatovy</strong> <strong>Project</strong> obtained its permit from the Malagasy regulatory authorities in<br />

December 2006, based on a large ESIA that involved public information, consultation and enquiry throughout<br />

the development and review process. Subsequently stakeholder consultations have been central to<br />

discussions on integrating the offset programme with national, regional and local plans. At the Ankerana offset<br />

site, the community buy-in process is progressing well and precedes the hard-core biological assessment that<br />

can only be conducted after full community participation is demonstrated.<br />

The offset stakeholder participation process can be summarised as:<br />

Confirming key stakeholders (the JV partners, government, financiers, NGOs and local communities, see<br />

Section 2.3);<br />

Engaging stakeholders in the offset design process by presenting and discussing the offset’s objectives<br />

and the proposed implementation process;<br />

Engaging communities in the offset design process by assessing the impact the offset will bring about and<br />

agreeing on an acceptable MITIGATION strategy; and<br />

Integrating stakeholder feedback into the design process, especially with respect to land use in the multiple<br />

use areas (site zoning); this part of the process is in its initial stage and will continue throughout the offset<br />

zoning processes.<br />

7.3.4 Step 4: Determine the need for an offset based on residual adverse effects<br />

This section describes how the <strong>Ambatovy</strong> offset planning team:<br />

1. Assessed the likely impacts on biodiversity caused by the <strong>Ambatovy</strong> <strong>Project</strong>;<br />

2. Prepared a Key Biodiversity Components Matrix (KBCM);<br />

3. Applied the mitigation hierarchy;<br />

4. Determined residual impacts; and<br />

5. Checked whether these residual impacts could be offset.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 30<br />

7.3.4.1 Assessing biodiversity impacts<br />

Biodiversity impacts are presented in the <strong>Project</strong>’s 2006 ESIA. The ESIA BASELINE and impact analysis<br />

(including CUMULATIVE IMPACTS) followed World Bank (IFC, International Finance Corporation) standards.<br />

A formal summary is available at:<br />

http://www.sherritt.com/doc08/files/coal/abatovy/EA<strong>Ambatovy</strong>_EnglishSummary.pdf.<br />

Details of the biodiversity impacts are available in Volume J of the full ESIA report (full document available in<br />

French or English, on CD, through the <strong>Ambatovy</strong> <strong>Project</strong> or the Malagasy Ministry for Environment).<br />

The <strong>Project</strong>’s main impacts will occur at the mine site, through the progressive clearing of the mine footprint<br />

(total footprint of 2,126 hectares, of which 1,336 ha will result from clearance and the balance resulting from<br />

indirect (edge effect) impacts around the cleared area) located within an ecologically sensitive natural forest<br />

mosaic of the eastern mid-altitudinal forest corridor. Stringent impact avoidance and minimisation strategies<br />

were applied in the design phase of the <strong>Project</strong>, so RESIDUAL IMPACTS on biodiversity from the other key<br />

<strong>Project</strong> components, most of which lie in heavily degraded areas, are of less significance (but will nonetheless<br />

be offset). These include pipelines, the processing plant and refinery, tailings management facility and pier<br />

extension (see Section 3 for a summary of associated impacts).<br />

As the <strong>Project</strong> has evolved, specific aspects covered in the ESIA are currently being revisited to ensure that<br />

no residual impacts to biodiversity have been neglected. Any further residual impacts identified will be<br />

included in the biodiversity offset calculation.<br />

7.3.4.2 Key Biodiversity Components Matrix (KBCM)<br />

Key biodiversity components<br />

KEY BIODIVERSITY COMPONENTS were identified for the impact area, including mainly species and habitats, but<br />

also landscapes / ecosystems. The completed key biodiversity components matrix (KBCM) conveys the<br />

essence of the character of the site by identifying a range of its highest biodiversity values. The KBCM can<br />

help ensure that the offset generates additional conservation outcomes for these key biodiversity values, and<br />

the matrix can also contribute to the design of the BENCHMARK that will help with the calculations of residual<br />

BIODIVERSITY LOSS caused by the <strong>Project</strong> (see Appendix 1) and the gain that will be achieved through the<br />

offset. Both intrinsic and NON-USE VALUES of key species and habitats / ecosystems were assessed according<br />

to their significance level and IRREPLACEABILITY. The KBCM based on the current data is in Appendix 1. The<br />

<strong>Project</strong> will conduct additional surveys and improve analysis of existing data during 2009.<br />

The key biodiversity components listed here will subsequently be considered during the offset site selection 6<br />

and characterisation stage.<br />

7.3.4.3 Applying the mitigation hierarchy<br />

Prior to consideration of biodiversity offsets, the <strong>Ambatovy</strong> <strong>Project</strong> implemented appropriate avoidance,<br />

minimisation and restoration measures through its Biodiversity Management Plan (BMP) to avoid species<br />

EXTINCTION and EXTIRPATION (all IUCN EN and CR species), avoid sensitive areas where possible and<br />

minimise impacts on flora, fauna and aquatic resources.<br />

6 A rapid assessment of the Ankerana site provided preliminary species-level data. The potential offset site is located within the same<br />

biogeographical setting as the impact area, so it is anticipated that more detailed assessments will also reveal the presence of the key<br />

biodiversity components at Ankerana.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 31<br />

Specific avoidance strategies include the use of conservation barriers to physically isolate the on-site azonal<br />

conservation areas from construction activities in surrounding areas and ensure that modification of the mine<br />

footprint follows a strict environmental protocol (see Appendix 4: Protocol for Mine Area Modification).<br />

A very substantial minimisation programme was implemented through the BMP. Significant activities include:<br />

Directional and paced forest clearance to optimise the natural migration of terrestrial fauna. Clearance<br />

procedures are provided to the forest clearing team manager as part of <strong>Forest</strong> Clearing Biodiversity Action<br />

List procedure; the proper implementation of the actions is monitored on a daily basis by the mine<br />

environmental team and any deviation reported for immediate corrective action.<br />

Repetition of full biological surveys in the clearing perimeter and surrounding areas prior to any forest<br />

clearance in order to inventory fauna taxa present, particularly priority species (IUCN Endangered [EN] and<br />

Critically Endangered [CR] categories) but also including lemurs, other mammals, birds, reptiles and<br />

amphibians. The surveys facilitate the development of taxa-specific mitigation measures. For example, a<br />

representative sample of individuals from all lemur species are captured and fitted with radio collars and<br />

subcutaneous microchips in order to monitor their ability to migrate from an area as it is cleared and the<br />

receiving populations’ behaviour on arrival of displaced groups in their territory. For plants, a list of species<br />

of concern (SOC) was drawn up during ESIA baseline studies in collaboration with the <strong>Project</strong>’s botanical<br />

expert partner. Pre-clearance work involves identifying whether SOC are present in the clearing perimeters<br />

and searching for these SOC outside the mine footprint (in protected areas) to avoid potential species<br />

extinction. For fish in streams, a spatial and genetic survey (endemicity assessment) was conducted to<br />

determine whether the species present were ENDEMIC to the mine footprint. Until genetic results became<br />

available, fish from impacted streams were recovered and temporarily maintained in aquaculture systems;<br />

subsequent management actions are currently being undertaken.<br />

Monitoring of fauna during and after clearance. For example, lemur spatial dispersion is monitored during<br />

forest clearance to assess their capacity to (i) migrate (avoid immediate impacts); (ii) settle in their new<br />

home range (a medium-term impact) and (iii) reproduce and maintain population viability (a long-term<br />

impact). Biomedical health is assessed in parallel to behavioural assessments with the aim of improving<br />

analysis of trends in the <strong>Project</strong>’s long-term lemur population viability assessment programme.<br />

Salvaging activities focused on fauna likely to require human aid to migrate towards refuge areas (the<br />

conservation zones shown in green on Figure 3). A crew of 80 technical agents was trained by experts to<br />

identify and salvage all small mammals, stranded lemurs, nocturnal birds and herpetofauna. Systematic<br />

salvage of these taxa was undertaken for all mine, pipeline and plant site clearings, under the supervision<br />

of external experts (e.g. biologists from the University of Antananarivo) and the <strong>Ambatovy</strong> biodiversity<br />

team. Taxa were logged and relocated / monitored in refuge areas. Limited salvaging of flora was also<br />

conducted. Some SOCs required ex situ conservation, with individuals translocated to a dedicated on-site<br />

area while searches for the SOC in areas outside the footprint were completed; cells from these SOC were<br />

collected for micro-propagation and cryoconservation as a back-up. To date all SOC surveys have lead to<br />

the identification of off-site VIABLE POPULATIONS, and the <strong>Project</strong> and its botanical partners remain confident<br />

that this will be the case for all remaining SOCs. In the event that SOC are not found, then the<br />

aforementioned mitigation will be applied.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 32<br />

Figure 3: Mine area, showing conservation zones (green) that constitute on-site offset area (including<br />

azonal, transitional and zonal forests)<br />

The mine restoration programme includes progressive footprint rehabilitation through erosion control,<br />

reforestation with targeted species and facilitated secondary successions. The aim is to produce a<br />

multifunctional replacement forest with biodiversity values that can be included in the offset calculation (by<br />

reducing the residual impact on biodiversity that will require offsetting). The pipeline restoration programme<br />

will focus on targeted reforestation of the right of way.<br />

7.3.4.4 Determining residual impacts<br />

The <strong>Project</strong>’s most significant residual impacts will occur at the mine site. Residual impacts caused by the<br />

other key <strong>Project</strong> components are limited as these components are located in areas that are already heavily<br />

and historically degraded. Nonetheless, these less significant residual impacts will also be included in the<br />

offset calculations.<br />

The <strong>Project</strong>’s residual impacts are summarised below.<br />

Direct negative impacts<br />

The total loss of habitats as progressive clearance of the mine footprint (1,336 hectares, excluding the<br />

environmental buffer) proceeds in an ecologically sensitive natural forest mosaic. Following clearance<br />

some areas will be built on and / or eventually mined. In the areas lost to DIRECT IMPACT the HABITAT TYPES<br />

were identified (azonal, transitional and zonal forests, ephemeral ponds and streams) and the quality of<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 33<br />

each determined (good or degraded). Flora, fauna and aquatic taxa assemblages were associated where<br />

feasible with these habitat types and quality. Finally, habitat surface areas were calculated using ESIA<br />

habitat maps and GIS. Taxa assemblages and forest structural characteristics were determined for each<br />

habitat where possible. Available fauna data were generally qualitative, although pre-clearance survey<br />

data from both the mine footprint and surrounding conservation areas were used, providing updated lemur<br />

densities and abundance.<br />

Clearance of 16.5 ha of fragmented and degraded primary forest during installation of the 218 km buried<br />

slurry pipeline (a total clearance permit for approximately 70.5 hectares was granted as 98% of the pipeline<br />

route passes through secondary, non-sensitive vegetation (e.g. non-native eucalyptus) resulting from<br />

historic slash and burn). Two sections of the pipeline do, however, cross sensitive habitats: the first 2 km<br />

passes through zonal, near-primary forest and the pipeline also crosses the Ankeniheny-Zahamena<br />

Corridor (CAZ). Losses associated with the pipeline’s first 2 km have been included in the mine losses<br />

using the same approach for determining residual impacts as applied to the mine footprint.<br />

Indirect negative impacts<br />

INDIRECT IMPACTS through edge effects (dust, noise, plant desiccation, invasion of natural heliophytes), will<br />

potentially affect 790 ha of forest surrounding the mine footprint. This area was defined on the basis of a 100<br />

m zone surrounding polygon features (e.g. mine pits and ancillary facilities) and a 50 m zone around linear<br />

features such as roads (except the main access road) and pipelines (see Appendix 4: Mine Footprint<br />

Definition, 2nd Approximation, December 12, 2007). The degree to which these areas will be affected<br />

remains unclear; as a precautionary approach the full 790 ha has been included in the total loss calculations.<br />

This may be modified as information on the degree of impact becomes available through monitoring.<br />

Low or negligible negative impacts for biodiversity<br />

The processing plant is being constructed on a 150 ha (1.5 km 2 ) area of the Toamasina industrial zone. The<br />

1,400 ha (14 km 2 ) tailings management facility will be located in a highly degraded fire-driven agricultural<br />

matrix. An existing pier at the harbour will be extended by over 300 m. The residual biodiversity impacts<br />

associated with the processing plant, tailings facility and pier extension are expected to be negligible. The<br />

habitat classes for the plant site and tailings facility location would be defined as highly impacted and<br />

degraded and have been omitted from the loss calculations for the time being. However, the <strong>Project</strong> will<br />

consider how to trade-up these areas by conserving higher priority biodiversity elsewhere; one suggestion is<br />

to simply add the surface areas lost (i.e., 15.5 km 2 ) and apply a MULTIPLIER to determine the area of higher<br />

BIODIVERSITY CONSERVATION priority land as part of the offset. The <strong>Project</strong> will seek assistance from the BBOP<br />

Advisory Committee before making a decision.<br />

Socioeconomic impacts<br />

The <strong>Project</strong> will conduct loss calculations for the socio-environmental aspects in 2009. The aim of the offset<br />

programme is to compensate for all AMENITY and LIVELIHOOD related losses experienced by local communities<br />

as a result of the biodiversity offset. Potential compensation measures include the introduction of improved<br />

agricultural techniques to increase crop yield and the provision of jobs related to environmental protection.<br />

At present, a number of positive socioeconomic impacts are also apparent:<br />

Over 80 members of the local community at the mine are permanently employed in biodiversity<br />

management-related jobs (in total, over 8,000 jobs for Malagasies will be generated by the <strong>Project</strong>); the<br />

biodiversity jobs include ongoing training.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 34<br />

14 community members have been hired as park rangers at the mine site to protect the mine forests.<br />

A public awareness programme is underway to raise community understanding of their natural heritage<br />

and their role in its protection.<br />

Reinforcement of the local forestry service’s capacity to protect forests (and their fauna and flora) around<br />

the mine footprint; the work at the Torotorofotsy wetland will also improve the forest service’s capacity<br />

there.<br />

Over 50 local expert biologists have been hired (on a project-by-project basis) to bring their knowledge to<br />

the <strong>Project</strong>’s activities and to promote the development and use of Malagasy skills).<br />

7.3.4.5 Offsetable nature of residual impacts<br />

The <strong>Project</strong> is ensuring that its residual impacts are OFFSETABLE by focusing on the avoidance of species,<br />

habitat and ecosystem loss and checking that the particular biodiversity components affected can be found in<br />

the surrounding area and beyond, so that their populations will not be unduly affected by the <strong>Project</strong> and will<br />

benefit viably from the offset activities. The <strong>Project</strong> has ensured that species of concern (SOC) were present<br />

outside of the mine footprint and is using taxa-specific management programs to define the relevant<br />

conservation management activities:<br />

The Flora Management Programme aims to ensure that SOC <strong>–</strong> flora species that were only identified on<br />

the mine footprint during the ESIA baseline <strong>–</strong> are not lost. These species remain listed as SOC until viable<br />

populations are located outside the mine’s footprint in protected areas. Surveys and viability assessments<br />

are being conducted by experts in flora taxonomy and ecology from Missouri Botanical Garden <strong>–</strong><br />

<strong>Madagascar</strong>.<br />

The Lemur Management Programme aims to confirm that the mine’s construction and operation activities<br />

are not leading to a long-term reduction in the viability of priority species’ populations present in the mine<br />

area. The programme focuses on IUCN EN and CR species, but includes all 16 species as a BEST<br />

PRACTICE measure due to the unique nature of lemurs. The programme includes two principal phases, a<br />

short-term three year assessment (covering the 2007 <strong>–</strong> 2010 construction phase) to begin identifying any<br />

trends in lemur groups and populations in the footprint and receiving areas located in the conservation<br />

forests. The second phase (from 2010 to end of the mine’s life), aims to identify any long-term viability<br />

trends and to develop appropriate mitigation measures, such as off-site relocation programs, recruitment<br />

boosting (e.g. captive breeding and release), reduction of slash and burn activities and strict control of<br />

hunting (bushmeat).<br />

The Mantella Management Programme aims to ensure that there are no measurable adverse impacts on<br />

the ability of the mine area forests to support the established Mantella aurantiaca (IUCN CR) and Mantella<br />

crocea populations (IUCN EN). Any reduction in their population sizes is also to be avoided. The<br />

programme was implemented in November 2007, although the species are located in areas that will not be<br />

mined for 10 years or more. The <strong>Project</strong> is defining populations present on the footprint and in the<br />

conservation zones and comparing them to regional population sizes. Various mitigation measures are<br />

possible including footprint reduction or shifting (i.e., modifying the footprint to avoid breeding areas),<br />

relocation (based on successful trials) and increasing population recruitment.<br />

The Fish Management Programme aims to avoid the extinction of fish species and to maintain population<br />

viability at pre-<strong>Project</strong> levels. Endemicity assessments have been conducted as the species present were<br />

only previously described to the genus level. Mitigation measures will be applied accordingly and may<br />

include, for example, the creation of conservation streams and relocation.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 35<br />

7.3.5 Step 5: Choose methods to calculate loss / gain and quantify residual losses<br />

The <strong>Project</strong> is using methodologies described in the BBOP Biodiversity Offset Design Handbook to assess the<br />

<strong>Project</strong>’s impact on biodiversity, to identify appropriate activities and sites for the biodiversity offset, and to<br />

determine the scale of the offset needed to achieve the CONSERVATION GAINS that will achieve NO NET LOSS.<br />

The methodologies combine consideration of biodiversity of equivalent or higher value and site selection to<br />

ensure that all key biodiversity components are represented at the offset and have two key features:<br />

‘benchmarks’ and ‘HABITAT HECTARES’:<br />

BBOP defines a ‘benchmark’ as reference point against which the losses of biodiversity due to the <strong>Project</strong><br />

and gains through the proposed offset can be quantified and compared consistently and transparently. A<br />

benchmark usually comprises a number of representative and characteristic ‘ATTRIBUTES’ used to represent<br />

the type, amount and quality of biodiversity which will be lost / gained. Comparison of the observed level<br />

(or ‘score’) of each BENCHMARK ATTRIBUTE at the impact site (before and as predicted after the impact)<br />

against the level at the benchmark can help to quantify the loss of biodiversity to be caused by the <strong>Project</strong>.<br />

Similarly, comparing the observed level (or ‘score’) of each benchmark attribute at the offset site (before<br />

the offset and as predicted after the offset intervention) against the level at the benchmark can help to<br />

quantify the gain in biodiversity caused by the offset. A benchmark can be based on an area of land that<br />

provides a representative example, in a good condition, of the type of biodiversity that will be affected by<br />

the proposed development project.<br />

‘Habitat hectares’ are units of measurement that take into account the area affected and the quality or<br />

CONDITION of the biodiversity impacted (determined by the quantities of a number of chosen attributes<br />

related to the structure, composition and function of that habitat). The habitat hectares METRIC was<br />

originally developed in Victoria, Australia to focus on HABITAT STRUCTURE, particularly native vegetation,<br />

and thus to provide proxies for composition and function. It has since been adapted by BBOP to cover both<br />

flora and fauna, and to include some aspects of composition and function as benchmark attributes. The<br />

habitat hectares approach is described in more detail in Section 7.3.5.1 below.<br />

The <strong>Project</strong>’s proposed benchmark meets specific predetermined criteria with respect to surface area, habitat<br />

quality and connectivity (see below). It is ideally located as it is in the mine area conservation zones, thus<br />

ensuring its long term protection. The long-term presence of the benchmark is important as it will enable<br />

background environmental degradation arising from external factors (such as climate change) to be quantified<br />

and subsequently addressed at the offset site.<br />

Lists of key biodiversity components were identified in the impact area; these include species and habitat<br />

types (structural). Complementary faunal data will be collected by the <strong>Project</strong> in 2009 to integrate more<br />

species attributes into the habitat hectares loss calculation, as current calculations are limited to quantitative<br />

information for only three priority lemur species.<br />

The <strong>Project</strong> has calculated its habitat hectares loss values for forest habitats. Scores for streams and<br />

ephemeral pools were calculated in April 2008, but have been temporarily excluded subject to re-assessment<br />

during the next iteration of the loss calculations.<br />

Two habitat hectares calculation scenarios were assessed in April 2008: without and with post-impact<br />

MITIGATION. It is important to note that both potentially relate to real situations since restoration performance<br />

is not well documented for <strong>Madagascar</strong> or the <strong>Ambatovy</strong> region. ‘Post-impact mitigation’ significantly<br />

decreases the habitat hectares loss value and will ultimately be included in the final (definitive) offset<br />

calculations. However, care is necessary to avoid overestimating the potential for rehabilitation success as<br />

this can result in the underestimation of the number of habitat hectares that the offset must deliver. Only the<br />

‘without post-impact mitigation’ scenario is reported here as further analysis (modelling) is required to<br />

accurately calculate losses based on the ‘with post-impact mitigation’ scenario.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 36<br />

7.3.5.1 The habitat hectares approach<br />

This section:<br />

Introduces the ‘HABITAT HECTARES’ approach;<br />

Describes how the ‘benchmark’ was defined for forest habitats; and<br />

Explains how the <strong>Project</strong>’s residual impacts on biodiversity have been calculated using the benchmark.<br />

The habitat hectares approach<br />

Biodiversity loss was calculated using the habitat hectares approach, summarised as:<br />

1. Completion of the Key Biodiversity Component Matrix (KBCM), which corresponds to conducting a<br />

biodiversity assessment of species, habitats and ecosystems components and determining intrinsic<br />

(significance and irreplaceability) and use (socioeconomic and cultural) values;<br />

2. Completion of a table to review the application of the MITIGATION HIERARCHY to the key biodiversity<br />

components;<br />

3. Selecting attributes for the key biodiversity components using available or complementary data and<br />

assigning ‘weights’ to each. For example:<br />

<strong>Forest</strong> structural attributes can be selected and compared (weighed) against each other, e.g. tree<br />

species richness is considered to be the most important attribute at <strong>Ambatovy</strong> and therefore has a<br />

higher WEIGHTING than attributes related to forest physical structure.<br />

Taxa attributes such as quantitative fauna data (e.g. density) from priority species can also be<br />

integrated and therefore allow key fauna data into the weighing of attributes; this reflects more<br />

accurately the importance of species biodiversity in the habitat hectares scores.<br />

4. Defining and selecting a BENCHMARK for selected habitats;<br />

5. Calculating biodiversity loss at the IMPACT SITES by comparison to the benchmark, for each habitat<br />

CONDITION classes in light of impact levels;<br />

6. Completion of a table to record and compare whether POTENTIAL OFFSET SITES could deliver conservation<br />

gains for key biodiversity components; and<br />

7. Calculating the habitat hectares gained at the offset site.<br />

Using the previously cited information, habitat hectare scores were determined for all habitats (e.g., forests,<br />

streams and ephemeral ponds). Calculation of the forest habitat hectare loss at <strong>Ambatovy</strong> requires the<br />

following condition information:<br />

Habitat types, namely azonal, transitional and zonal forests and respective surface areas (see Figure 4<br />

showing the mine area habitat map);<br />

Habitat condition class and respective surface areas (see Figure 4), namely:<br />

<strong>–</strong> Quasi pristine primary forest (see definition in benchmark section hereafter, <strong>Forest</strong> habitats, 3rd and 4th<br />

bullets);<br />

<strong>–</strong> Disturbed / degraded primary forest; and<br />

<strong>–</strong> Heavily fragmented and degraded primary forest.<br />

Impact types, namely high (cleared footprint) and medium (environmental buffer) and respective surface<br />

areas (see Figure 5).<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 37<br />

Figure 4: Mine area habitat map<br />

Figure 5: Mine footprint and environmental buffer map<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 38<br />

The <strong>Ambatovy</strong> forest habitat loss scores were determined by merging data from the three existing habitat<br />

types, since the selected forest attributes did not exhibit a statistical difference and faunal movement from<br />

intensive fauna surveys in the pre-clearing perimeters showed the same occupancy pattern for the three<br />

habitat types. Knowledge of the condition class is particularly important, since it reflects the biodiversity loss at<br />

stake, thus highlighting the application of multipliers in degraded habitats that are subsequently subject to<br />

negative impacts. The importance of multipliers was highlighted, for example, when considering degraded<br />

azonal forests which constitute 44.6% of the azonal habitat loss, but equivalent to only 29.3 habitat hectares<br />

of the total 620 habitat hectares score for the azonal habitat. High impact areas corresponded to 100% forest<br />

clearance with earthworks, medium impacts corresponded to the potential edge effects on the forest<br />

environmental buffer (50 m for linear features and 100 m for polygons), while low impacts did not apply to the<br />

impact areas. The habitat hectares score provided above is for the ‘without post-impact’ mitigation scenario.<br />

The habitat hectare gain for the proposed offset site has not yet been calculated, as detailed forest structure and<br />

quantitative species attribute data are still being acquired, with field surveys for flora / forest structure and aquatics<br />

planned in July 2009 and terrestrial fauna in November 2009. As the proposed Ankerana site is considered to be<br />

an ‘IN-KIND’ offset (relative to the impact site), the same benchmark will be used to calculate gains.<br />

Benchmark<br />

Based on the BBOP definition of a benchmark, the following criteria were used to define and identify a<br />

candidate site:<br />

<strong>Forest</strong> habitats:<br />

<strong>–</strong> Minimal critical size: in the <strong>Ambatovy</strong> forests, a benchmark is required that captures the progressive<br />

structural changes between the existing three vegetation types, and the faunal movement between<br />

them throughout the seasons. A contiguous area of quasi pristine ‘azonal’, ‘transitional’ and ‘zonal’<br />

forests, each of which must be a minimum of 40 ha is proposed. This area of 120 ha includes the core<br />

area of original habitat with a 100 m wide buffer around it and appears to be the minimum required as a<br />

home range for lemurs and to represent an adequate assemblage of vegetation.<br />

<strong>–</strong> CONNECTIVITY: the contiguous forest area (minimum size <strong>–</strong> 120 ha) must be connected to other forest<br />

habitats.<br />

<strong>–</strong> Human disturbance: there must be no sign that the site has ever been cleared by humans (in both core<br />

and buffer areas). However other evidence including tree stumps, historical records, soil charcoal,<br />

archaeological remains and signs of selective logging (defined as less than 12.5% of crown cover loss)<br />

over the last 20 years do not exclude a site from consideration as a benchmark (such evidence is<br />

widespread and unavoidable in the region). Any small degraded areas within the larger benchmark area<br />

are mapped and excluded from the benchmark calculations (and surface area).<br />

<strong>–</strong> Natural disturbances: a site that has experienced a natural fire in the last 20 years, at a level of 10% of<br />

its surface area (in both its core and buffer area) is excluded. Also, no evidence of cyclonic events is<br />

acceptable (above 10% loss of canopy crown cover in the last 20 years).<br />

Streams and ephemeral pools:<br />

<strong>–</strong> The benchmark must be the mostly pristine habitat.<br />

<strong>–</strong> The stream locations where benchmark data were acquired must be surrounded by quasi-pristine<br />

and natural habitat, unaffected by any major human-induced disturbance and under pristine forest<br />

cover.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 39<br />

<strong>–</strong> Since many natural ephemeral pools occur in hollow rocky ground, benchmark data must be taken<br />

where the rock outcrops are of natural origin and not the result of forest clearance or other human<br />

disturbance.<br />

Assumptions:<br />

<strong>–</strong> Within the azonal and transitional habitats, the highest ENDEMISM is associated with the lowest human<br />

impact.<br />

<strong>–</strong> No sylviculture or tree enrichment has been carried out in <strong>Ambatovy</strong>.<br />

The benchmark site is presented in Figure 6.<br />

Quantifying biodiversity residual impacts calculations using the benchmark<br />

Benchmark<br />

A scoping exercise was undertaken to determine from the KBCM and other studies which biodiversity<br />

components would be most appropriate as attributes of the benchmark. The data quality associated with<br />

each of these components available in the ESIA was checked. The selected attribute types are:<br />

Species:<br />

<strong>–</strong> 3 lemurs: Propithecus d. diadema, Indri indri, Allocebus trichotis (the attributes of species such as<br />

Prolemur simus and Daubentonia madagascariensis will be re-examined in the next iteration of the<br />

offset calculations); and<br />

<strong>–</strong> 2 fish: Ratsirakia sp and Rheocles sp (suspended for the moment and to be re-examined in the next<br />

iteration).<br />

Communities / habitats:<br />

<strong>–</strong> <strong>Forest</strong> (three habitats, azonal, transitional and zonal);<br />

<strong>–</strong> Streams (suspended for the moment and to be re-examined in the next iteration); and<br />

<strong>–</strong> Ephemeral pools (suspended for the moment and to be re-examined in the next iteration).<br />

Impact assessment and mitigation hierarchy application:<br />

An impact assessment of the biodiversity components was subsequently conducted based on the anticipated<br />

impacts, of which the principal impact is forest clearance and subsequent habitat loss. The corresponding<br />

mitigation strategies for each biodiversity component are presented below:<br />

Species: lemurs are displaced from their habitats by forest clearance. The <strong>Project</strong>’s mitigation measure is<br />

to monitor (through radio collars and telemetry) their ability to migrate from the clearance area towards the<br />

refuge areas (see Figure 3, conservation zones). The mitigation measures include assisting stranded<br />

individuals from all 16 known species identified on-site and limited off-site relocation to protected areas<br />

(e.g. Propithecus diadema) following IUCN translocation guidelines.<br />

Habitats: the main mitigation strategy for the three forest habitats is offsetting due to their fixed location.<br />

AVOIDANCE will also be applied to the azonal habitat since 26.4% of this habitat will be protected in the<br />

form of the mine area conservation zones (see Figure 4).<br />

The December 2008 iteration of the impact assessment and mitigation strategies is presented in Appendix 1.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 40<br />

Benchmark and attributes<br />

A benchmark site was selected (see Figure 6) in line with the BBOP definition and <strong>Project</strong>-specific criteria<br />

noted above. The benchmark includes a forest tract of 1,149.15 ha, composed of quasi pristine azonal,<br />

transitional and zonal forests, at least two streams and several ephemeral ponds.<br />

Figure 6: BBOP benchmark site map<br />

A limited number of ATTRIBUTES were selected as SURROGATES for both forest habitat structure and function<br />

based on the following characteristics:<br />

Sensitive INDICATORS to habitat quality;<br />

Simple and practical to measure and quantify;<br />

Reliable and repeatable in assessments; and<br />

Reflect outstanding biodiversity values (e.g. species of conservation concern, or CULTURAL VALUE).<br />

Due to data limitations (e.g., difficulties faced in obtaining quantitative data for fauna at the impact site), the<br />

present loss calculations are limited to forest structural attributes (streams, number of tree species, canopy<br />

height, basal area and Diameter to Breast Height, Dbh) and the attributes of selected fauna species (lemur<br />

density). Future iterations will include additional attributes as appropriate data become available.<br />

The December 2008 iteration results are presented in Table 3, with WEIGHTING assigned to forest habitat and<br />

species attributes according to their relative importance for biological diversity.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 41<br />

Table 3: Summary of attribute weighting (December 2008)<br />

Attributes Unit Weighting (%) Justification<br />

Stems (a)<br />

Number of tree<br />

species (per ha)<br />

number / ha 15<br />

number / ha 20<br />

Canopy height m 5<br />

Basal area (b)<br />

m 2 / ha 5<br />

Dbh m 5<br />

Propithecus<br />

diadema density (c)<br />

Allocebus density<br />

Indri indri density<br />

individual<br />

number / ha<br />

Individual<br />

number / ha<br />

Individual<br />

number / ha<br />

20<br />

10<br />

20<br />

Total 100<br />

(a) Number of trees with diameter ≥10 cm, with measurements taken at 1.3 m above the ground.<br />

(b) Basal area is calculated as π x (diameter at breast height / 2) 2 .<br />

Reflects forest density, an important ecological attribute<br />

for fauna, especially lemurs.<br />

Provides overall floral diversity and habitat<br />

heterogeneity. Higher numbers are better.<br />

Indicator of forest maturity and canopy continuity. For<br />

azonal habitat lower canopy height is better.<br />

Indicator of habitat CONDITION. Higher value is better as<br />

it is an indication of mature forest.<br />

Indicator of habitat condition. Higher value is better as it<br />

is an indication of mature forest.<br />

IUCN CR (d) status, species very sensitive to human<br />

activities in their habitat.<br />

Nocturnal species sparsely distributed and appears to<br />

be sensitive to forest structure.<br />

<strong>Madagascar</strong>’s largest lemur species sparsely confined<br />

to eastern rain forest, IUCN EN status, and also has a<br />

cultural value (the most taboo lemur species).<br />

(c) Lemur species density is estimated based on line transect samples within a surface area, S = 2 x (Width x Length) in which density D<br />

= individual number / S.<br />

(d)<br />

Was recently lowered to EN.<br />

The selection and weighting of the attributes is examined below.<br />

Selected attributes are divided in two groups:<br />

<strong>–</strong> <strong>Forest</strong> structure, as a general surrogate for forest dependent biodiversity; and<br />

<strong>–</strong> Lemur species, as an ‘umbrella species’ fauna group considered to be the most sensitive to human<br />

disturbance in <strong>Ambatovy</strong> (bush meat, slash and burn, logging); the species selected include both<br />

diurnal and nocturnal species.<br />

Weighting: 60% and 40% importance were chosen for forest structure and faunal assemblage species,<br />

respectively. Attributes that express biological diversity (e.g., tree SPECIES DIVERSITY and stem number) are<br />

weighted with higher importance, as are species with CR rather than EN status. Since the mine is located<br />

in a BIODIVERSITY HOTSPOT area, IUCN species of concern have been chosen as the main attributes to<br />

reflect the principles of ‘IRREPLACEABILITY’ and no loss of NON-OFFSETABLE components.<br />

TAXA selection: lemurs were selected over other fauna groups, due to their wide presence in forest<br />

habitats. Fish, amphibians and reptiles are restricted to specific habitats at <strong>Ambatovy</strong>, for example<br />

microhabitats for herpetofauna. Therefore any impact occurring away from these specific microhabitats<br />

(which are yet to be defined) might not reflect the <strong>Project</strong>’s impact on these taxa. The possibility of<br />

considering some of the herpetofauna and pond invertebrate species will be explored after new data has<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 42<br />

been collected in 2009. The inclusion of fish components for stream habitats will also require further<br />

analysis and consideration.<br />

VULNERABILITY: although this attribute was integrated in the April 2008 calculations (see Appendix 5), it is<br />

excluded from the present iteration of the loss calculations. The taxa groups should be considered<br />

together, not only at the species level, so that the same weight can be given to all taxa (lemurs, birds,<br />

herpetofauna, etc). This would allow the <strong>Project</strong> to consider not only specific species, but also the<br />

taxonomic groups that are important for monitoring purposes. In fact species EXTIRPATION can sometimes<br />

be linked to group effects or intra-species interactions; therefore, it is best to consider taxa group<br />

vulnerability rather than that of specific species. It is thus assumed that vulnerability considered as an<br />

attribute makes more ecological sense than that considering specific species alone. However, the use of<br />

vulnerability attributes requires further detailed analysis, to be conducted in 2009.<br />

Calculating biodiversity loss at the impact site<br />

The attributes presented above are for the mine and pipeline components.<br />

As described in the previous sections, the pipeline’s impact on forest habitat is very limited since routing<br />

avoided relic forest fragments present in the first 32 km (after which the area crossed is entirely exotic<br />

secondary vegetation resulting from slash and burn activities). Only the first 2 km of the pipeline cross quasi<br />

primary forest, and these losses were included in the mine loss calculations. The pipeline’s losses thus<br />

correspond to the forest fragments (16.5 ha) that could not be avoided: the habitat hectares could be<br />

calculated for this as the area impacted could be compared to the zonal forest BENCHMARK ATTRIBUTES. The<br />

pipeline’s forest fragments are classed as Ecological Vegetation Class (EVC) 3: ‘heavily fragmented and<br />

degraded primary forest’. Instead of using the ‘basal area’ attribute, ‘volume’ was considered since these<br />

forests are heavily exploited by the local communities for fire wood. Volume can also be used in the future<br />

socioeconomic compensation analyses. The pipeline’s aquatic components include the crossing of more than<br />

400 streams with variable levels of ecological integrity and sensitivity. However, pipeline-related impacts to<br />

the aquatic environment are considered temporary, which cannot be captured by the habitat hectare<br />

methodology. The <strong>Project</strong> will therefore use methodological options for integrating temporary impacts in the<br />

next iteration of the loss calculations.<br />

The locations of the processing plant and tailing management facility have an EVC of 4 (essentially heavily<br />

degraded, with no remaining integrity, based on ESIA data). The habitat hectares calculation for this fourth<br />

category has not yet been undertaken for these areas. However the <strong>Project</strong> is committed to ‘TRADING UP’<br />

these areas and will work with BBOP to define an appropriate methodology for doing so. The harbour has<br />

been used as an industrial port for some time and little biodiversity of any significant conservation value is<br />

found there now.<br />

The mine area includes two Ecosystem Vegetation Classes (EVC): ‘quasi pristine primary forest’ and<br />

‘disturbed primary forest’. The pipeline has only one EVC: ‘heavily fragmented and degraded primary forest’.<br />

For each EVC the <strong>Project</strong> will have either a:<br />

‘High impact’ corresponding to total forest clearance with or without grubbing (removal of stumps, roots,<br />

and vegetable matter). A total area of 1,336 ha will fall in this impact category.<br />

‘Medium impact’ corresponding to the environmental buffer around the mine footprint (100 m) and linear<br />

features (pipeline / roads, with a 50 m buffer), which will be indirectly affected by forest clearance (impacts<br />

are mainly through edge effects such as light, dust and unauthorised disturbances.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 43<br />

Results of the HABITAT HECTARES scores for each HABITAT TYPE at the mine and along the pipeline are<br />

presented in Tables 4 to 7.<br />

Table 4: Azonal habitat (December 2008)<br />

AZONAL FOREST<br />

… of Condition<br />

Class 1:<br />

Quasi pristine<br />

primary forest<br />

…of Condition<br />

Class 2:<br />

Disturbed primary<br />

forest<br />

Total areas 590.74 475.55<br />

High impact 528.86 427.22<br />

Medium impact 61.88 48.33<br />

Table 5: Transitional habitat (December 2008)<br />

TRANSITIONAL<br />

FOREST<br />

… of Condition<br />

Class 1:<br />

Quasi pristine<br />

primary forest<br />

…of Condition<br />

Class 2:<br />

Disturbed primary<br />

forest<br />

Total areas 126.37 328.22<br />

High impact 53.38 222.68<br />

Medium impact 72.99 105.54<br />

Table 6: Zonal habitat (December 2008)<br />

ZONAL FOREST<br />

… of Condition<br />

Class 1:<br />

Quasi pristine<br />

primary forest<br />

…of Condition<br />

Class 2:<br />

Disturbed primary<br />

forest<br />

Total areas 412.74 124.97<br />

High impact 256.9 14.94<br />

Medium impact 155.84 110.03<br />

Table 7: Pipeline zonal habitat (December 2008)<br />

PIPELINE<br />

…of Condition Class 3:<br />

Heavily fragmented and degraded<br />

primary forest<br />

Total area 71.04<br />

High impact 16.5<br />

Medium impact 4.95<br />

TOTAL HABITAT<br />

HECTARE LOSS<br />

620<br />

TOTAL HABITAT<br />

HECTARE LOSS<br />

239<br />

TOTAL HABITAT<br />

HECTARE LOSS<br />

305<br />

TOTAL HABITAT<br />

HECTARE LOSS<br />

The forest habitat percentage hectares loss for the mine (and pipeline) components is shown in Figure 7.<br />

4<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 44<br />

Figure 7: <strong>Forest</strong> habitat percentage hectares loss for the mine component<br />

(the pipeline affects only a small portion of the zonal habitat)<br />

Zonal<br />

26.13%<br />

Transitional<br />

20.46%<br />

Pipeline<br />

(Zonal ) 0.33%<br />

Based on the current iteration, calculations show that:<br />

The project will generate a total loss of 1,168 habitat hectares that any offset will be required to<br />

compensate.<br />

In the mine area, the azonal forest habitat hectares score is the highest, with a total loss of 620 habitat<br />

hectares, representing over half of the entire forest habitat lost.<br />

The pipeline terrestrial biodiversity losses are minimal at 3.83 habitat hectares (0.33% of the total loss).<br />

The <strong>Project</strong>’s offset programme must focus its offset efforts on the azonal forest and associated<br />

biodiversity components, whilst ensuring that the other two habitats (transitional and zonal) habitat<br />

hectares losses are also compensated. Early analysis of trends in lemur species distribution (based on<br />

ESIA and construction mitigation management data) indicates that none of the three habitats has distinctly<br />

higher species richness. Instead it appears that the combination of the three habitats underpins high lemur<br />

species richness at <strong>Ambatovy</strong>. The azonal and other forest habitats that will be cleared during mine<br />

construction are not required for the survival of critically endangered or endangered species, since each<br />

lemur species found at <strong>Ambatovy</strong> is also present outside the mine area. However, the azonal forest<br />

habitats, including the forest assemblage composed of the azonal, transitional and zonal habitats, appear<br />

to favour the presence of lemur species biodiversity, with 16 species identified in the mine area compared<br />

with 6 to 10 species (depending on location) in the forest corridor (Schmid and Alonso 2005)<br />

Post-impact mitigation<br />

Azonal<br />

53.08%<br />

By excluding post-impact MITIGATION, the results remain conservative. When rehabilitation (as a mitigation<br />

measure) is considered, the habitat hectares losses are decreased by 50% within a 30 year period and there<br />

is a trend in the decrease of the habitat hectares loss using this mitigation strategy. It is important to note that<br />

the absence of a temporal parameter that integrates post-impact mitigation in the habitat hectares calculation<br />

may mask a project’s success over time in reducing habitat hectares loss.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 45<br />

Table 8: Biodiversity loss calculations scenarios at impact site and effect of post-impact remediation<br />

Habitat Habitat hectares loss<br />

Percentage of attributes<br />

rehabilitated<br />

1800<br />

1600<br />

1400<br />

1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

Year<br />

0 5 20 40 75 90<br />

Post-project mitigation level (%)<br />

Habitat type <strong>–</strong> forest<br />

HABITAT HECTARES loss<br />

0% 0 (without mitigation) 1,168<br />

5% 0 <strong>–</strong> 7 1,110<br />

20% 7 <strong>–</strong> 15 934<br />

40% 15 <strong>–</strong> 30 701<br />

75% 30 <strong>–</strong> 60 292<br />

90% 60 <strong>–</strong> 120 117<br />

For the forest habitat, the results show a significant difference for the varying levels of post-impact mitigation.<br />

However, in order to obtain a more realistic assessment of the post-impact condition, the <strong>Project</strong> considered<br />

the influence of forest rehabilitation on the habitat hectares loss numbers over time. Although the temporal<br />

factor is not considered in the habitat hectares loss calculations, a basic simulation was designed that<br />

integrated basic forest regeneration activities and specific ecosystem dynamics in the context of the <strong>Ambatovy</strong><br />

forests. There are four essential steps in forest regeneration:<br />

1. Erosion control (involves engineering, addition of organic matter and water control).<br />

2. Planting of heliophytes species (including native and potentially some non-natives).<br />

3. Planting of native tolerant species to increase ground cover.<br />

4. Assisted natural succession of native species.<br />

The inclusion of post-impact rehabilitation based on these activities shows a distinct decrease in the habitat<br />

hectares loss score over time, due to forest regrowth patterns and increases in the values of attributes<br />

(Pearson correlation R2 = -0.98 p< 0.001, n = 6; see Graph 1).<br />

Graph 1: Post-impact mitigation influence on biodiversity loss for forest habitats at IMPACT SITE<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 46<br />

It is important to note reforestation of the azonal forest area will create zonal type forest, with some azonal<br />

influences arising from the use of backfill originating in the azonal areas (which has specific geochemistry and<br />

broken ferricrete crust and pisolitic iron). Complete restoration to azonal habitat is deemed impossible due to<br />

its strong links with the removed ground structure and geochemistry.<br />

To improve the basic simulation discussed above, the <strong>Project</strong> will collect available rehabilitation data for<br />

Madagascan lateritic soils and the eastern domain. This will enable the refinement of reforestation predictions.<br />

Based on Madagascan forestry experience, it is estimated that at 30 years forests will begin to offer a habitat<br />

that can be exploited by lemurs and other important taxa, for both food and shelter. The closure biodiversity<br />

programme will include monitoring of priority taxa in these rehabilitated areas to define the rate of<br />

recolonisation. Irrespective of improvements in the model, continuing care in integration of rehabilitation data<br />

in the loss calculations will be necessary due to:<br />

1. Limitations in the availability of specific information on Malagasy forests rehabilitation success rates;<br />

2. The specificity of the <strong>Ambatovy</strong> mine site forests and overall associated uncertainties; and<br />

3. The risk that lower success rates may occur despite improved confidence in predictions.<br />

Consequently, the <strong>Project</strong> may decide to take a more precautionary approach and retain conservative habitat<br />

hectares scores to ensure that NO NET LOSS is not undermined by an undersized offset design.<br />

7.3.6 Step 6: Review potential offset locations and activities and assess the<br />

biodiversity gains which could be achieved at each<br />

Identifying offset options<br />

Preliminary surveys of offset candidate sites were undertaken in 2005 (see Appendix 6, Survey for Off-site<br />

Azonal Outcrops (in French)) with the objective of identifying potential in-kind type offsets. The surveys were<br />

based on geological, substrate, altitude and forest structure similarities (see Figure 9, showing correlation<br />

between the EVC (azonal, transitional and zonal), substrate and topography) and comprised:<br />

A desk study using geological maps to identify ultramafic outcrops and satellite imagery for remaining<br />

forest cover.<br />

Aerial (plan) reconnaissance survey to confirm the presence of forest cover and rapid visual integrity<br />

assessment; the survey had to be conducted by air, due to the absence of road infrastructure and general<br />

remoteness of the areas. Two potential candidate sites (of 14 initially identified <strong>–</strong> see Figure 8) were<br />

chosen based on forest integrity and surface area.<br />

Aerial (helicopter) reconnaissance survey and walk over ground survey of potential candidate sites<br />

(Vohimenakely and Ankerana). Vohimenakely, located northwest of Zahamena National Park appeared to<br />

have azonal characteristics but was very small (500 ha) and with no signs<br />

of disturbance (see Photograph 1).<br />

A ground-level vegetation survey at selected candidate site (Ankerana) to determine if it has similar habitat<br />

and floristic (see Photograph 2) characteristics as at <strong>Ambatovy</strong> and Analamay. The preliminary comparison<br />

of the Ankerana area with <strong>Ambatovy</strong> / Analamay is presented in Appendix 7. Ankerana had previously and<br />

independently been identified by the Missouri Botanical Garden <strong>–</strong> <strong>Madagascar</strong> (a <strong>Project</strong> partner) as a<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 47<br />

potential conservation area based on its floral assemblages. Overall, many similarities were noted in the<br />

physical, climatic and biological characteristics compared to <strong>Ambatovy</strong> / Analamay, supporting the<br />

hypothesis that Ankerana can be considered ‘IN-KIND’ relative to the <strong>Ambatovy</strong> azonal habitats. Additional<br />

work to verify these similarities is required and planned for 2009.<br />

Figure 8: Ankerana offsite offset area location and other candidate sites surveyed by the <strong>Project</strong>, in<br />

relation to the <strong>Ambatovy</strong> mine area<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 48<br />

Figure 9: Correlation between EVC (azonal, transitional and zonal), substrate and topography<br />

Photograph 1: Ankerana aerial view<br />

Photograph 2: Ankerana azonal habitat<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 49<br />

Quantifying gains of offset options<br />

The detailed quantification of potential offset GAINS has not yet been conducted. Rough estimates of gains<br />

have been prepared based on mapping data and the surface areas that would be protected:<br />

1. Ankerana offset site (see Figure 10): the Ankerana offset has a total surface area of approximately 11,600<br />

ha, consisting of a 4,600 ha core conservation area and a 7,000 ha multiple use buffer area surrounding<br />

the core. The site lies within the area planned for inclusion in the Malagasy protected area system (SAPM).<br />

Consequently, the <strong>Project</strong> funding is being designed to ensure that any biodiversity offset offers<br />

conservation ADDITIONALITY. The field surveys to characterise species, habitats and ecosystems at the<br />

proposed offset site will be conducted in 2009, allowing calculation of the habitat hectares gains. Based on<br />

the preliminary survey conducted during the ESIA, the <strong>Project</strong> is confident that the KEY BIODIVERSITY<br />

COMPONENTS identified at <strong>Ambatovy</strong> (species, habitats and ecosystem) can be found at Ankerana,<br />

although <strong>Ambatovy</strong> species assemblages may not all be present at Ankerana. It is important to note that<br />

this issue justifies the conservation of the two on-site azonal forest tracts (the mine area conservation<br />

zones). The forest will form part of the on-site offset component. The on-site offset includes all forest<br />

habitats present on the mine footprint, including two azonal forest areas (one being the <strong>Project</strong>’s<br />

BENCHMARK site). Therefore it is acceptable to assume that all key biodiversity components are present in<br />

the on-site offset.<br />

2. On-site azonal habitat conservation sites (see Figure 4): the azonal forest surface area equals 212.33 ha<br />

(26.4% of the total prime quality habitat; the azonal habitat remaining outside the mine footprint is all<br />

pristine).<br />

3. Management of mine area forests (see Figure 3): the <strong>Ambatovy</strong> offset programme includes the 4,900 ha<br />

conservation zones forest around the mine footprint; the azonal conservation zones noted above are<br />

located within this area. The <strong>Project</strong> aims to reinforce the legally protected status of these forests to ensure<br />

their continued protection following mine closure. Their current protection is ensured by the mine <strong>Forest</strong><br />

Management Plan, since most of the forest areas are within the mine lease where the <strong>Project</strong> has<br />

exclusive management rights. The <strong>Project</strong> is also currently discussing with Conservation International the<br />

regional integration of its on-site offset.<br />

4. Mine area / Ankeniheny-Zahamena Corridor link (see Figure 11): the forest corridor between the mine area<br />

conservation zones forest and the rest of the eastern rain forest corridor is a key component in ensuring<br />

CONNECTIVITY between these two areas. The corridor concept has been integral to the <strong>Project</strong>’s species<br />

management strategies (particularly for lemurs). The exact boundaries have not yet been defined, but are<br />

likely to enclose about 2,500 ha. The <strong>Project</strong> is also currently discussing with CI the regional integration<br />

and protection of this forest corridor to ensure its connection with the relic Ankeniheny-Zahamena Corridor<br />

and the SAPM protected areas (e.g. Mantadia National Park).<br />

5. Torotorofotsy Ramsar site management (see Figure 11): the total surface area of this site’s watershed is<br />

8,500 ha of which 1,100 ha is wetland. However, results of recent surveys led by <strong>Ambatovy</strong> indicate that<br />

the ecological integrity of the overall area has been several degraded, resulting in reduced gains for<br />

biodiversity. The true gains will be quantified based on analysis of the survey results.<br />

6. FOREST CONNECTIVITY CAZ (see Figure 11): the total area of zonal forest lost to the pipeline right of way will<br />

be reforested (so a gain of 16.5 ha, the first 2 km reforested route being integrated with the mine). The<br />

exact surface area to reforest for the CAZ connection has yet to be determined, but may be around 200 ha.<br />

7. Footprint rehabilitation: the total surface area of the mine footprint will be rehabilitated, of which a majority<br />

will be reforested (approximately 1,336 ha).<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 50<br />

Figure 10: Ankerana map<br />

Figure 11: Mine area and Analamay-Mantadia forest corridor, allowing link between on-site offset and<br />

forest corridor<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 51<br />

Comparative analysis of offset options<br />

A comparative analysis of offset options was conducted during the site selection process (as noted above).<br />

Results are presented in Appendix 6 (in French).<br />

7.3.7 Step 7: Calculate offset gains and select appropriate offset locations and<br />

activities<br />

Finalising offset sites and activities<br />

The habitat hectares gain score for the offset sites has yet to be calculated, as detailed forest structure and<br />

species attribute quantitative data need to be obtained for the Ankerana and other offset sites. This will take<br />

place as soon as the stakeholder consultation process is completed. As the Ankerana site is considered ‘inkind’<br />

with the <strong>Ambatovy</strong> azonal habitats, the same benchmark will be used to calculate gains. A detailed<br />

BASELINE STUDY of the Ankerana offset will be conducted in 2009 to check the offset site for the presence and<br />

suitability for all the key biodiversity components identified at the impact site and to support the gain score<br />

calculations.<br />

The plan for the Ankerana offset will include a core conservation area, surrounded by a multiple use area to<br />

ensure social integration of the offset and thus its sustainability in the context of local community support.<br />

The principle of pursuing an offset was established in 2004. However, the offset was not fully established<br />

before the <strong>Project</strong>’s impacts began occurring in May 2007 (the date that mine forest clearance began). The<br />

<strong>Project</strong> must thus still determine whether the temporal loss is critical or not (i.e. that any biodiversity<br />

component cannot be offset because of impacts in the period before the offset is created). However, the<br />

<strong>Project</strong> is confident that this is not the case for any of the taxa present; especially for very sensitive species<br />

such as Mantella aurantiaca and Mantella crocea (whose habitats will not be disturbed for at least 10 years,<br />

when Analamay will be cleared for mining). With respect to lemurs, a short-term and long-term trend<br />

assessment programme (Lemur Viability Assessment Programme) is underway for all priority species (IUCN<br />

CR and EN species). However, even though the temporal loss will not compromise the success of the offset,<br />

the offset design does plan to take it into account. Conventionally, this could be done through application of a<br />

MULTIPLIER and TIME DISCOUNTING (the concept that 1 habitat hectare delivered accruing in 10 years time has<br />

only a fraction of that value at the present time). The <strong>Project</strong> will explore and define a methodology and apply<br />

it to the next iteration of loss and gain calculations in 2009, taking into consideration that the main impacts will<br />

be spread over a period of approximately 20 years, while the offset could be in place much earlier.<br />

7.3.8 Step 8: Record the offset design and enter the offset implementation process<br />

The Ankerana offset design and other components of the offset have not yet been finalised, thus the<br />

implementation process has not formally begun. The <strong>Project</strong> will finalise the offset design, using BBOP<br />

guidance, during the course of 2009. A summary of the management plan will be presented in subsequent<br />

case study revisions. However, a brief description of the progress made to date is presented below:<br />

Stakeholder consultations: the <strong>Project</strong> has pursued stakeholder consultations, ensuring through a<br />

participatory process that the offset can be integrated into national, regional and local plans and that<br />

feedback is taken into account in the offset design and the development of multiple use zones.<br />

Legal protection: the Ankerana forest was under temporary protection status until the end of 2008. The<br />

<strong>Project</strong> requested that this protection status be prorogated (continued) until the final Ministerial Protection<br />

Decree is finalised and made law (planned for July 2009).<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


The Offset Design Process 52<br />

Boundary definition: delimitation of the Ankerana offset boundaries (see Figure 10). The mapping has been<br />

presented to the local communities, regional authorities and partner NGOs. Several awareness campaigns<br />

have enabled presentation of this information to remote habitations around the proposed offset site. The<br />

campaigns will be repeated twice per year at key periods i.e. before and during the traditional clearing<br />

period (with police enforcement against passing the boundary). Results if the campaigns to date indicate<br />

that Ankerana has been extremely isolated for a long time and people had no idea of forest laws restricting<br />

forest clearance.<br />

Zoning: the current land uses have been described and will be integrated with the offset design in 2009.<br />

Reforestation activities: continuation of reforestation on the periphery of the proposed offset; this has<br />

focused mainly on planting construction wood to avoid primary forest logging in the core offset area.<br />

Support (financial and logistic) for updating of the Marserana commune’s five year Communal<br />

Development Plan. This commune covers the offset area. Discussions with a second commune,<br />

Andahamana have begun; this commune includes a small fraction of the offset area and will also be<br />

assisted with updating of its five year plan.<br />

Integration of Ankerana with the SAPM: a technical committee meeting with SAPM was used to discuss<br />

the integration of the offset site into the national protected areas network.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


8. Implementation Plan and<br />

Long-term Management<br />

The team plans to complete the design of the offset implementation plan by the end of 2009, with the<br />

Ankerana and other offset sites’ gain calculated in early 2010 and thus the final offset design completed at<br />

that point. The Ministerial Protection Decree should be ready by June 2009, thus allowing the <strong>Project</strong> to<br />

legally implement the management of the core and multiple use buffer area of the Ankerana part of the offset.<br />

While the ESIA stated the <strong>Project</strong>’s commitment to establish a biodiversity offset at Ankerana, no timing<br />

commitment was made. The offset establishment is therefore assumed to be in line with the <strong>Project</strong>’s<br />

temporal goals. The <strong>Project</strong> is establishing the offset to last the <strong>Project</strong>’s lifetime of 30 years and beyond. The<br />

establishment of a Ministerial Protection Decree is underway and the financing mechanisms are being<br />

discussed. Actions and timings are summarised in Figure 12.<br />

Figure 12: Actions and timings (2004-onwards)<br />

The <strong>Project</strong> will have the responsibility of ensuring the management of the Ankerana site. Actual site<br />

protection and local management will likely be entrusted to an NGO. The exact mode of financing has not yet<br />

been defined precisely. An in depth financial assessment will be conducted to determine the most viable<br />

means of ensuring long term financial revenue to support site protection.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

53


9. Summary of Offset Process Costs<br />

The <strong>Ambatovy</strong> <strong>Project</strong> BBOP programme component is part of the <strong>Project</strong>’s Biodiversity Programme (itself<br />

part of the Environmental Programme). Specific activities are designed, budgeted and implemented. Offset<br />

design and early implementation cost estimates are presented in Table 9.<br />

Table 9: Summary of estimated costs<br />

Human resources Staff Tasks<br />

<strong>Project</strong> focal point :<br />

Pierre Berner (<strong>Ambatovy</strong><br />

<strong>Project</strong> Environmental<br />

Director)<br />

Superintendent<br />

responsible for Ankerana<br />

site: monsieur Alphonse<br />

(<strong>Ambatovy</strong> <strong>Project</strong>)<br />

Superintendent<br />

responsible for Special<br />

Programs: Irene Daso<br />

(<strong>Ambatovy</strong> <strong>Project</strong>)<br />

Environmental<br />

Coordinator for Ankerana<br />

(Sylvain Be Totozafy)<br />

Technical support team<br />

Ankerana management:<br />

Environmental <strong>Forest</strong><br />

Technician (to be filled)<br />

Environmental<br />

Community Agent (to be<br />

filled)<br />

Guest house manager<br />

(to be filled)<br />

BBOP programme<br />

management: Steven<br />

Dickinson (Golder<br />

Associates)<br />

BBOP design ecological<br />

assessment: Aristide<br />

Andrianarimisa (WCS)<br />

1 Ensure communication / meetings (international)<br />

with BBOP committee and management of<br />

overall <strong>Ambatovy</strong> BBOP programme.<br />

1 Ankerana off-site offset management.<br />

Spearheading legal protection status programme<br />

with governmental and local STAKEHOLDERS.<br />

Supervising financial arrangements for<br />

programme’s long term viability.<br />

1 Support <strong>Project</strong> focal point. Liaising with local<br />

and international stakeholders (e.g. CI).<br />

1 Ensuring local stakeholder involvement.<br />

Supervising Ankerana zoning (core / buffer /<br />

inhabited areas). Awareness campaigns.<br />

Costs (man<br />

days per<br />

annum*)<br />

Cost for 2008,<br />

2009 (USD)<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

24<br />

36<br />

12<br />

132<br />

3 Ankerana <strong>Forest</strong> and community management. 264<br />

(currently<br />

one staff<br />

member)<br />

1 Managing overall BBOP design, including<br />

benchmark / loss / gain calculations.<br />

1 Conducting benchmark / loss / gains calculations<br />

and overall ecological assessments.<br />

36<br />

140<br />

54


Summary of Offset Process Costs 55<br />

Human resources Staff Tasks<br />

BBOP external auditing<br />

progress reports: Jon<br />

Ekstrom (TBC)<br />

(1) Carry out a technical peer review of the<br />

<strong>Ambatovy</strong> offset (e.g. benchmark, losses and<br />

gain calculation).<br />

Costs (man<br />

days per<br />

annum*)<br />

Cost for 2008,<br />

2009 (USD)<br />

TOTALS 9 646 560,000<br />

* based on 2008 man days<br />

The average annual operational costs are in the process of being established and are estimated to be in the<br />

range US$ 250,000 <strong>–</strong> 300,000 per annum.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

2


10. <strong>Project</strong> Outcomes<br />

Actual outcomes<br />

Since the offset is still in the design phase, the actual CONSERVATION OUTCOMES to date are limited. They<br />

represent what the <strong>Project</strong> has achieved thus far and the benefits its shareholders already enjoyed, including:<br />

Legal protection status: the extension of the temporary protection of Ankerana has been secured until the<br />

Ministerial Decree for protection is finalisation;<br />

Integration of Ankerana into the national protected areas network;<br />

Coordination between government organisations, NGOs, local communities and the private sector;<br />

Public awareness;<br />

Reforestation activities; and<br />

<strong>Forest</strong> and TAXA-specific conservation management plans: specific taxa conservation management<br />

programs were developed for flora, lemurs, Mantella species and fish. Although these programs were<br />

developed as part of the Biodiversity Action Plan, their importance is reinforced by their aim of ensuring the<br />

conservation of azonal habitat and associated species, thus ensuring that all KEY BIODIVERSITY<br />

COMPONENTs present on the impact site are present at the offset.<br />

Anticipated outcomes<br />

The benefits anticipated as the final outcome of the offset include:<br />

Averted loss of forest habitat:<br />

<strong>–</strong> The offset is designed to result in no net loss of biodiversity and will strive to attain a NET GAIN.<br />

<strong>–</strong> The initial objective was to secure the Ankerana site, but with additional insight the <strong>Project</strong> is presently<br />

aiming to extend the expanse of protected areas it will be managing indirectly (Ankerana) or directly<br />

(e.g. the on-site mine area conservation zones).<br />

<strong>–</strong> The <strong>Project</strong> aims to also spearhead the creation of the Analamay-Mantadia forest corridor enabling<br />

connectivity between the mine area conservation areas and the SAPM.<br />

Community benefits: The creation of the offset will be conducted though integration of a socioeconomic<br />

and cultural component, which is the key to its long-term viability. A socio-environmental compensation<br />

programme will be designed during 2009 and subsequently to support social integration and ensure this.<br />

The programme will assess the compensation options available. Its partnerships with NGOs and agencies<br />

such USAID, PACT and ERIE will provide valuable insights. Specific activities that will be explored include<br />

fuel wood reforestation using native species, planting in suitable locations that avoid biodiversity impacts of<br />

biofuel crops (e.g., Jatropha plant), aquaculture and improved crop yield techniques. The programs will be<br />

integrated with social programs, especially complementary educational and family planning programs that<br />

contribute to reductions in human pressure on natural resources and forests. Other programs that will be<br />

critical to the overall success of the offset include fire management, hunting / bushmeat management and<br />

forest resource management.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

56


<strong>Project</strong> Outcomes 57<br />

Improved communication: information available to international NGOs did not reflect the full scale of works<br />

conducted in the field by the <strong>Project</strong>. The reason was linked to rather limited communication efforts by the<br />

<strong>Project</strong>, which was subsequently ramped up. The high velocity of <strong>Project</strong> implementation has been<br />

generally overwhelming for most NGOs, who felt they needed a deeper involvement with the <strong>Project</strong>. Such<br />

aspects were discussed in detail with CI, <strong>Forest</strong> <strong>Trends</strong> and WCS in November 2008. The <strong>Project</strong> will<br />

present and implement its communication strategy on biodiversity management and BBOP activities in<br />

2009. The offset programme is not yet mentioned as a standalone project on the Sherritt web site, however<br />

it is mentioned on the Environmental Assessment documents (page 12), available at:<br />

http://www.sherritt.com/doc08/subsection.php?submenuid=operations&category=operations/metal<br />

s_ambatovy.<br />

A specific web page will ultimately describe in detail the biodiversity offset process and activities, including<br />

this case study and subsequent, updated versions of it.<br />

Stakeholder confidence: the <strong>Project</strong> hopes to increase and consolidate the confidence of the public<br />

(government, NGOs, authorities and the public at large) and private partners, (banks) and demonstrate its<br />

commitment to sustainability. This is strongly linked to both the communication effort and compliance<br />

activities. The governmental authorities and local communities are aware of, and have taken part in, the<br />

offset activities. <strong>Project</strong> partners and lender banks have monitored the progress of the offset programme<br />

through quarterly audits and bi-annual biodiversity audits.<br />

Significant scientific knowledge will be obtained through biological surveys (which underpin the loss and<br />

gain calculations), especially at Ankerana, where studies have been limited despite the description of these<br />

ultramafic outcrops as biodiversity hotspots. The <strong>Project</strong> intends to prepare external publications of its<br />

biodiversity management programs, especially for MITIGATION in high biodiversity areas, possibly setting a<br />

precedent for other mining projects in <strong>Madagascar</strong>. A publication, likely a monograph of both the impact<br />

and offset sites, will be produced in collaboration with scientific partners. An article on the <strong>Project</strong> was<br />

provided to the CBD newsletter Business 2010 in April 2008 (www.cbd.int/doc/newsletters/news-biz-<br />

2008-04/).<br />

<strong>Forest</strong> restoration: the reforestation activities include targeted reforestation with native species to improve<br />

connectivity around the Ankerana offset site and between it and the remaining forest corridor; similar<br />

programs exist around the mine and the pipeline component.<br />

Taxa-specific conservation: species taxa conservation management programs will be developed for key<br />

taxa such as lemurs, Mantella spp., flora and fish, on the same basis as those developed at the mine site.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


11. Lessons Learned<br />

The main lesson learned to date (during the offset conceptualisation and design stages) is that a commitment<br />

to implement a biodiversity offset can generate substantial interest and respect from third parties for the<br />

<strong>Project</strong> developer in tandem with delivering real and measurable benefits for biodiversity. The ‘NO NET LOSS’<br />

offset represents a strong and positive vision that allows the <strong>Project</strong> to present its mitigation programme<br />

elegantly and coherently to third parties.<br />

The main difficulties encountered to date have been:<br />

While beneficial, the BBOP guideline development process has been lengthy, dense and not always<br />

readily applicable to the <strong>Ambatovy</strong> <strong>Project</strong>. However, the <strong>Project</strong> feels privileged to continue with its<br />

contribution to the improvement of the offset design tools though its feedback.<br />

The integration of biodiversity offsets at the ESIA stage is also crucial if baseline data collection is to:<br />

<strong>–</strong> Prioritise target species with high biodiversity value for the Key Biodiversity Components Matrix;<br />

<strong>–</strong> Target sampling stations to ensure that a benchmark is identified;<br />

<strong>–</strong> Ensure loss and gain sites are adequately covered; and<br />

<strong>–</strong> Ensure that quantitative data is gathered for the HABITAT HECTARES calculations.<br />

Ideally, the offset calculations for LOSSES and GAINS should have been completed before <strong>Project</strong> construction<br />

began, in order to alleviate the risk of being confronted with a low gains score. Greater targeting of baseline<br />

data collection during the ESIA would have helped reduce the cost and time associated with subsequent filling<br />

of data gaps.<br />

11.1 Limitations<br />

Limitations and issues identified during the habitat hectare calculations are presented below.<br />

11.1.1 Available data<br />

The main limitation for the <strong>Ambatovy</strong> <strong>Project</strong> offset design is that only azonal forests were sufficiently<br />

sampled for habitat structure ATTRIBUTES. Fewer data exist for zonal and transitional habitats. In addition,<br />

more accurate improved diversity and abundance data were required for species (especially lemurs and<br />

other taxa) in both the benchmark and impact areas. Obtaining these data in 2009 should improve<br />

precision of the habitat hectares loss calculation.<br />

No available data exist at present for the selected attributes at the proposed Ankerana offset site. This<br />

means that offset gains cannot yet be calculated.<br />

Some of the existing data were not sufficiently habitat specific to meet the requirements of the habitat<br />

hectares calculations. The fauna data did not allow the species identified to be clearly linked to either the<br />

three ecological vegetation classes (azonal, transitional and zonal) or the habitat CONDITION classes. The<br />

January 2009 fauna surveys will aim to resolve this.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

58


Lessons Learned 59<br />

11.1.2 Averaging<br />

Averaging of attribute values was necessary in the habitat hectares calculation in order to avoid overly<br />

conservative results and to reflect the reality of conditions on the ground. However, it is commonly recognised<br />

that by calculating averages of vegetation parameters within a large area, habitat heterogeneity and its<br />

variations, which are the key elements for microclimate and ecological processes, are masked (Whittaker et<br />

al. 1974; Parkes et al. 2003). This approach thus limits the impact of variability on the calculation. While the<br />

variation is small-scale, considering its effects is important.<br />

11.2 Recommendations<br />

1. Integrate a temporal parameter to the post-<strong>Project</strong> impact in the habitat hectares calculation in order to<br />

show the <strong>Project</strong>’s success through time in reducing habitat hectares loss. This aspect is important for time<br />

discounting (i.e. delay of offset creation and delivery of ultimate habitat hectares gain, see Step 7).<br />

2. Averaging of contiguous HABITAT TYPES as far as habitat classes is optimal as it best reflects the reality of<br />

conditions in the impact area.<br />

3. Tools are based merely on numerical data that might not always have a biological and / or ecosystem<br />

health significance. It is important to assess how to integrate biodiversity qualitative data (like ENDEMISM,<br />

only presence / absence etc.) with the habitat hectares calculation.<br />

4. There is a need for a ‘Weighting Guideline’ to guide the operator in weighting attributes, since this will<br />

ultimately affect the scoring.<br />

5. SPECIES DIVERSITY and other fauna attributes should be used (e.g., lemur and herpetofauna) as often as<br />

possible to better reflect true biodiversity values (as opposed to forest structural SURROGATES).<br />

6. The <strong>Project</strong> should design its data acquisition programs at the ESIA stage (baseline collection) to ensure it<br />

meets the habitat hectares calculation requirements in an optimal fashion (e.g. fauna, flora, aquatics<br />

sample sites linked with all main vegetation types likely to be impacted, as well as their condition classes <strong>–</strong><br />

for example, good / disturbed).<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


12. Next Steps<br />

The next steps for the <strong>Ambatovy</strong> offset team are presented below:<br />

1. Habitat hectares loss scores:<br />

a. Integrate the IMPACT SITE and benchmark terrestrial fauna data being gathered in January 2009,<br />

integrate Mantella aurantiaca and M. crocea data that is being acquired for these two key species as<br />

part of the Mantella Management Programme during 2009, re-evaluate the fish and aquatic (stream<br />

and ponds) data to adequately integrate with the KBCM; this will imply reassessing the weighting of<br />

the attributes generally, giving more importance to the species attributes to better reflect BIODIVERSITY<br />

LOSS values.<br />

b. Re-calculate habitat hectares loss scores for the impact site, for each forest habitat type (azonal,<br />

transitional and zonal), aquatic ecosystems (streams and ponds) and condition class.<br />

2. Habitat hectares gain scores:<br />

a. Prepare and implement the habitat, flora, fauna and aquatics BASELINE data collection at the proposed<br />

Ankerana offset site.<br />

b. Calculate habitat hectares gains scores for the variety of POTENTIAL OFFSET SITES (e.g. contiguous with<br />

the mine footprint, the Analamay-Mantadia Corridor and the Ankerana offset site), for each forest<br />

habitat type (azonal, transitional and zonal), aquatic ecosystems (streams and ponds) and condition<br />

class.<br />

3. Socio-environmental losses and compensation calculations:<br />

a. Apply cost-benefit model and analysis using key elements of the BBOP BIODIVERSITY OFFSET COST-<br />

BENEFIT HANDBOOK to determine the ecosystems services to the local communities in and around<br />

Ankerana as well as the mine site (COMPOSITE OFFSET).<br />

b. Determine socio-environmental compensations required, including compensations options; the <strong>Project</strong><br />

will distinguish between legal and illegal activities specifically (the latter being obviously recognised by<br />

local legislation as unsustainable).<br />

c. Design and implement a compensation programme.<br />

4. Offset management programme:<br />

a. In light of both the biodiversity and socio-environmental inputs, the <strong>Project</strong> will finalise the design of<br />

the Ankerana (and mine site) management programs.<br />

b. The <strong>Project</strong> will implement and monitor the implementation of the programs.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

60


Next Steps 61<br />

5. Legal protection status:<br />

a. The <strong>Project</strong> will pursue the finalisation of the Ministerial Protection Decree for Ankerana and creation<br />

of a protection status for the mine area conservation zones forests; the status of other offset<br />

programme components (Analamay-Mantadia Corridor, Ramsar site) will also be pursued in<br />

collaboration with the <strong>Project</strong>’s partners (CI).<br />

b. The Ankerana offset jurisdictional protection status is being finalised with Malagasy authorities with its<br />

integration in the National Park network, in order to ensure the long-term protection status of the site<br />

from a legal perspective.<br />

6. Other activities:<br />

a. The <strong>Project</strong> will be pursuing the implementation of its MITIGATION HIERARCHY strategy, namely through<br />

the Biodiversity Action Plan and the taxa-specific management programmes for lemurs, Mantella, fish<br />

and flora.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


13. References<br />

Benstead, J.P., De Rham, P.H., Gattolliat, J.-L., Gibon, F.-M., Loiselle, P.L.V., Sartori, M., Sparks, J.S. and<br />

Stiassny, M.L.J. 2003. Conserving <strong>Madagascar</strong>’s Freshwater Biodiversity. Bioscience 53 (11): 1101-1111 [see<br />

Appendix 3].<br />

Dufils, J.-M. 2003. Pact <strong>Madagascar</strong> (see http://www.pactworld.org/cs/africa/madagascar).<br />

Ganzhorn, J.U., Andrianasolo, T., Andrianjazalahatra, T., Donati, G., Fietz, J. et al. 2007. Lemur in evergreen<br />

littoral forest fragments. In Biodiversity, Ecology and Conservation of Littoral Ecosystem in Southeastern<br />

<strong>Madagascar</strong>, Tolagnaro (Fort Dauphin). Serie editor Alfonso Alonso. SI/MAB Serie # 11. Smithsonian<br />

Institution, Washington DC. USA [see Appendix 3].<br />

Grooves, C. 2000. The genus Cheirogaleus: unrecognized diversity in dwarf lemurs. International Journal of<br />

Primatology, 21 (6): 943-962 [see Appendix 3].<br />

International Council on Mining and Metals (ICMM). 2006. Good Practice Guidance for Mining and<br />

Biodiversity. ICMM, 19 Stratford Place, London W1C 1BQ, United Kingdom.<br />

International Council on Mining and Metals (ICMM). 2008. Planning for Integrated Mine Closure: Toolkit,<br />

ICMM, 19 Stratford Place, London W1C 1BQ, United Kingdom.<br />

International Finance Corporation (IFC). 2006. Performance Standard 6, Biodiversity Conservation and<br />

Sustainable Natural Resource Management, World Bank Group.<br />

ten Kate, K., Bishop, J., and Bayon, R. 2004. Biodiversity offsets: Views, experience, and the business case.<br />

IUCN, Gland, Switzerland and Cambridge, UK and Insight Investment, London, UK. ISBN: 2-8317-0854-0.<br />

Kattan, G.H. 1992. Rarity and vulnerability: The Birds of the Cordillera Central of Colombia. Conservation<br />

Biology 6 (1): 64-70.<br />

Kleynhans, C.J. 1996. A qualitative procedure for the assessment of the habitat integrity status of the Luvuvhu<br />

River (Limpopo System, South Africa). J. Aquat. Ecosystem Health 5: 41-54 [see Appendix 3].<br />

Kleynhans, C.J. 1999. Comprehensive Habitat Integrity Assessment. In: Water Resources Protection. Policy<br />

Implementation. Resource Directed Measures for Protection of Water Resources. River Ecosystems. Version<br />

1 Department of Water Affairs and <strong>Forest</strong>ry [see Appendix 3].<br />

Meyers, N., Mittermeier, R.A., Mittermeier, C.G., Fonseca, G.A.B da and Kent, J. 2000. Biodiversity hotspots<br />

for conservation priorities. Nature 403: 853<strong>–</strong>858 [see Appendix 3].<br />

Parkes, D., Newell, G. and Cheal, D. 2003. Assessing the quality of native vegetation: the ‘habitat hectares’<br />

approach. Ecological Management and Restoration 4, S29-S38.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

62


References 63<br />

Rabinowitz, D.S., Cairns, S. and Dillon, T. 1986. Seven forms of rarity and their frequency in the flora of the<br />

British Isles. In Soulé, M. E. (eds.). Conservation biology: the science of scarcity and diversity. Sinauer<br />

Associates, Sunderland, Massachusetts.<br />

Rakotoarison, N., Zimmermann, H., & Zimmermann, E. 1997. First discovery of the hairy-eared dwarf lemur<br />

(Allocebus trichotis) in a higland rain forest of eastern <strong>Madagascar</strong>. Folia Primatologica 68 : 86-94 [see<br />

Appendix 3].<br />

Schmid, J. and Alonso, L.E. (eds). 2005. A rapid biological assessment of the Mantadia-Zahamena Corridor,<br />

<strong>Madagascar</strong>. RAP Bulletin of Biological Assessment No. 32. Conservation International. Washington, D.C.).<br />

Watson, J. E. 2007. Conservation of Bird Diversity in <strong>Madagascar</strong> Southeastern Littoral forest [see Appendix<br />

3].<br />

Whittaker, R.H., Bormann, F.H., Likens, G.E. and Siccama, T.G. 1974. The Hubbard Brook Ecosystem Study:<br />

forest biomass and production. Ecol. Monogr. 44(2):233-254.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components<br />

Matrix (KBCM) and Habitat Hectares Score,<br />

December 2008 Iteration<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

64


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 65<br />

Key Biodiversity Components Matrix<br />

Biodiversity Component<br />

Significance<br />

Intrinsic, 'non use' Values<br />

Biodiversity Assessment<br />

Irreplaceability<br />

(mark only one)<br />

Global National Local Site Endemic Localized Widespread<br />

Species<br />

MAMMALS<br />

Prosimans (primates)<br />

Allocebus trichotis DD X Ecotourism, illegal bush meat, CITES I Tabou<br />

Avahi laniger LC X Ecotourism, illegal bush meat, CITES I<br />

Cheirogaleus crossleyi DD X Ecotourism, illegal bush meat, CITES I<br />

Cheirogaleus major LC X Ecotourism, illegal bush meat, CITES I<br />

Daubentonia madagascariensis NT X Ecotourism, illegal bush meat, CITES I<br />

Eulemur fulvus fulvus NT X Ecotourism, illegal bush meat, CITES I, pet trade<br />

Eulemur rubriventer VU X Ecotourism, illegal bush meat, CITES I<br />

Hapalemur griseus griseus VU X Ecotourism, illegal bush meat, CITES I<br />

Indri indri EN X Ecotourism, illegal bush meat, CITES I Tabou Existence of illegal bush meat for all these lemur species<br />

Lepilemur microdon DD X Ecotourism, illegal bush meat, CITES I<br />

Lepilemur mustelinus DD X Ecotourism, illegal bush meat, CITES I<br />

Microcebus lehilahytsara DD X Ecotourism, illegal bush meat, CITES I<br />

Microcebus rufus LC X Ecotourism, illegal bush meat, CITES I<br />

Prolemur simus CR X Ecotourism, illegal bush meat, CITES I Ecological services: main seeds disperseurs<br />

Propithecus d. diadema EN X Ecotourism, illegal bush meat, CITES I Ecological services: main seeds disperseurs<br />

Varecia v. variegata<br />

Carnivores<br />

CR X Ecotourism, illegal bush meat, CITES I<br />

Cryptoprocta ferox VU X Ecotourism, illegal bush meat<br />

Fossa fossana NT X illegal bush meat<br />

Galidia elegans<br />

Small mammals<br />

LC X illegal bush meat<br />

Brachytarsomis albicauda NE X illegal bush meat symbiotic to Allocebus trichotis<br />

Eliurus minor LC X illegal bush meat<br />

Eliurus tanala LC X illegal bush meat<br />

Eliurus webbi LC X illegal bush meat<br />

Microgale cowani LC X illegal bush meat<br />

Microgale drouhardi LC X illegal bush meat<br />

Microgale majori LC X illegal bush meat<br />

Microgale thomasi LC X illegal bush meat<br />

Myotis goudoti LC X illegal bush meat<br />

BIRDS<br />

Accipiter henstii NT X pet trade, CITES II<br />

Accipiter madagascariensis NT X pet trade, CITES II<br />

Acridotheres tristis NE X<br />

Agapornis cana cana LC X pet trade, CITES II<br />

Alectroenas madagascariensis LC X<br />

Anas melleri EN X<br />

Ardea humbloti EN X<br />

Asio madagascariensis LC X pet trade, CITES II<br />

Atelornis pittoides LC X<br />

Aviceda madagascariensis LC X pet trade, CITES II<br />

Berneria zosterops LC X<br />

Bernieria cinereiceps NT X<br />

Brachypteracias squamigera VU X<br />

Buteo brachypterus LC X<br />

Calicalicus madagascariensis LC X<br />

Canirallus kioloides LC X<br />

Caprimulgus enarratus LC X<br />

Caprimulgus madagascariensis LC X<br />

Circus m. macrosceles VU X<br />

Copsychus albospecularis LC X<br />

Coracopsis nigra nigra LC X pet trade, CITES II<br />

Coracopsis vasa vasa LC X pet trade, CITES II<br />

Coua caerulea LC X<br />

Coua reynaudii LC X<br />

Coua serriana LC X<br />

Crossleyia xanthophrys NT X<br />

Cyanolanius madagascarinus LC X<br />

Dromaeocercus brunneus LC X<br />

Eurystomus glaucurus LC X<br />

Falco eleonorae LC X pet trade, CITES II<br />

Falco newtoni newtoni LC X pet trade, CITES II<br />

Foudia madagascariensis LC X<br />

Foudia omissa LC X<br />

Gallinago macrodactyla NT X<br />

Hypsipetes madagascariensis LC X<br />

Leptopterus chabert LC X<br />

Lonchura nana LC X<br />

Lophotibis cristata NT X<br />

Margaroperdix madagascariensis LC X<br />

Milvus migrans LC X pet trade, CITES II<br />

Mystacornis crossleyi LC X<br />

Nectarinia notata LC X<br />

Neodrepanis coruscans LC X<br />

Neomixis flavoviridis NT X<br />

Neomixis tenella LC X<br />

Neomixis viridis LC X<br />

Nesillas typica LC X<br />

Newtonia brunneicauda LC X<br />

Ninox superciliaris LC X pet trade, CITES II<br />

Otus rutilus rutilus LC X pet trade, CITES II<br />

Oxylabes madagascariensis LC X<br />

Philepitta castanea LC X<br />

Ploceus nelicourvi LC X<br />

Polyboroides radiatus LC X pet trade, CITES II<br />

Rallus madagascariensis VU X<br />

Sarothrura insularis NE X<br />

Sarothrura watersi EN X<br />

Tylas eduardi LC X<br />

Tyto soumagnei EN X CITES I<br />

Vanga curvirostris LC X<br />

Xenopirostris polleni NT X<br />

Zosterops maderaspatana LC X<br />

Use Values<br />

Socioeconomic Values Cultural Values<br />

Justification<br />

(Insert comments here explaining<br />

data entered in columns A to I)<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 66<br />

Key Biodiversity Components Matrix<br />

Biodiversity Component<br />

Significance<br />

Intrinsic, 'non use' Values<br />

Biodiversity Assessment<br />

Irreplaceability<br />

(mark only one)<br />

Global National Local Site Endemic Localized Widespread<br />

Species<br />

REPTILES<br />

Amphiglossus melenopleura NE X<br />

Amphiglossus minutus NE X<br />

Amphiglossus mouroundavae NE X<br />

Amphiglossus punctatus NE X<br />

Brookesia superciliaris NE X pet trade, CITES II<br />

Brookesia therezieni NE X pet trade, CITES II<br />

Brookesia thieli NE X pet trade, CITES II<br />

Calumma brevicornis NE X pet trade, CITES II<br />

Calumma cf nasuta NE X pet trade, CITES II<br />

Calumma crypticum NE X pet trade, CITES II<br />

Calumma gastrotaenia NE X pet trade, CITES II<br />

Calumma malthe NE X pet trade, CITES II<br />

Calumma nasuta NE X pet trade, CITES II<br />

Calumma parsoni NE X pet trade, CITES II<br />

Ebenavia inunguis NE X pet trade, CITES II<br />

Exallodontophis albignaci NE X<br />

Furcifer lateralis NE X pet trade, CITES II<br />

Furcifer willsii NE rare X pet trade, CITES II<br />

Geodipsas laphystia NE X<br />

Itycyphus perineti NE X<br />

Leioheterodon madagascariensis NE X<br />

Liophidium nov. sp. 1 NE X<br />

Liophidium nov. sp. 2 NE X<br />

Liophidium rhodogaster NE X<br />

Liophidium torquatus NE X<br />

Liopholidophis dolicocercus NE X<br />

Liopholidophis epistibes NE X<br />

Liopholidophis infrasignatus NE X<br />

Liopholidophis pinguis NE X<br />

Liopholidophis thieli NE X<br />

Lygodactylus guibei NE X<br />

Lygodactylus miops NE X<br />

Mabuya gravenhorstii NE X<br />

<strong>Madagascar</strong>ophis colubrinus NE X<br />

Micropisthodon ochraceus NE rare X<br />

Paroedura gracilis NE X<br />

Phelsuma lineata bifasciata NE X pet trade, CITES II<br />

Phelsuma lineata lineata? NE X pet trade, CITES II<br />

Phelsuma madagascariensis NE X<br />

Phelsuma pronki NE high extinction risk X pet trade, CITES II<br />

Phelsuma pusilla hallmanni NE X<br />

Phelsuma quadriocellata bimaculata NE X pet trade, CITES II<br />

Phelsuma quadriocellata quadriocellata NE X pet trade, CITES II<br />

Pseudoxyrhopus microps NE X<br />

Pseudoxyrhopus tritaeniatus NE X<br />

Sanzinia madagascariensis VU X bushmeat, CITES I<br />

Stenophis arctifasciatus NE X<br />

Typhlops sp. NE X<br />

Uroplatus phantasticus NE X pet trade, CITES II<br />

Uroplatus pieschmanni NE X pet trade, CITES II<br />

Uroplatus sikorae NE X pet trade, CITES II<br />

Zonosaurus aeneus NE X<br />

Zonosaurus madagascariensis LC X<br />

AMPHIBIANS<br />

Aglyptodactylus madagascariensis LC X<br />

Anodonthyla boulengeri LC X<br />

Blommersia blommersae LC X<br />

Blommersia grandisonae LC X<br />

Boophis albilabris LC X<br />

Boophis boehmei NE X<br />

Boophis brachychir NE X<br />

Boophis burgeri NE X<br />

Boophis cf.burgeri NE X<br />

Boophis cf.miniatus NE X<br />

Boophis cf.sibilans NE X<br />

Boophis erythrodactylus LC X<br />

Boophis goudoti LC X<br />

Boophis guibei LC X<br />

Boophis idae LC X<br />

Boophis luteus LC X<br />

Boophis madagascariensis LC X<br />

Boophis marojezensis LC X<br />

Boophis nov. sp. NE X<br />

Boophis pyrrhus NE X<br />

Boophis reticulatus LC X<br />

Boophis sibilans DD X<br />

Boophis viridis LC X<br />

Gephyromantis cf. leucocephala NE X<br />

Gephyromantis asper NE X<br />

Gephyromantis boulengeri LC X<br />

Gephyromantis cf.boulengeri NE X<br />

Gephyromantis plicifer NT X<br />

Guibemantis albolineatus DD X<br />

Guibemantis cf. bicalcaratus NE X<br />

Guibemantis cf.albolineatus NE X<br />

Guibemantis depressiceps LC X<br />

Guibemantis flavobrunneus NE X<br />

Guibemantis liber LC X<br />

Guibemantis tornieri LC X<br />

Heterixalus betsileo LC X<br />

Mantella aurantiaca CR X pet trade, CITES II<br />

Mantella baroni NE X pet trade, CITES II<br />

Mantella crocea EN X pet trade, CITES II<br />

Mantidactylus argenteus LC X<br />

Mantidactylus betsileanus LC X<br />

Use Values<br />

Socioeconomic Values Cultural Values<br />

Justification<br />

(Insert comments here explaining<br />

data entered in columns A to I)<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 67<br />

Key Biodiversity Components Matrix<br />

Biodiversity Component<br />

Significance<br />

Intrinsic, 'non use' Values<br />

Global National Local Site Endemic Localized Widespread<br />

Species<br />

Mantidactylus cf. betsileanus NE X<br />

Mantidactylus femoralis LC X<br />

Mantidactylus guttulatus LC X<br />

Mantidactylus melanopleura LC X<br />

Mantidactylus opiparis LC X<br />

Mantidactylus sp. C NE X<br />

Mantidactylus sp. H NE X<br />

Mantidactylus zipperi LC X<br />

Paradoxophyla palmata NE X<br />

Platypelis barbouri LC X<br />

Platypelis cf.barbouri NE X<br />

Platypelis grandis LC X<br />

Platypelis pollicaris DD X<br />

Platypelis sp. (aff. mavomavo) NE X<br />

Platypelis sp.nov NE new undescribed species X<br />

Platypelis tuberifera LC X<br />

Plethodontohyla inguinalis LC X<br />

Plethodontohyla mihanika LC X<br />

Plethodontohyla notosticta LC X<br />

Plethodontohyla nov. sp. NE X<br />

Plethodontohyla sp. NE X<br />

Rhombophryne alluaudi LC X<br />

Rhombophryne coronata VU X<br />

Rhombophryne coronata VU X<br />

Scaphiophryne marmorata VU X<br />

Scaphiophryne spinosa NE X<br />

Spinomantis aglavei LC X<br />

Spinomantis phantasticus NE X<br />

Stumpffia sp. "kibomena" NE X<br />

FISH<br />

Ratsirakia sp nov 1 (Mangoro catchment) NE new undescribed species X<br />

Ratsirakia sp nov 2 (Berano catchment) NE new undescribed species X<br />

Rheocles alaotrensis VU X<br />

Rheocles spp ? (Berano catchment) NE potential new species X<br />

Rheocles spp ? (Mangoro catchment) NE potential new species X<br />

Biodiversity Assessment<br />

Irreplaceability<br />

(mark only one)<br />

INSECTS<br />

Amblyopone sp. mad-01 NE rare X<br />

Amblyopone sp.2 NE rare X<br />

Artitropa hollandi NE rare X<br />

Cerapachys lividus NE rare X<br />

Cerapachys sp. mad-38 NE rare X<br />

Cerapachys sp.6 NE rare X<br />

Cerapachys sp.7 NE rare X<br />

Coeliades fidia NE rare X<br />

Colotis lucasi NE rare X<br />

Fulda imorina NE rare X<br />

Heteropsis andasibe NE rare X<br />

Heteropsis paradoxa NE rare X<br />

Hovala sp. 2 NE rare X<br />

Malaza carmides NE rare X<br />

Mystrium mysticum NE rare X<br />

Mystrium rogeri NE rare X<br />

Proceratium sp.1 NE rare X<br />

Smerina manoro NE rare X<br />

Strabena consobrina NE rare X<br />

Strabena dyscola NE rare X<br />

Strabena modestissima NE rare X<br />

Strabena niveata NE rare X<br />

Strabena perroti NE rare X<br />

Vitsika sp.1 NE rare X<br />

Use Values<br />

Socioeconomic Values Cultural Values<br />

Justification<br />

(Insert comments here explaining<br />

data entered in columns A to I)<br />

FLORA<br />

Adenia acuta rare X<br />

Aerangis citrata rare X ornemental<br />

Aerangis fastuosa rare X ornemental<br />

Aerangis macrocentra rare X ornemental<br />

Aerangis sp. rare X ornemental<br />

Aerangis stylosa rare X ornemental<br />

Aeranthes adenopoda rare X ornemental<br />

Aeranthes angustidens rare X ornemental<br />

Aeranthes antennophora rare X ornemental<br />

Aeranthes ecalcarata rare X ornemental<br />

Aeranthes fasciola rare X ornemental<br />

Aeranthes longipes rare X ornemental<br />

Aeranthes nidus rare X ornemental<br />

Aeranthes peyrotii rare X ornemental<br />

Aeranthes sp. rare X ornemental<br />

Aloe leandrii rare X medicinal value<br />

Amyrea sp patrimonial value X as defined by MBG<br />

Angraecum calceolus rare X ornemental<br />

Angraecum caricifolium rare X ornemental<br />

Angraecum chaetopodum rare X ornemental<br />

Angraecum chloranthum rare X ornemental<br />

Angraecum compactum rare X ornemental<br />

Angraecum danguyanum rare X ornemental<br />

Angraecum filicornu rare X ornemental<br />

Angraecum finetianum rare X ornemental<br />

Angraecum germinyanum rare X ornemental<br />

Angraecum graminifolium rare X ornemental<br />

Angraecum humblotianum rare X ornemental<br />

Angraecum lecomtei rare X ornemental<br />

Angraecum linearifolium rare X ornemental<br />

Angraecum mauritianum rare X ornemental<br />

Angraecum panicifolium rare X ornemental<br />

Angraecum pinifolium rare X ornemental<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 68<br />

Key Biodiversity Components Matrix<br />

Biodiversity Component<br />

Significance<br />

Intrinsic, 'non use' Values<br />

Biodiversity Assessment<br />

Irreplaceability<br />

(mark only one)<br />

Global National Local Site Endemic Localized Widespread<br />

Use Values<br />

Socioeconomic Values Cultural Values<br />

Justification<br />

(Insert comments here explaining<br />

data entered in columns A to I)<br />

Species<br />

Angraecum rhynchoglossum rare X ornemental<br />

Angraecum rostratum rare X ornemental<br />

Angraecum sedifolium rare X ornemental<br />

Angraecum setipes rare X ornemental<br />

Angraecum sp. rare X ornemental<br />

Angraecum teretifolium rare X ornemental<br />

Angraecum urschianum rare X ornemental<br />

Angraecum viguieri rare X ornemental<br />

Antirhea borbonica rare X<br />

Asparagus similens X Magical against demonic possessions<br />

Aspidostemon conoideum rare X<br />

Asplenium nidus patrimonial value X as defined by MBG<br />

Asplenium sp patrimonial value X as defined by MBG<br />

Asteropeia mcphersonii VU rare X timber for construction, bark = medicinal<br />

Astrotrichilia parvifolia rare X<br />

Baroniella acuminata rare X<br />

Baroniella linearis rare X<br />

Bathioramnus sp patrimonial value X as defined by MBG<br />

Benthamia sp. rare X ornemental<br />

Biophytum sp. nov. rare X ornemental<br />

Brexia montana rare X<br />

Bulbomolossus sp1 patrimonial value X as defined by MBG<br />

Bulbomolossus sp2 patrimonial value X as defined by MBG<br />

Bulbophyllum alexandrae rare X ornemental<br />

Bulbophyllum analamazoatrae rare X ornemental<br />

Bulbophyllum ankaizinense rare X ornemental<br />

Bulbophyllum aubrevillei rare X ornemental<br />

Bulbophyllum auriflorum rare X ornemental<br />

Bulbophyllum baronii rare,patrimonial value X ornemental<br />

Bulbophyllum complanatum rare X ornemental<br />

Bulbophyllum coriophorum rare X ornemental<br />

Bulbophyllum francoisii rare X ornemental<br />

Bulbophyllum leandrianum rare X ornemental<br />

Bulbophyllum longiflorum rare X ornemental<br />

Bulbophyllum lyperocephalum rare X ornemental<br />

Bulbophyllum molossus rare X ornemental<br />

Bulbophyllum multiflorum rare X ornemental<br />

Bulbophyllum occlusum rare X ornemental<br />

Bulbophyllum occultum rare X ornemental<br />

Bulbophyllum oxycalyx rare X ornemental<br />

Bulbophyllum pachypus rare X ornemental<br />

Bulbophyllum peyrotii rarepatrimonial value X ornemental<br />

Bulbophyllum platypodum rare X ornemental<br />

Bulbophyllum rhizomatosum rare X ornemental<br />

Bulbophyllum sandrangatense rare X ornemental<br />

Bulbophyllum sp. indet. rare X ornemental<br />

Bulbophyllum sulfureum rare X ornemental<br />

Burasaia sp. nov A rare X<br />

Byttneria heteromorpha rare X<br />

Caesalpinia delphinensis rare X<br />

Calantica sp nov. rare X<br />

Calophyllum mulvis X Magical against thunder<br />

Canarium sp. 2 (egregium) rare X<br />

Carallia brachiata X Magical astrology<br />

Carex sphaerogyna rare X<br />

Cassinopsis sp. nov. rare X<br />

Ceropegia cf. racemosa rare X<br />

Chassalia bojeri rare X<br />

Chassalia leptothyrsa rare X<br />

Chassalia stenantha rare X<br />

Cheirostylis gymnochiloides rare X ornemental<br />

Cirrhopetalum longiflorum rare X ornemental<br />

Claoxylon lancifolium rare X<br />

Claoxylopsis purpurascens rare X<br />

Cleistanthus sp. 1 rare X<br />

Coffea liaudii rare X<br />

Coffea mangoroensis rare, patrimonial value X<br />

Colea fusca rare X<br />

Colea sp nov. A rare X<br />

Combretum sp. nov. rare X<br />

Coptosperma sp. nov. '17' rare X<br />

Coptosperma sp. nov. '36' rare X<br />

Craterispermum laurinum rare X<br />

Croton alceicornu rare X<br />

Croton droguetioides rare X<br />

Croton lepidotoides rare X<br />

Croton sp. cf. jennyanum rare X<br />

Croton sp. nov. cf nitidulus 'cinereum' rare X<br />

Cryptocarya myristicoides rare X<br />

Cryptocarya pervillei rare X<br />

Cryptocarya spathulata rare X<br />

Cryptopus brachiatus rare X ornemental<br />

Cryptopus paniculatus rare X ornemental<br />

Cyathea cf tsaratananensis CITES II<br />

Cyathea dregei X CITES II<br />

Cyathea hildebrandtii rare X<br />

Cynanchum moramangense rare X<br />

Cynorkis angustipetala rare X ornemental<br />

Cynorkis aurantiaca rare X ornemental<br />

Cynorkis fastigiata rare X ornemental<br />

Cynorkis flexuosa rare X ornemental<br />

Cynorkis gibbosa rare X ornemental<br />

Cynorkis graminea rare X ornemental<br />

Cynorkis jumelleana rare X ornemental<br />

Cynorkis lilacina rare X ornemental<br />

Cynorkis lowiana rare X ornemental<br />

Cynorkis purpurascens rare X ornemental<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 69<br />

Key Biodiversity Components Matrix<br />

Biodiversity Component<br />

Significance<br />

Intrinsic, 'non use' Values<br />

Biodiversity Assessment<br />

Irreplaceability<br />

(mark only one)<br />

Global National Local Site Endemic Localized Widespread<br />

Use Values<br />

Socioeconomic Values Cultural Values<br />

Justification<br />

(Insert comments here explaining<br />

data entered in columns A to I)<br />

Species<br />

Cynorkis ridleyi rare X ornemental<br />

Cynorkis sp. rare X ornemental<br />

Cynorkis uncinata rare X ornemental<br />

Cyperus longifolius rare X<br />

Dalbergia baronii VU X timber for furniture (rose wood)<br />

Danais andribensis rare X<br />

Danais humblotii rare X<br />

Danais ligustrifolia rare X<br />

Danais pauciflora rare X<br />

Danais pubescens rare X<br />

Dicoryphe laurina rare X<br />

Dilobea thouarsii patrimonial value X as defined by MBG<br />

Diospyros sp patrimonial value X as defined by MBG<br />

Diporidium louvelii rare X<br />

Disperis oppositifolia rare X ornemental<br />

Distephanus aff. garnieriana rare X<br />

Dombeya biumbellata rare X<br />

Dombeya megaphylla rare X<br />

Dombeya sp patrimonial value X as defined by MBG<br />

Dombeya spectabilis rare X<br />

Dracaena sp. 3 rare X<br />

Dracaena sp2 patrimonial value X as defined by MBG<br />

Dypsis sp. nov. 2 (aff. hildebrandtii) rare X<br />

Elaphoglossum sp. 'B' rare X<br />

Embelia nummulariifolia rare X<br />

Erica sp. 'senescens' rare X<br />

Erythroxylum "sp. 2 rare X<br />

Erythroxylum ferrugineum rare X<br />

Erythroxylum sp. 1 rare X<br />

Erythroxylum sp. 3 rare X<br />

Erythroxylum sp. 4 rare X<br />

Erythroxylum sp. 5 rare X<br />

Erythroxylum sp. 6 rare X<br />

Erythroxylum sp. 7 rare X<br />

Erythroxylum sp. 8 rare X<br />

Eugenia alaotrensis rare X<br />

Eugenia arthroopoda rare X<br />

Eugenia goviala rare X<br />

Eugenia sp. Nov 3 rare X<br />

Eugenia sp. Nov 4 rare X<br />

Eugenia sp. Nov. 1 rare X<br />

Eugenia sp. Nov. 2 rare X<br />

Euphorbia rangovalensis rare X<br />

Exacum bulbilliferum rare X<br />

Filicium sp patrimonial value X as defined by MBG<br />

Gaertnera aff. Pauciflora rare X<br />

Gaertnera madagascariensis rare X<br />

Gaertnera obovata rare X<br />

Gaertnera obovata rare X<br />

Gaertnera phanerophlebia rare X<br />

Gaertnera phyllostachya rare X<br />

Gallienia sclerophylla rare X<br />

Gastropis sp patrimonial value X as defined by MBG<br />

Gastrorchis francoisii rare X ornemental<br />

Gastrorchis humblotii rare X ornemental<br />

Gastrorchis pulchra rare X ornemental<br />

Gouania mauritiana X Magical against evil spirits<br />

Grammangis ellisii rare X ornemental<br />

Grammangis sp. indet. rare X ornemental<br />

Gravesia setifera rare X<br />

Gravesia setifera vel. sp.aff. rare X<br />

Gravesia sp. nov. cf. baronii rare X<br />

Gravesia tanalensis rare X<br />

Gussonea gilpinae rare X ornemental<br />

Habenaria sp. indet. rare X ornemental<br />

Helichrysum sp. nov. aff. ambondrombeense rare X<br />

Homalium axillare rare X<br />

Homalium maringitra rare X<br />

Homolliella sericea rare X<br />

Homolliella sp. nov. 'pauciflora' ined. rare X<br />

Hyperacanthus sp. indet. rare X<br />

Hyperacanthus sp. nov. ined. 'mangoroensis' rare X<br />

Hyperacanthus thouvenotii rare X<br />

Inula speciosa rare X<br />

Ixora trichocalyx rare X<br />

Jasminum sp patrimonial value X as defined by MBG<br />

Jumellea arborescens rare X ornemental<br />

Jumellea brachycentra rare X ornemental<br />

Jumellea francoisii rare X ornemental<br />

Jumellea gracilipes rare X ornemental<br />

Jumellea lignosa rare X ornemental<br />

Jumellea punctata rare X ornemental<br />

Jumellea sagittata rare X ornemental<br />

Jumellea sp. rare X ornemental<br />

Jumellea teretifolia rare X ornemental<br />

Keraudrenia macrantha rare X<br />

Khaya madagascariensis rare X<br />

Korthalsella commersonii rare X<br />

Lemurella virescens rare X ornemental<br />

Lemyrea sp. rare X<br />

Leptolaena multiflora EN X timber for construction, bark = medicinal<br />

Leptolaena sp2 patrimonial value X as defined by MBG<br />

Liparis bulbophylloides rare X ornemental<br />

Liparis hildebrandtiana rare X ornemental<br />

Liparis jumelleana rare X ornemental<br />

Liparis longicaulis rare X ornemental<br />

Liparis sp rare X ornemental<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 70<br />

Key Biodiversity Components Matrix<br />

Biodiversity Component<br />

Significance<br />

Intrinsic, 'non use' Values<br />

Biodiversity Assessment<br />

Irreplaceability<br />

(mark only one)<br />

Global National Local Site Endemic Localized Widespread<br />

Use Values<br />

Socioeconomic Values Cultural Values<br />

Justification<br />

(Insert comments here explaining<br />

data entered in columns A to I)<br />

Species<br />

Ludia madagascariensis rare X<br />

Ludia sp. nov. 1.aff. scolopioides rare X<br />

Ludia sp. nov. 2 rare X<br />

Ludia sp. nov. 3 rare X<br />

Ludwia sp patrimonial value X as defined by MBG<br />

Macaranga racemosa rare X<br />

Mailardia sp patrimonial value X as defined by MBG<br />

Margaritaria sp. nov. A rare X<br />

Medinilla cf. oblongifolia rare X<br />

Medinilla chermezonii rare X<br />

Medinilla lophoclada rare X<br />

Medinilla mandrakensis rare X<br />

Medinilla micrantha rare X<br />

Medinilla sp nov 2. rare X<br />

Medinilla sp. nov. 1 rare X<br />

Meineckia orientalis rare X<br />

Melicope discolor rare X<br />

Melicope sp. nov. rare X<br />

Memecylon faucherei rare X<br />

Memecylon sp. nov. aff. vaccinioides rare X<br />

Mendoncia sp. nov. 1 rare X<br />

Microcoelia gilpinae rare X ornemental<br />

Microcoelia macrantha rare X ornemental<br />

Molinaea sp. nov rare X<br />

Morinda retusa rare X<br />

Morinda sp. nov. rare X<br />

Mussaenda arcuata rare X<br />

Neobathia sp patrimonial value X as defined by MBG<br />

Nervilia bicarinata rare X ornemental<br />

Noronhia emarginata rare X<br />

Noronhia gracilipes rare X<br />

Noronhia louvelii rare X<br />

Noronhia sp nov. A rare X<br />

Noronhia sp. nov E rare X<br />

Noronhia sp. nov. C rare X<br />

Oberonia disticha rare X ornemental<br />

Ochrocarpos orthocladus rare X<br />

Oeonia oncidiiflora rare X ornemental<br />

Oeonia rosea rare X ornemental<br />

Oeonia volucris rare X ornemental<br />

Oeoniella polystachys rare X ornemental<br />

Olax emirnensis X Magical against bad luck<br />

Oldenlandia lancifolia rare X<br />

Oldenlandia trinervia rare X<br />

Oncostemum cauliflorum rare X<br />

Oncostemum evonymoides rare X<br />

Oncostemum filicinum rare X<br />

Oncostemum humbertianum rare X<br />

Oncostemum laevigatum rare X<br />

Oncostemum linearisepalum rare X<br />

Oncostemum neriifolium rare X<br />

Oncostemum nitidulum rare X<br />

Oncostemum oliganthum rare X<br />

Oncostemum paniculatum rare X<br />

Oncostemum sp nov aff. triflorum rare X<br />

Oncostemum sp. cf. leprosum rare X<br />

Oncostemum sp. nov. D rare X<br />

Oncostemum triflorum rare X<br />

Paederia mandrarensis rare X<br />

Pauridiantha paucinervis rare X<br />

Pellaea sp patrimonial value X as defined by MBG<br />

Peltiera nitida rare X<br />

Pentopetia cotoneaster rare X<br />

Pentopetia longipetala rare X<br />

Pentopetia pinnata rare X<br />

Phaius pulchellus rare X ornemental<br />

Phaius pulcher rare X ornemental<br />

Phylica emirnensis rare X<br />

Phyllanthus moramangicus rare X<br />

Phyllarthron sp patrimonial value X as defined by MBG<br />

Phylloxylum sp patrimonial value X as defined by MBG<br />

Platylepis polyadenia rare X ornemental<br />

Plectrantus sp patrimonial value X as defined by MBG<br />

Podocarpus sp patrimonial value X as defined by MBG<br />

Polyscias sp. nov. 'abrahamiana' rare X<br />

Polyscias sp. nov. 'ambatovyensis' rare X<br />

Polyscias sp. nov. 'anjozorobensis' rare X<br />

Polystachya aurantiaca rare X ornemental<br />

Polystachya concreta rare X ornemental<br />

Polystachya cornigera rare X ornemental<br />

Polystachya cultriformis rare X ornemental<br />

Polystachya fusiformis rare X ornemental<br />

Polystachya humberti rare X ornemental<br />

Polystachya mauritiana rare X ornemental<br />

Polystachya rosea rare X ornemental<br />

Polystachya rosellata rare X ornemental<br />

Polystachya sp. rare X ornemental<br />

Polystachya tsinjoarivensis rare X ornemental<br />

Pseudopteris sp patrimonial value X as defined by MBG<br />

Psorospermum nervosum rare X<br />

Psorospermum sp. nov. A. aff. rienanense rare X<br />

Psorospermum sp. nov. B. rare X<br />

Psychotria sp patrimonial value X as defined by MBG<br />

Psychotria taxifolia rare X<br />

Pycreus ferrugineus rare X<br />

Pyrenacantha humblotii rare X<br />

Pyrenacantha laetevirens rare X<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 71<br />

Key Biodiversity Components Matrix<br />

Biodiversity Component<br />

Significance<br />

Intrinsic, 'non use' Values<br />

Global National Local Site Endemic Localized Widespread<br />

Species<br />

Pyrostria analamazaotrensis rare X<br />

Rhodolaena bakeriana patrimonial value X as defined by MBG<br />

Rhynchospora sp. nov. 1 rare X<br />

Saldinia coursiana rare X<br />

Saldinia mandracensis rare X<br />

Saldinia myrtilloides rare X<br />

Saldinia proboscidea rare X<br />

Saldinia sp patrimonial value X as defined by MBG<br />

Sarcolaena sp patrimonial value X as defined by MBG<br />

Schismatoclada concinna rare X<br />

Schismatoclada psychotrioides rare X<br />

Scleria madagascariensis rare X<br />

Scolopia taimbarina rare X<br />

Scolopia thouvenoti rare X<br />

Secamone glaberrima rare X<br />

Secamone sp. aff. Perrieri rare X<br />

Secamone sp. nov. 1 rare X<br />

Selaginella lyalii patrimonial value X as defined by MBG<br />

Senecio vel. sp. aff. multidenticulatus rare X<br />

Stenandrium amoenum rare X<br />

Syzigium sp. 1 rare X<br />

Syzigium sp. 2 rare X<br />

Syzigium sp. 3 rare X<br />

Syzygium bernieri rare X<br />

Syzygium condensatum rare X<br />

Syzygium emirnense rare X<br />

Syzygium lugubre rare X<br />

Syzygium onivense rare X<br />

Syzygium parkeri rare X<br />

Tacca sp patrimonial value X as defined by MBG<br />

Tambourissa capuronii rare X<br />

Tambourissa sp nov. aff. mandrarensis rare X<br />

Tambourissa sp. nov. A rare X<br />

Tambourissa trichophylla rare X<br />

Tarenna alleizettei rare X<br />

Tarenna sp. nov. aff spiranthera rare X<br />

Terminalia sp patrimonial value X as defined by MBG<br />

Terminalia sp patrimonial value X as defined by MBG<br />

Tragia perrieri rare X<br />

Tricalysia sp. ined. 'analamazaotrensis' rare X<br />

Tristellateia grandiflora rare X<br />

Vepris sp1 patrimonial value X as defined by MBG<br />

Vepris sp2 patrimonial value X as defined by MBG<br />

Vigueranthus sp_ patrimonial value X as defined by MBG<br />

Viguieranthus sp. X Magical sorcellery<br />

Viscum multicostatum rare X<br />

Viscum radula rare X<br />

Viscum sp. Nov. 1 rare X<br />

Viscum sp. Nov. 2 rare X<br />

Vitex coursii rare X<br />

Vitex oscitans rare X<br />

Xylopia sp patrimonial value X as defined by MBG<br />

Communities/Habitats<br />

Azonal thicket X X medecinal, bushmeat<br />

Disturbed azonal thicket X X medecinal, bushmeat<br />

Azonal forest X X medecinal, bushmeat<br />

Disturbed azonal forest X X medecinal, bushmeat<br />

Brunt azonal forest X<br />

Disturbed azonal habitat (sucessions I and II) X X<br />

Disturbed azonal habitat (sparse vegetation) X<br />

Transitional forest of azonal influence on gabbro sustratum X X timbers, medecinal, bushmeat, water ressources<br />

Distrubed transitional forest of azonal influence on gabbro sustratum X X timbers, medecinal, bushmeat, water ressources<br />

Transitional forest X X timbers, medecinal, bushmeat, water ressources<br />

Exploited transitional forest X X timbers, medecinal, bushmeat, water ressources<br />

Moderately exploited zonal forest X X X timbers, medecinal, bushmeat, water ressources<br />

Moderately exploited zonal gallery forest X X X timbers, medecinal, bushmeat, water ressources<br />

Heavily exploited zonal forest (with other disturbances), mine and pipeline timber, medecinal, bushmeat<br />

Ephemeral ponds X X<br />

Biodiversity Assessment<br />

Irreplaceability<br />

(mark only one)<br />

Streams X X water resources<br />

Use Values<br />

Socioeconomic Values Cultural Values<br />

Whole Landscapes/Ecosystems<br />

Edaphic mid-altitudinal eastern humid forest on laterite profil above ultramafic X outcrop<br />

X timbers, medecinal, bushmeat, water ressources<br />

Justification<br />

(Insert comments here explaining<br />

data entered in columns A to I)<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 72<br />

Key to Global Significance Criteria<br />

Further detailed information is available at http://www.iucnredlist.org/info/categories_criteria2001.<br />

EXTINCT (EX)<br />

A taxon is Extinct when there is no reasonable doubt that the last individual has died. A taxon is presumed<br />

Extinct when exhaustive surveys in known and/or expected habitat, at appropriate times (diurnal, seasonal,<br />

annual), throughout its historic range have failed to record an individual. Surveys should be over a time frame<br />

appropriate to the taxon's life cycle and life form.<br />

EXTINCT IN THE WILD (EW)<br />

A taxon is Extinct in the Wild when it is known only to survive in cultivation, in captivity or as a naturalized<br />

population (or populations) well outside the past range. A taxon is presumed Extinct in the Wild when<br />

exhaustive surveys in known and/or expected habitat, at appropriate times (diurnal, seasonal, annual),<br />

throughout its historic range have failed to record an individual. Surveys should be over a time frame<br />

appropriate to the taxon's life cycle and life form.<br />

CRITICALLY ENDANGERED (CR)<br />

A taxon is Critically Endangered when the best available evidence indicates that it meets any of the criteria A<br />

to E for Critically Endangered (see Section V), and it is therefore considered to be facing an extremely high<br />

risk of extinction in the wild.<br />

ENDANGERED (EN)<br />

A taxon is Endangered when the best available evidence indicates that it meets any of the criteria A to E for<br />

Endangered (see Section V), and it is therefore considered to be facing a very high risk of extinction in the<br />

wild.<br />

VULNERABLE (VU)<br />

A taxon is Vulnerable when the best available evidence indicates that it meets any of the criteria A to E for<br />

Vulnerable (see Section V), and it is therefore considered to be facing a high risk of extinction in the wild.<br />

NEAR THREATENED (NT)<br />

A taxon is Near Threatened when it has been evaluated against the criteria but does not qualify for Critically<br />

Endangered, Endangered or Vulnerable now, but is close to qualifying for or is likely to qualify for a threatened<br />

category in the near future.<br />

LEAST CONCERN (LC)<br />

A taxon is Least Concern when it has been evaluated against the criteria and does not qualify for Critically<br />

Endangered, Endangered, Vulnerable or Near Threatened. Widespread and abundant taxa are included in<br />

this category.<br />

DATA DEFICIENT (DD)<br />

A taxon is Data Deficient when there is inadequate information to make a direct, or indirect, assessment of its<br />

risk of extinction based on its distribution and/or population status. A taxon in this category may be well<br />

studied, and its biology well known, but appropriate data on abundance and/or distribution are lacking. Data<br />

Deficient is therefore not a category of threat. Listing of taxa in this category indicates that more information is<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 73<br />

required and acknowledges the possibility that future research will show that threatened classification is<br />

appropriate. It is important to make positive use of whatever data are available. In many cases great care<br />

should be exercised in choosing between DD and a threatened status. If the range of a taxon is suspected to<br />

be relatively circumscribed, and a considerable period of time has elapsed since the last record of the taxon,<br />

threatened status may well be justified.<br />

NOT EVALUATED (NE)<br />

A taxon is Not Evaluated when it is has not yet been evaluated against the criteria.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 74<br />

CALCULATING BIODIVERSITY LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat Hectares)<br />

Attribute<br />

Steams<br />

Number of tree<br />

species<br />

Canopy height<br />

1. To the left, label each pre-project site condition class found.<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

BENCHMARK<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Basal area 19.6 m2/ha<br />

Dbh<br />

Propithecus<br />

diadema density<br />

Allocebus density 0.025 number/h<br />

a<br />

Indri indri density 0.013 number/h<br />

a<br />

Weight<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Habitat Type 1:<br />

Azonal thicket<br />

… of Condition …of Condition Class …of Condition<br />

Class 1:<br />

Quasi pristine<br />

2:<br />

Disturbed primary<br />

Class 3:<br />

primary forest<br />

forest<br />

590.74 475.55<br />

0<br />

528.86 427.22<br />

0<br />

61.88<br />

48.33 0<br />

0 0 0<br />

Total Habitat<br />

Hectares Lost:<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in<br />

question…<br />

Condition Class 1: Condition Class 2: Condition Class 3:<br />

Quasi pristine Disturbed primary<br />

0<br />

Rationale<br />

Trad'ble/<br />

Pre/Post-<strong>Project</strong> Conditions primary forest<br />

forest<br />

Habitat<br />

(enter comments explaining data in columns<br />

Non?<br />

Condition/ Net Condition/ Net Condition/ Net Hectares Lost<br />

B to Q)<br />

(T/NT)<br />

Level Loss Level Loss Level Loss<br />

1015<br />

stems<br />

number/h<br />

a<br />

0.15 NT<br />

Pre-<strong>Project</strong><br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

Post-<strong>Project</strong>, Low Impact Sites<br />

911<br />

0<br />

911<br />

911<br />

0<br />

0<br />

285<br />

0<br />

285<br />

285<br />

0<br />

0<br />

0<br />

0<br />

0<br />

89.19445714<br />

41<br />

Tree<br />

species/h<br />

a<br />

0.2 NT<br />

Pre-<strong>Project</strong><br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

Post-<strong>Project</strong>, Low Impact Sites<br />

43<br />

0<br />

43<br />

43<br />

0<br />

0<br />

18<br />

0<br />

18<br />

18<br />

0<br />

0<br />

0<br />

0<br />

0<br />

148.4436098<br />

Pre-<strong>Project</strong> 8.98 5.45<br />

11.5 Meter 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

8.98<br />

8.98<br />

0<br />

0<br />

5.45<br />

5.45<br />

0<br />

0<br />

0<br />

30.77179043<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 19.42 3.55<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

19.42<br />

19.42<br />

0<br />

0<br />

3.55<br />

3.55<br />

0<br />

0<br />

0<br />

30.06911276<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 13.29 9.95<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

13.29<br />

13.29<br />

0<br />

0<br />

9.95<br />

9.95<br />

0<br />

0<br />

0<br />

57.90240452<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 0.033 0<br />

0.033 0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0.033<br />

0.033<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

105.772<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 0.0248 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0.0248<br />

0.0248<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

52.886<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 0.013 0<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0.013<br />

0.013<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

number/h<br />

9.74 cm<br />

a<br />

0.2 NT<br />

104.9645802<br />

620.00<br />

No mitigation Year _0<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 75<br />

LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat Hectares)<br />

Attribute<br />

Stems<br />

Number of Tree species<br />

Canopy height<br />

BENCHMARK<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Basal area 24.87 m2/ha<br />

Dbh<br />

Propithecus diadema<br />

density<br />

1. To the left, label each pre-project site condition class found.<br />

8.55<br />

7.65 cm<br />

0.033 number/h<br />

a<br />

Allocebus density 0.0248 number/h<br />

a<br />

Indri indri density 0.0131 number/h<br />

a<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

1273<br />

138<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

stems/ha<br />

Tree<br />

species/h<br />

a<br />

m<br />

Weight<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

… of Condition Class 1:<br />

Quasi pristine primary<br />

forest<br />

forest<br />

Condition/<br />

Level<br />

Net<br />

Loss<br />

…of Condition Class 2:<br />

Disturbed primary<br />

forest<br />

126.37 328.22<br />

Condition Class 1:<br />

Quasi pristine primary<br />

forest<br />

Condition/<br />

Level<br />

Net<br />

Loss<br />

Condition/<br />

Level<br />

Pre-<strong>Project</strong> 1045 880<br />

0.15 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 1045<br />

1045<br />

0 880<br />

880<br />

0<br />

0<br />

0<br />

29.6630597<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 138 55<br />

0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 138<br />

138<br />

0 55<br />

55<br />

0<br />

0<br />

0<br />

28.42585507<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 8.48 10.1<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 8.48<br />

8.48<br />

0 10.1<br />

10.1<br />

0<br />

0<br />

0<br />

15.79959298<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 23.88 17.2<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 23.88<br />

23.88<br />

0 17.2<br />

17.2<br />

0<br />

0<br />

0<br />

10.26298834<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 12.26 9.18<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 12.26<br />

12.26<br />

0 9.18<br />

9.18<br />

0<br />

0<br />

0<br />

17.63817778<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 0.033 0.033<br />

0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 0.033<br />

0.033<br />

0 0.033<br />

0.033<br />

0<br />

0<br />

0<br />

55.212<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 0.0248 0.0248<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 0.0248<br />

0.0248<br />

0 0.0248<br />

0.0248<br />

0<br />

0<br />

0<br />

27.606<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 0.013 0.013<br />

0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 0.013<br />

0.013<br />

0 0.013<br />

0.013<br />

0<br />

0<br />

0<br />

54.79053435<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

105.54<br />

Condition Class 2:<br />

Disturbed primary<br />

[Fill in name here]<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in question…<br />

Pre/Post-<strong>Project</strong> Conditions<br />

72.99<br />

Habitat Type 2:<br />

53.38 222.68<br />

Transitional <strong>Forest</strong>s<br />

…of Condition Class 3:<br />

Condition Class 3:<br />

[Fill in name here]<br />

Net<br />

Loss<br />

Habitat<br />

Hectares Lost<br />

Total Habitat Hectares Lost: 239<br />

Rationale<br />

(enter comments explaining data in columns B to Q)<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 76<br />

LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat Hectares)<br />

Attribute<br />

Stems<br />

Number of tree species<br />

Canopy height<br />

1. To the left, label each pre-project site condition class found.<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

BENCHMARK<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Basal area 22 m2/ha<br />

Dbh<br />

Propithecus diadema<br />

density<br />

Allocebus density 0.0248 number/h<br />

a<br />

Indri indri density 0.0131 number/h<br />

a<br />

Weight<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Habitat Type 3:<br />

Zonal <strong>Forest</strong>s<br />

… of Condition Class 1: …of Condition Class 2:<br />

Quasi pristine primary Disturbed primary<br />

forest<br />

forest<br />

…of Condition Class 3:<br />

[Fill in name here]<br />

412.74 124.97<br />

256.9 14.94<br />

155.84<br />

110.03<br />

Total Habitat Hectares Lost: 305.13<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in question…<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

Condition Class 1:<br />

Quasi pristine primary<br />

forest<br />

Condition/ Net<br />

Level Loss<br />

Condition Class 2:<br />

Disturbed primary<br />

forest<br />

Condition/ Net<br />

Level Loss<br />

Condition Class 3:<br />

[Fill in name here]<br />

Condition/ Net<br />

Level Loss<br />

Habitat<br />

Hectares Lost<br />

Rationale<br />

(enter comments explaining data in columns B to Q)<br />

1065<br />

Stem<br />

number/h<br />

a<br />

0.15 NT<br />

Pre-<strong>Project</strong><br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

Post-<strong>Project</strong>, Low Impact Sites<br />

1207<br />

1207<br />

1207<br />

0<br />

1207<br />

970<br />

970<br />

970<br />

0<br />

970<br />

0<br />

0<br />

0<br />

45.71409859<br />

72<br />

Tree<br />

species/h<br />

a<br />

0.2 NT<br />

Pre-<strong>Project</strong><br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

Post-<strong>Project</strong>, Low Impact Sites<br />

107<br />

107<br />

107<br />

0<br />

107<br />

30<br />

30<br />

30<br />

0<br />

30<br />

0<br />

0<br />

0<br />

77.60138889<br />

Pre-<strong>Project</strong> 10.5 12.65<br />

9.9 meter 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 10.5<br />

10.5<br />

0 12.65<br />

12.65<br />

0<br />

0<br />

0<br />

14.57798485<br />

Post-<strong>Project</strong>, Low Impact Sites 10.5 12.65 0<br />

Pre-<strong>Project</strong> 33.3 21.65<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 33.3<br />

33.3<br />

0 21.65<br />

21.65<br />

0<br />

0<br />

0<br />

20.177775<br />

Post-<strong>Project</strong>, Low Impact Sites 33.3 21.65 0<br />

Pre-<strong>Project</strong> 13.77 15.44<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 13.37<br />

13.77<br />

0.4 15.44<br />

15.44<br />

0<br />

0<br />

0<br />

12.84548156<br />

Post-<strong>Project</strong>, Low Impact Sites 13.77 15.44 0<br />

Pre-<strong>Project</strong> 0.033 0.033<br />

0.033 0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 0.033<br />

0.033<br />

0 0.033<br />

0.033<br />

0<br />

0<br />

0<br />

54.368<br />

Post-<strong>Project</strong>, Low Impact Sites 0.033 0.033 0<br />

Pre-<strong>Project</strong> 0.025 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 0.025<br />

0.025<br />

0 0<br />

0<br />

0<br />

0<br />

0<br />

25.89717742<br />

Post-<strong>Project</strong>, Low Impact Sites 0.025 0 0<br />

Pre-<strong>Project</strong> 0.013 0.013<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites 0.013<br />

0.013<br />

0 0.013<br />

0.013<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.013 0.013 0<br />

number/h<br />

14.91 cm<br />

a<br />

0.2 NT<br />

53.9529771<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 1: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, December 2008 Iteration 77<br />

LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat Hectares)<br />

Attribute<br />

Stems<br />

Number of tree species<br />

Canopy height<br />

Volume 34.17 m3/ha<br />

Dbh<br />

Propithecus diadema<br />

density<br />

1. To the left, label each pre-project site condition class found.<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

9.9<br />

14.91 cm<br />

0.033 number/h<br />

a<br />

Allocebus density 0.0248 number/h<br />

a<br />

Indri indri density 0.0131 number/h<br />

a<br />

Weight<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

BENCHMARK<br />

Condition Class 1:<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

0<br />

Condition/<br />

Level<br />

Net<br />

Loss<br />

1065<br />

72<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

Stems/ha<br />

Tree<br />

species/5<br />

00m2<br />

m<br />

Habitat Type 4:<br />

… of Condition Class 1: …of Condition Class 2: …of Condition Class 3:<br />

Heavily fragmented and<br />

degraded primary forest<br />

71.04<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in question…<br />

Condition Class 2:<br />

0<br />

Condition/<br />

Level<br />

Pipeline degraded zonal forests<br />

Net<br />

Loss<br />

Condition/<br />

Level<br />

Pre-<strong>Project</strong> 104<br />

0.15 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0<br />

0<br />

0 104<br />

104<br />

0<br />

0.241690141<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 104<br />

Pre-<strong>Project</strong> 45<br />

0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0<br />

0<br />

0 45<br />

45<br />

0<br />

2.0625<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 45<br />

Pre-<strong>Project</strong> 4.139<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0<br />

0<br />

0 4.139<br />

4.139<br />

0<br />

0.344916667<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 4.139<br />

Pre-<strong>Project</strong> 14.502<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0<br />

0<br />

0 14.502<br />

14.502<br />

0<br />

0.350136084<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 14.502<br />

Pre-<strong>Project</strong> 14.978<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0<br />

0<br />

0 14.978<br />

14.978<br />

0<br />

0.828762575<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 14.978<br />

Pre-<strong>Project</strong> 0<br />

0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0<br />

0<br />

0 0<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0<br />

0<br />

0 0<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

Pre-<strong>Project</strong> 0<br />

0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0<br />

0<br />

0<br />

0 0<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0 0 0<br />

16.5<br />

4.95<br />

Condition Class 3:<br />

Heavily fragmented and<br />

degraded primary forest<br />

Net<br />

Loss<br />

Habitat<br />

Hectares Lost<br />

Total Habitat Hectares Lost: 3.83<br />

Rationale<br />

(enter comments explaining data in columns B to Q)<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 2: Key Biodiversity Components Matrix (KBCM) and<br />

Habitat Hectares Score, February 2008 Iteration<br />

Key Biodiversity Components Matrix<br />

Biodiversity Component<br />

Biodiversity Assessment<br />

Intrinsic, 'non use' Values<br />

Irreplaceability<br />

Significance<br />

(mark only one)<br />

Global National Local Site Endemic Localized Widespread<br />

Socioeconomic<br />

Values<br />

Use Values<br />

Cultural Values<br />

Justification<br />

(Insert comments here explaining data entered in columns<br />

A to I)<br />

Species<br />

Prolemur simus CR X Ecotourism, bush meat Ecological services: main seeds disperseurs<br />

Propithecus d. diadema CR X Ecotourism, bush meat Tabou Existence of illegal bush meat for all these lemur species<br />

Indri indri EN X Ecotourism, bush meat Tabou<br />

Allocebus trichotis EN X Ecotourism, bush meat<br />

Daubentonia madagascarensis EN X Ecotourism, bush meat Tabou<br />

Tyto soumagnei EN X Ecotourism<br />

Platypelis sp. nov X X Rational exportation<br />

There's annual quota for those species under CITES<br />

exporation. However, there are lacks of study on<br />

population density<br />

Scaphiophryne marmorata VU X Rational exportation<br />

Rhombophryne coronata VU X Rational exportation<br />

Mantella aurantiaca CR X Rational exportation<br />

Mantella crocea EN X Rational exportation<br />

Mantidactylus plicifer NT X Rational exportation<br />

Pararhadinaea sp.nov X X Rational exportation<br />

Sanzinia madagascariensis VU X Rational exportation, bush meat<br />

Aloe leandri X X<br />

Ratsirakia sp X X Bush meat<br />

Rheocles sp X X Bush meat<br />

Asteropeia micraster EN<br />

Leptolaena multiflora EN<br />

Dalbergia baroni VU<br />

Cyathea dregei NE Cites II<br />

Cyathea cf tsaratananensis NE Cites II<br />

Eulemur rubriventer<br />

Communities/Habitats<br />

VU X Bush meat<br />

Azonal forest X X medecinal, bushmeet,<br />

Transitional forest X X timbers, medecinal, bushmeet, water ressources<br />

Zonal forest X timbers, X medecinal, bushmeet, water ressources<br />

Azonal fauna X X<br />

Azonal flora<br />

Whole Landscapes/Ecosystems<br />

X X<br />

Edaphic mid-altitudinal eastern humid forest on Xlaterite profil above ultramafic outcrop X forest & water ressources<br />

For ‘Key to Global Significance Criteria’ see Appendix 1 above.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

78


Appendix 2: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, February 2008 Iteration 79<br />

CALCULATING BIODIVERSITY LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat<br />

Hectares)<br />

1. To the left, label each pre-project site condition class found.<br />

Attribute<br />

Steams<br />

Number of tree<br />

species<br />

Canopy height<br />

variation<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

Basal area 5.45 m2/ha<br />

Dbh<br />

Height to crown 6.13 m3<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Habitat Type 1:<br />

Azonal forest<br />

…of Condition<br />

Class 3:<br />

Ponds<br />

793.02 549.17<br />

0<br />

615 447.04<br />

0<br />

0<br />

0 0<br />

Pre-<strong>Project</strong> 739 263<br />

586 steam/ha 0.2 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

739<br />

739<br />

0 263<br />

263<br />

0<br />

0<br />

195.2411331<br />

Post-<strong>Project</strong>, Low Impact Sites 739 263 0<br />

41<br />

Tree<br />

species/5<br />

00m2<br />

0.25 NT<br />

Pre-<strong>Project</strong><br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

Post-<strong>Project</strong>, Low Impact Sites<br />

58<br />

0 58<br />

58<br />

58<br />

15<br />

15<br />

15<br />

15<br />

0<br />

0<br />

0<br />

258.3878049<br />

Pre-<strong>Project</strong> 4.43 2.02<br />

9.54 Meter 0.15 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0 4.43<br />

4.43<br />

2.02<br />

2.02<br />

0<br />

0<br />

57.0357044<br />

Post-<strong>Project</strong>, Low Impact Sites 4.43 2.02 0<br />

Pre-<strong>Project</strong> 7.07 1.18<br />

0.15 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0 7.07<br />

7.07<br />

1.18<br />

1.18<br />

0<br />

0<br />

134.1896477<br />

Post-<strong>Project</strong>, Low Impact Sites 7.07 1.18 0<br />

Pre-<strong>Project</strong> 9.64 7.26<br />

9.74 m 0.15 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0 9.64<br />

9.64<br />

7.26<br />

7.26<br />

0<br />

0<br />

141.2850678<br />

Post-<strong>Project</strong>, Low Impact Sites 9.64 7.26 0<br />

Pre-<strong>Project</strong> 4.98 3.13<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0 4.98<br />

4.98<br />

3.13<br />

3.13<br />

0<br />

0<br />

72.78850245<br />

Post-<strong>Project</strong>, Low Impact Sites 4.98 3.13 0<br />

Total Habitat<br />

Hectares Lost:<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in<br />

question…<br />

BENCHMARK<br />

Condition Class 1: Condition Class 2: Condition Class 3:<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

Good forest<br />

Condition/ Net<br />

Level Loss<br />

Disturbed<br />

Condition/ Net<br />

Level Loss<br />

Ponds<br />

Condition/ Net<br />

Level Loss<br />

Habitat<br />

Hectares Lost<br />

Rationale<br />

(enter comments explaining data in<br />

columns B to Q)<br />

Weight<br />

… of Condition<br />

Class 1:<br />

…of Condition Class<br />

2:<br />

Good forest Disturbed<br />

0 0 0<br />

859<br />

Good: P.5; Disturbed: P. 20<br />

after 30 years estimated<br />

approximately about 40% to 60% of<br />

the structure attribute value will be<br />

restored on the impact site<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 3: Key Biodiversity Components<br />

Matrix (KBCM) and Habitat Hectares Score,<br />

April 2008 Iteration<br />

BIODIVERSITY LOSS calculations scenarios at IMPACT SITE, and post-<strong>Project</strong> remediation effects on biodiversity<br />

loss calculations scenarios at impact site, <strong>Ambatovy</strong> <strong>Project</strong><br />

Percentage of<br />

attributes<br />

rehabilitation<br />

0%<br />

Year<br />

0 (without<br />

mitigation)<br />

Habitat types<br />

<strong>Forest</strong> Streams/Rivers Ephemeral pools<br />

1620 1.16 0.64<br />

5% 0-7 1539 1.1 0.61<br />

20% 7-15 1296 0.93 0.51<br />

40% 15-30 972 0.69 0.38<br />

75% 30-60 405 0.29 0.16<br />

90% 60-120 162 0.12 0.06<br />

Detailed calculations can be found below.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

80


Appendix 3: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, April 2008 Iteration 81<br />

Habitat hectares lost <strong>–</strong> no mitigation<br />

CALCULATING BIODIVERSITY LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat<br />

Hectares)<br />

1. To the left, label each pre-project site condition class found.<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

Attribute<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Habitat Type 1:<br />

Pre-<strong>Project</strong> 1004.75 735.57<br />

Stems 1118 stems/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

1004.8<br />

1004.8<br />

0 735.57<br />

735.57<br />

0<br />

0<br />

175.4906165<br />

Post-<strong>Project</strong>, Low Impact Sites 1004.8 735.57 0<br />

Pre-<strong>Project</strong> 23.22 14.57<br />

Basal area 22.16<br />

Square<br />

meters/ha<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0 23.22<br />

23.22<br />

14.57<br />

14.57<br />

0<br />

0<br />

99.55773885<br />

Post-<strong>Project</strong>, Low Impact Sites 23.22 14.57 0<br />

Pre-<strong>Project</strong> 9.07 9.5<br />

Mean tree height<br />

canopy<br />

9.98 Meter 0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0 9.07<br />

9.07<br />

9.5<br />

9.5<br />

0<br />

0<br />

47.92328259<br />

Post-<strong>Project</strong>, Low Impact Sites 9.07 9.5 0<br />

Pre-<strong>Project</strong> 13.57 15.17<br />

Top height tree 14.54 Meter 0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0 13.57<br />

13.57<br />

15.17<br />

15.17<br />

0<br />

0<br />

50.03226773<br />

Post-<strong>Project</strong>, Low Impact Sites 13.57 15.17 0<br />

Pre-<strong>Project</strong> 85.08 36.86<br />

Tree species density 83.63 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0 85.08<br />

85.08<br />

36.86<br />

36.86<br />

0<br />

0<br />

183.4857277<br />

Post-<strong>Project</strong>, Low Impact Sites 85.08 36.86 0<br />

Pre-<strong>Project</strong> 0.033 0<br />

Propithecus<br />

diadema Density<br />

0.033<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.033<br />

0.033<br />

0<br />

0<br />

0<br />

0<br />

158.71055<br />

Post-<strong>Project</strong>, Low Impact Sites 0.033 0 0<br />

Propithecus<br />

diadema<br />

vulnerability index<br />

123.3 0 0.05 NT<br />

Pre-<strong>Project</strong><br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

Post-<strong>Project</strong>, Low Impact Sites<br />

123.3<br />

123.3<br />

123.3<br />

123.3<br />

123.3<br />

123.3<br />

123.3<br />

123.3<br />

0<br />

0<br />

0<br />

104.3221485<br />

Pre-<strong>Project</strong> 0.025 0<br />

Allocebus trichotis<br />

density<br />

0.025 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.025<br />

0.025<br />

0<br />

0<br />

0<br />

0<br />

160.3136869<br />

Post-<strong>Project</strong>, Low Impact Sites 0.025 0 0<br />

Pre-<strong>Project</strong> 142.4 142.4<br />

Allocebus trichotis<br />

vulnerability index<br />

142.4 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

142.4<br />

142.4<br />

142.4<br />

142.4<br />

0<br />

0<br />

104.2548391<br />

Post-<strong>Project</strong>, Low Impact Sites 142.4 142.4 0<br />

Pre-<strong>Project</strong> 0.007 0<br />

Prolemur simus<br />

density<br />

0.007 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.007<br />

0.007<br />

0<br />

0<br />

0<br />

0<br />

169.8818697<br />

Post-<strong>Project</strong>, Low Impact Sites 0.007 0 0<br />

Pre-<strong>Project</strong> 4.13 4.13<br />

Prolemur simus<br />

vulnerability index<br />

4.13 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

4.13<br />

4.13<br />

4.13<br />

4.13<br />

0<br />

0<br />

104.2894121<br />

Post-<strong>Project</strong>, Low Impact Sites 4.13 4.13 0<br />

Pre-<strong>Project</strong> 0.013 0<br />

Indri indri density 0.013 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.013<br />

0.013<br />

0<br />

0<br />

0<br />

0<br />

157.7474504<br />

Post-<strong>Project</strong>, Low Impact Sites 0.013 0 0<br />

Pre-<strong>Project</strong> 31.12 31.12<br />

Indri indri<br />

vulnerability index<br />

31.12 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

31.12<br />

31.12<br />

31.12<br />

31.12<br />

0<br />

0<br />

104.275906<br />

Post-<strong>Project</strong>, Low Impact Sites 31.12 31.12 0<br />

Pre-<strong>Project</strong> 0.8 14.05<br />

Deforestation rate 0<br />

Percentag<br />

e<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.8<br />

0.8<br />

14.05<br />

14.05<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.8 14.05 0<br />

<strong>Forest</strong><br />

…of Condition<br />

Class 3:<br />

Ponds<br />

1587.963 497.7<br />

0<br />

1587.963 497.7<br />

0<br />

0<br />

0 0<br />

Total Habitat<br />

Hectares Lost:<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in<br />

question…<br />

BENCHMARK<br />

Condition Class 1: Condition Class 2: Condition Class 3:<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

Good forest<br />

Condition/ Net<br />

Level Loss<br />

Disturbed<br />

Condition/ Net<br />

Level Loss<br />

Ponds<br />

Condition/ Net<br />

Level Loss<br />

Habitat<br />

Hectares Lost<br />

Rationale<br />

(enter comments explaining data in<br />

columns B to Q)<br />

Weight<br />

… of Condition<br />

Class 1:<br />

…of Condition Class<br />

2:<br />

Good forest Disturbed<br />

0 0 0<br />

1620<br />

Good forest is the average of : P.5,<br />

6, 9, 12, 14, & 18; Disturbed forest<br />

average of : P. 10 &20<br />

No mitigation Year _0<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 3: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, April 2008 Iteration 82<br />

Habitat hectares lost <strong>–</strong> 5% mitigation<br />

CALCULATING BIODIVERSITY LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat<br />

Hectares)<br />

1. To the left, label each pre-project site condition class found.<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

Attribute<br />

Stems<br />

Basal area<br />

Mean tree height<br />

canopy<br />

Top height tree 14.54 Meter<br />

Tree species density 83.63 number/ha<br />

Propithecus<br />

diadema Density<br />

Propithecus<br />

diadema<br />

vulnerability index<br />

Allocebus trichotis<br />

density<br />

Allocebus trichotis<br />

vulnerability index<br />

Prolemur simus<br />

density<br />

Prolemur simus<br />

vulnerability index<br />

Deforestation rate 0<br />

31.12 0 0.05<br />

Percentag<br />

e<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Condition/<br />

Level<br />

Pre-<strong>Project</strong> 1004.75 735.57<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

50.2375 954.51<br />

1004.8<br />

36.7785 698.79<br />

735.57<br />

0<br />

0<br />

166.7160857<br />

Post-<strong>Project</strong>, Low Impact Sites 1004.8 735.57 0<br />

Pre-<strong>Project</strong> 23.22 14.57<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

1.161 22.059<br />

23.22<br />

0.7285 13.842<br />

14.57<br />

0<br />

0<br />

94.57985191<br />

Post-<strong>Project</strong>, Low Impact Sites 23.22 14.57 0<br />

Pre-<strong>Project</strong> 9.07 9.5<br />

0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.4535 8.6165<br />

9.07<br />

0.475 9.025<br />

9.5<br />

0<br />

0<br />

45.52711846<br />

Post-<strong>Project</strong>, Low Impact Sites 9.07 9.5 0<br />

Pre-<strong>Project</strong> 13.57 15.17<br />

0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.6785 12.892<br />

13.57<br />

0.7585 14.412<br />

15.17<br />

0<br />

0<br />

47.53065434<br />

Post-<strong>Project</strong>, Low Impact Sites 13.57 15.17 0<br />

Pre-<strong>Project</strong> 85.08 36.86<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

4.254 80.826<br />

85.08<br />

1.843 35.017<br />

36.86<br />

0<br />

0<br />

174.3114413<br />

Post-<strong>Project</strong>, Low Impact Sites 85.08 36.86 0<br />

Pre-<strong>Project</strong> 0.033 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.00165 0.0314<br />

0.033<br />

0 0<br />

0<br />

0<br />

0<br />

150.7750225<br />

Post-<strong>Project</strong>, Low Impact Sites 0.033 0 0<br />

Pre-<strong>Project</strong> 123.3 123.3<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

6.165 117.14<br />

123.3<br />

6.165 117.14<br />

123.3<br />

0<br />

0<br />

99.10604103<br />

Post-<strong>Project</strong>, Low Impact Sites 123.3 123.3 0<br />

Pre-<strong>Project</strong> 0.025 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.00125 0.0238<br />

0.025<br />

0 0<br />

0<br />

0<br />

0<br />

152.2980025<br />

Post-<strong>Project</strong>, Low Impact Sites 0.025 0 0<br />

Pre-<strong>Project</strong> 142.4 142.4<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

7.12 135.28<br />

142.4<br />

7.12 135.28<br />

142.4<br />

0<br />

0<br />

99.04209716<br />

Post-<strong>Project</strong>, Low Impact Sites 142.4 142.4 0<br />

Pre-<strong>Project</strong> 0.007 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.00035 0.0067<br />

0.007<br />

0 0<br />

0<br />

0<br />

0<br />

161.3877762<br />

Post-<strong>Project</strong>, Low Impact Sites 0.007 0 0<br />

Pre-<strong>Project</strong> 4.13 4.13<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.2065 3.9235<br />

4.13<br />

0.2065 3.9235<br />

4.13<br />

0<br />

0<br />

99.07494151<br />

Post-<strong>Project</strong>, Low Impact Sites 4.13 4.13 0<br />

Pre-<strong>Project</strong> 0.013 0<br />

NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.00065 0.0124<br />

0.013<br />

0 0<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.013 0 0<br />

Pre-<strong>Project</strong> 31.12 31.12<br />

NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

1.556 29.564<br />

31.12<br />

1.556 29.564<br />

31.12<br />

0<br />

0<br />

99.06211074<br />

Post-<strong>Project</strong>, Low Impact Sites 31.12 31.12 0<br />

Pre-<strong>Project</strong> 0.8 14.05<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.04 0.76<br />

0.8<br />

0.7025 13.348<br />

14.05<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.8 14.05 0<br />

Indri indri density 0.013 number/ha 0.1 149.8600779<br />

Indri indri<br />

vulnerability index<br />

1118<br />

22.16<br />

9.98<br />

0.033<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

stems/ha<br />

Square<br />

meters/ha<br />

Meter<br />

123.3 0 0.05 NT<br />

0.025 number/ha<br />

142.4 0<br />

0.007 number/ha<br />

4.13 0<br />

Weight<br />

… of Condition<br />

Class 1:<br />

Good forest<br />

…of Condition Class<br />

2:<br />

Disturbed<br />

1587.963 497.7<br />

1587.963 497.7<br />

…of Condition<br />

Class 3:<br />

Ponds<br />

0 0 0<br />

BENCHMARK<br />

Condition Class 1: Condition Class 2:<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

Good forest<br />

Condition/ Net<br />

Level Loss<br />

Disturbed<br />

Condition/ Net<br />

Level Loss<br />

0<br />

Habitat Type 1:<br />

<strong>Forest</strong><br />

0<br />

0 0<br />

Condition Class 3:<br />

Ponds<br />

Net<br />

Loss<br />

Total Habitat<br />

Hectares Lost:<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in<br />

question…<br />

0<br />

Habitat<br />

Hectares Lost<br />

1539<br />

Rationale<br />

(enter comments explaining data in<br />

columns B to Q)<br />

Good forest is the average of : P.5,<br />

6, 9, 12, 14, & 18; Disturbed forest<br />

average of : P. 10 &20<br />

No mitigation Year _0<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 3: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, April 2008 Iteration 83<br />

Habitat hectares lost <strong>–</strong> 20% mitigation<br />

CALCULATING BIODIVERSITY LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat<br />

Hectares)<br />

1. To the left, label each pre-project site condition class found.<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

Attribute<br />

Stems<br />

Basal area<br />

Mean tree height<br />

canopy<br />

Top height tree 14.54 Meter<br />

Tree species density 83.63 number/ha<br />

Propithecus<br />

diadema Density<br />

Propithecus<br />

diadema<br />

vulnerability index<br />

Allocebus trichotis<br />

density<br />

Allocebus trichotis<br />

vulnerability index<br />

Prolemur simus<br />

density<br />

Prolemur simus<br />

vulnerability index<br />

Deforestation rate 0<br />

31.12 0 0.05<br />

Percentag<br />

e<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Condition/<br />

Level<br />

Pre-<strong>Project</strong> 1004.75 735.57<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

200.95 803.8<br />

1004.8<br />

147.114 588.46<br />

735.57<br />

0<br />

0<br />

140.3924932<br />

Post-<strong>Project</strong>, Low Impact Sites 1004.8 735.57 0<br />

Pre-<strong>Project</strong> 23.22 14.57<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

4.644 18.576<br />

23.22<br />

2.914 11.656<br />

14.57<br />

0<br />

0<br />

79.64619108<br />

Post-<strong>Project</strong>, Low Impact Sites 23.22 14.57 0<br />

Pre-<strong>Project</strong> 9.07 9.5<br />

0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

1.814 7.256<br />

9.07<br />

1.9 7.6<br />

9.5<br />

0<br />

0<br />

38.33862607<br />

Post-<strong>Project</strong>, Low Impact Sites 9.07 9.5 0<br />

Pre-<strong>Project</strong> 13.57 15.17<br />

0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

2.714 10.856<br />

13.57<br />

3.034 12.136<br />

15.17<br />

0<br />

0<br />

40.02581418<br />

Post-<strong>Project</strong>, Low Impact Sites 13.57 15.17 0<br />

Pre-<strong>Project</strong> 85.08 36.86<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

17.016 68.064<br />

85.08<br />

7.372 29.488<br />

36.86<br />

0<br />

0<br />

146.7885821<br />

Post-<strong>Project</strong>, Low Impact Sites 85.08 36.86 0<br />

Pre-<strong>Project</strong> 0.033 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0066 0.0264<br />

0.033<br />

0 0<br />

0<br />

0<br />

0<br />

126.96844<br />

Post-<strong>Project</strong>, Low Impact Sites 0.033 0 0<br />

Pre-<strong>Project</strong> 123.3 123.3<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

24.66 98.64<br />

123.3<br />

24.66 98.64<br />

123.3<br />

0<br />

0<br />

83.45771876<br />

Post-<strong>Project</strong>, Low Impact Sites 123.3 123.3 0<br />

Pre-<strong>Project</strong> 0.025 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.005 0.02<br />

0.025<br />

0 0<br />

0<br />

0<br />

0<br />

128.2509495<br />

Post-<strong>Project</strong>, Low Impact Sites 0.025 0 0<br />

Pre-<strong>Project</strong> 142.4 142.4<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

28.48 113.92<br />

142.4<br />

28.48 113.92<br />

142.4<br />

0<br />

0<br />

83.40387129<br />

Post-<strong>Project</strong>, Low Impact Sites 142.4 142.4 0<br />

Pre-<strong>Project</strong> 0.007 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0014 0.0056<br />

0.007<br />

0 0<br />

0<br />

0<br />

0<br />

135.9054958<br />

Post-<strong>Project</strong>, Low Impact Sites 0.007 0 0<br />

Pre-<strong>Project</strong> 4.13 4.13<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.826 3.304<br />

4.13<br />

0.826 3.304<br />

4.13<br />

0<br />

0<br />

83.43152969<br />

Post-<strong>Project</strong>, Low Impact Sites 4.13 4.13 0<br />

Pre-<strong>Project</strong> 0.013 0<br />

NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0026 0.0104<br />

0.013<br />

0 0<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.013 0 0<br />

Pre-<strong>Project</strong> 31.12 31.12<br />

NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

6.224 24.896<br />

31.12<br />

6.224 24.896<br />

31.12<br />

0<br />

0<br />

83.42072484<br />

Post-<strong>Project</strong>, Low Impact Sites 31.12 31.12 0<br />

Pre-<strong>Project</strong> 0.8 14.05<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.16 0.64<br />

0.8<br />

2.81 11.24<br />

14.05<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.8 14.05 0<br />

Indri indri density 0.013 number/ha 0.1 126.1979604<br />

Indri indri<br />

vulnerability index<br />

1118<br />

22.16<br />

9.98<br />

0.033<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

stems/ha<br />

Square<br />

meters/ha<br />

Meter<br />

123.3 0 0.05 NT<br />

0.025 number/ha<br />

142.4 0<br />

0.007 number/ha<br />

4.13 0<br />

Weight<br />

… of Condition<br />

Class 1:<br />

Good forest<br />

…of Condition Class<br />

2:<br />

Disturbed<br />

1587.963 497.7<br />

1587.963 497.7<br />

…of Condition<br />

Class 3:<br />

Ponds<br />

0 0 0<br />

BENCHMARK<br />

Condition Class 1: Condition Class 2:<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

Good forest<br />

Condition/ Net<br />

Level Loss<br />

Disturbed<br />

Condition/ Net<br />

Level Loss<br />

0<br />

Habitat Type 1:<br />

<strong>Forest</strong><br />

0<br />

0 0<br />

Condition Class 3:<br />

Ponds<br />

Net<br />

Loss<br />

Total Habitat<br />

Hectares Lost:<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in<br />

question…<br />

0<br />

Habitat<br />

Hectares Lost<br />

1296<br />

Rationale<br />

(enter comments explaining data in<br />

columns B to Q)<br />

Good forest is the average of : P.5,<br />

6, 9, 12, 14, & 18; Disturbed forest<br />

average of : P. 10 &20<br />

No mitigation Year _0<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 3: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, April 2008 Iteration 84<br />

Habitat hectares lost <strong>–</strong> 40% mitigation<br />

CALCULATING BIODIVERSITY LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat<br />

Hectares)<br />

1. To the left, label each pre-project site condition class found.<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

Attribute<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Habitat Type 1:<br />

Pre-<strong>Project</strong> 1004.75 735.57<br />

Stems 1118 stems/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

401.9 602.85<br />

1004.8<br />

294.228 441.34<br />

735.57<br />

0<br />

0<br />

105.2943699<br />

Post-<strong>Project</strong>, Low Impact Sites 1004.8 735.57 0<br />

Pre-<strong>Project</strong> 23.22 14.57<br />

Basal area 22.16<br />

Square<br />

meters/ha<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

9.288 13.932<br />

23.22<br />

5.828 8.742<br />

14.57<br />

0<br />

0<br />

59.73464331<br />

Post-<strong>Project</strong>, Low Impact Sites 23.22 14.57 0<br />

Pre-<strong>Project</strong> 9.07 9.5<br />

Mean tree height<br />

canopy<br />

9.98 Meter 0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

3.628 5.442<br />

9.07<br />

3.8 5.7<br />

9.5<br />

0<br />

0<br />

28.75396955<br />

Post-<strong>Project</strong>, Low Impact Sites 9.07 9.5 0<br />

Pre-<strong>Project</strong> 13.57 15.17<br />

Top height tree 14.54 Meter 0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

5.428 8.142<br />

13.57<br />

6.068 9.102<br />

15.17<br />

0<br />

0<br />

30.01936064<br />

Post-<strong>Project</strong>, Low Impact Sites 13.57 15.17 0<br />

Pre-<strong>Project</strong> 85.08 36.86<br />

Tree species density 83.63 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

34.032 51.048<br />

85.08<br />

14.744 22.116<br />

36.86<br />

0<br />

0<br />

110.0914366<br />

Post-<strong>Project</strong>, Low Impact Sites 85.08 36.86 0<br />

Pre-<strong>Project</strong> 0.033 0<br />

Propithecus<br />

diadema Density<br />

0.033<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0132 0.0198<br />

0.033<br />

0 0<br />

0<br />

0<br />

0<br />

95.22633<br />

Post-<strong>Project</strong>, Low Impact Sites 0.033 0 0<br />

Propithecus<br />

diadema<br />

vulnerability index<br />

123.3 0 0.05 NT<br />

Pre-<strong>Project</strong><br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

Post-<strong>Project</strong>, Low Impact Sites<br />

123.3<br />

49.32 73.98<br />

123.3<br />

123.3<br />

123.3<br />

49.32 73.98<br />

123.3<br />

123.3<br />

0<br />

0<br />

0<br />

62.59328907<br />

Pre-<strong>Project</strong> 0.025 0<br />

Allocebus trichotis<br />

density<br />

0.025 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.01 0.015<br />

0.025<br />

0 0<br />

0<br />

0<br />

0<br />

96.18821212<br />

Post-<strong>Project</strong>, Low Impact Sites 0.025 0 0<br />

Pre-<strong>Project</strong> 142.4 142.4<br />

Allocebus trichotis<br />

vulnerability index<br />

142.4 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

56.96 85.44<br />

142.4<br />

56.96 85.44<br />

142.4<br />

0<br />

0<br />

62.55290347<br />

Post-<strong>Project</strong>, Low Impact Sites 142.4 142.4 0<br />

Pre-<strong>Project</strong> 0.007 0<br />

Prolemur simus<br />

density<br />

0.007 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0028 0.0042<br />

0.007<br />

0 0<br />

0<br />

0<br />

0<br />

101.9291218<br />

Post-<strong>Project</strong>, Low Impact Sites 0.007 0 0<br />

Pre-<strong>Project</strong> 4.13 4.13<br />

Prolemur simus<br />

vulnerability index<br />

4.13 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

1.652 2.478<br />

4.13<br />

1.652 2.478<br />

4.13<br />

0<br />

0<br />

62.57364727<br />

Post-<strong>Project</strong>, Low Impact Sites 4.13 4.13 0<br />

Pre-<strong>Project</strong> 0.013 0<br />

Indri indri density 0.013 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0052 0.0078<br />

0.013<br />

0 0<br />

0<br />

0<br />

0<br />

94.64847026<br />

Post-<strong>Project</strong>, Low Impact Sites 0.013 0 0<br />

Pre-<strong>Project</strong> 31.12 31.12<br />

Indri indri<br />

vulnerability index<br />

31.12 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

12.448 18.672<br />

31.12<br />

12.448 18.672<br />

31.12<br />

0<br />

0<br />

62.56554363<br />

Post-<strong>Project</strong>, Low Impact Sites 31.12 31.12 0<br />

Pre-<strong>Project</strong> 0.8 14.05<br />

Deforestation rate 0<br />

Percentag<br />

e<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.32 0.48<br />

0.8<br />

5.62 8.43<br />

14.05<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.8 14.05 0<br />

<strong>Forest</strong><br />

…of Condition<br />

Class 3:<br />

Ponds<br />

1587.963 497.7<br />

0<br />

1587.963 497.7<br />

0<br />

0<br />

0 0<br />

Total Habitat<br />

Hectares Lost:<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in<br />

question…<br />

BENCHMARK<br />

Condition Class 1: Condition Class 2: Condition Class 3:<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

Good forest<br />

Condition/ Net<br />

Level Loss<br />

Disturbed<br />

Condition/ Net<br />

Level Loss<br />

Ponds<br />

Condition/ Net<br />

Level Loss<br />

Habitat<br />

Hectares Lost<br />

Rationale<br />

(enter comments explaining data in<br />

columns B to Q)<br />

Weight<br />

… of Condition<br />

Class 1:<br />

…of Condition Class<br />

2:<br />

Good forest Disturbed<br />

0 0 0<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

972<br />

Good forest is the average of : P.5,<br />

6, 9, 12, 14, & 18; Disturbed forest<br />

average of : P. 10 &20<br />

No mitigation Year _0


Appendix 3: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, April 2008 Iteration 85<br />

Habitat hectares lost <strong>–</strong> 75% mitigation<br />

CALCULATING BIODIVERSITY LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat<br />

Hectares)<br />

1. To the left, label each pre-project site condition class found.<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

Attribute<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Habitat Type 1:<br />

Pre-<strong>Project</strong> 1004.75 735.57<br />

Stems 1118 stems/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

753.5625 251.19<br />

1004.8<br />

551.6775 183.89<br />

735.57<br />

0<br />

0<br />

43.87265413<br />

Post-<strong>Project</strong>, Low Impact Sites 1004.8 735.57 0<br />

Pre-<strong>Project</strong> 23.22 14.57<br />

Basal area 22.16<br />

Square<br />

meters/ha<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

17.415 5.805<br />

23.22<br />

10.9275 3.6425<br />

14.57<br />

0<br />

0<br />

24.88943471<br />

Post-<strong>Project</strong>, Low Impact Sites 23.22 14.57 0<br />

Pre-<strong>Project</strong> 9.07 9.5<br />

Mean tree height<br />

canopy<br />

9.98 Meter 0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

6.8025 2.2675<br />

9.07<br />

7.125 2.375<br />

9.5<br />

0<br />

0<br />

11.98082065<br />

Post-<strong>Project</strong>, Low Impact Sites 9.07 9.5 0<br />

Pre-<strong>Project</strong> 13.57 15.17<br />

Top height tree 14.54 Meter 0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

10.1775 3.3925<br />

13.57<br />

11.3775 3.7925<br />

15.17<br />

0<br />

0<br />

12.50806693<br />

Post-<strong>Project</strong>, Low Impact Sites 13.57 15.17 0<br />

Pre-<strong>Project</strong> 85.08 36.86<br />

Tree species density 83.63 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

63.81 21.27<br />

85.08<br />

27.645 9.215<br />

36.86<br />

0<br />

0<br />

45.87143191<br />

Post-<strong>Project</strong>, Low Impact Sites 85.08 36.86 0<br />

Pre-<strong>Project</strong> 0.033 0<br />

Propithecus<br />

diadema Density<br />

0.033<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.02475 0.0083<br />

0.033<br />

0 0<br />

0<br />

0<br />

0<br />

39.6776375<br />

Post-<strong>Project</strong>, Low Impact Sites 0.033 0 0<br />

Propithecus<br />

diadema<br />

vulnerability index<br />

123.3 0 0.05 NT<br />

Pre-<strong>Project</strong><br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

Post-<strong>Project</strong>, Low Impact Sites<br />

123.3<br />

92.475 30.825<br />

123.3<br />

123.3<br />

123.3<br />

92.475 30.825<br />

123.3<br />

123.3<br />

0<br />

0<br />

0<br />

26.08053711<br />

Pre-<strong>Project</strong> 0.025 0<br />

Allocebus trichotis<br />

density<br />

0.025 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.01875 0.0063<br />

0.025<br />

0 0<br />

0<br />

0<br />

0<br />

40.07842172<br />

Post-<strong>Project</strong>, Low Impact Sites 0.025 0 0<br />

Pre-<strong>Project</strong> 142.4 142.4<br />

Allocebus trichotis<br />

vulnerability index<br />

142.4 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

106.8 35.6<br />

142.4<br />

106.8 35.6<br />

142.4<br />

0<br />

0<br />

26.06370978<br />

Post-<strong>Project</strong>, Low Impact Sites 142.4 142.4 0<br />

Pre-<strong>Project</strong> 0.007 0<br />

Prolemur simus<br />

density<br />

0.007 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.00525 0.0018<br />

0.007<br />

0 0<br />

0<br />

0<br />

0<br />

42.47046743<br />

Post-<strong>Project</strong>, Low Impact Sites 0.007 0 0<br />

Pre-<strong>Project</strong> 4.13 4.13<br />

Prolemur simus<br />

vulnerability index<br />

4.13 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

3.0975 1.0325<br />

4.13<br />

3.0975 1.0325<br />

4.13<br />

0<br />

0<br />

26.07235303<br />

Post-<strong>Project</strong>, Low Impact Sites 4.13 4.13 0<br />

Pre-<strong>Project</strong> 0.013 0<br />

Indri indri density 0.013 number/ha 0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.00975 0.0033<br />

0.013<br />

0 0<br />

0<br />

0<br />

0<br />

39.43686261<br />

Post-<strong>Project</strong>, Low Impact Sites 0.013 0 0<br />

Pre-<strong>Project</strong> 31.12 31.12<br />

Indri indri<br />

vulnerability index<br />

31.12 0 0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

23.34 7.78<br />

31.12<br />

23.34 7.78<br />

31.12<br />

0<br />

0<br />

26.06897651<br />

Post-<strong>Project</strong>, Low Impact Sites 31.12 31.12 0<br />

Pre-<strong>Project</strong> 0.8 14.05<br />

Deforestation rate 0<br />

Percentag<br />

e<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.6 0.2<br />

0.8<br />

10.5375 3.5125<br />

14.05<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.8 14.05 0<br />

<strong>Forest</strong><br />

…of Condition<br />

Class 3:<br />

Ponds<br />

1587.963 497.7<br />

0<br />

1587.963 497.7<br />

0<br />

0<br />

0 0<br />

Total Habitat<br />

Hectares Lost:<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in<br />

question…<br />

BENCHMARK<br />

Condition Class 1: Condition Class 2: Condition Class 3:<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

Good forest<br />

Condition/ Net<br />

Level Loss<br />

Disturbed<br />

Condition/ Net<br />

Level Loss<br />

Ponds<br />

Condition/ Net<br />

Level Loss<br />

Habitat<br />

Hectares Lost<br />

Rationale<br />

(enter comments explaining data in<br />

columns B to Q)<br />

Weight<br />

… of Condition<br />

Class 1:<br />

…of Condition Class<br />

2:<br />

Good forest Disturbed<br />

0 0 0<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

405<br />

Good forest is the average of : P.5,<br />

6, 9, 12, 14, & 18; Disturbed forest<br />

average of : P. 10 &20<br />

No mitigation Year _0


Appendix 3: Key Biodiversity Components Matrix (KBCM) and Habitat Hectares Score, April 2008 Iteration 86<br />

Habitat hectares lost <strong>–</strong> 90% mitigation<br />

CALCULATING BIODIVERSITY LOSS AT IMPACT SITE<br />

(Quantifcation of Biodiversity Loss Through <strong>Project</strong> Impact, via Habitat<br />

Hectares)<br />

1. To the left, label each pre-project site condition class found.<br />

Attribute<br />

Stems<br />

Basal area<br />

Mean tree height<br />

canopy<br />

Top height tree 14.54 Meter<br />

Tree species density 83.63 number/ha<br />

Propithecus<br />

diadema Density<br />

Propithecus<br />

diadema<br />

vulnerability index<br />

Allocebus trichotis<br />

density<br />

Allocebus trichotis<br />

vulnerability index<br />

Prolemur simus<br />

density<br />

Prolemur simus<br />

vulnerability index<br />

Deforestation rate 0<br />

31.12 0 0.05<br />

Percentag<br />

e<br />

Each Site Class…<br />

Post-<strong>Project</strong>, High Impact Sites…<br />

Post-<strong>Project</strong>, Medium Impact Sites…<br />

Post-<strong>Project</strong>, Low Impact Sites…<br />

Condition/<br />

Level<br />

Pre-<strong>Project</strong> 1004.75 735.57<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

904.275 100.48<br />

1004.8<br />

662.013 73.557<br />

735.57<br />

0<br />

0<br />

17.54906165<br />

Post-<strong>Project</strong>, Low Impact Sites 1004.8 735.57 0<br />

Pre-<strong>Project</strong> 23.22 14.57<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

20.898 2.322<br />

23.22<br />

13.113 1.457<br />

14.57<br />

0<br />

0<br />

9.955773885<br />

Post-<strong>Project</strong>, Low Impact Sites 23.22 14.57 0<br />

Pre-<strong>Project</strong> 9.07 9.5<br />

0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

8.163 0.907<br />

9.07<br />

8.55 0.95<br />

9.5<br />

0<br />

0<br />

4.792328259<br />

Post-<strong>Project</strong>, Low Impact Sites 9.07 9.5 0<br />

Pre-<strong>Project</strong> 13.57 15.17<br />

0.025 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

12.213 1.357<br />

13.57<br />

13.653 1.517<br />

15.17<br />

0<br />

0<br />

5.003226773<br />

Post-<strong>Project</strong>, Low Impact Sites 13.57 15.17 0<br />

Pre-<strong>Project</strong> 85.08 36.86<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

76.572 8.508<br />

85.08<br />

33.174 3.686<br />

36.86<br />

0<br />

0<br />

18.34857277<br />

Post-<strong>Project</strong>, Low Impact Sites 85.08 36.86 0<br />

Pre-<strong>Project</strong> 0.033 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0297 0.0033<br />

0.033<br />

0 0<br />

0<br />

0<br />

0<br />

15.871055<br />

Post-<strong>Project</strong>, Low Impact Sites 0.033 0 0<br />

Pre-<strong>Project</strong> 123.3 123.3<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

110.97 12.33<br />

123.3<br />

110.97 12.33<br />

123.3<br />

0<br />

0<br />

10.43221485<br />

Post-<strong>Project</strong>, Low Impact Sites 123.3 123.3 0<br />

Pre-<strong>Project</strong> 0.025 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0225 0.0025<br />

0.025<br />

0 0<br />

0<br />

0<br />

0<br />

16.03136869<br />

Post-<strong>Project</strong>, Low Impact Sites 0.025 0 0<br />

Pre-<strong>Project</strong> 142.4 142.4<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

128.16 14.24<br />

142.4<br />

128.16 14.24<br />

142.4<br />

0<br />

0<br />

10.42548391<br />

Post-<strong>Project</strong>, Low Impact Sites 142.4 142.4 0<br />

Pre-<strong>Project</strong> 0.007 0<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0063 0.0007<br />

0.007<br />

0 0<br />

0<br />

0<br />

0<br />

16.98818697<br />

Post-<strong>Project</strong>, Low Impact Sites 0.007 0 0<br />

Pre-<strong>Project</strong> 4.13 4.13<br />

0.05 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

3.717 0.413<br />

4.13<br />

3.717 0.413<br />

4.13<br />

0<br />

0<br />

10.42894121<br />

Post-<strong>Project</strong>, Low Impact Sites 4.13 4.13 0<br />

Pre-<strong>Project</strong> 0.013 0<br />

NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.0117 0.0013<br />

0.013<br />

0 0<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.013 0 0<br />

Pre-<strong>Project</strong> 31.12 31.12<br />

NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

28.008 3.112<br />

31.12<br />

28.008 3.112<br />

31.12<br />

0<br />

0<br />

10.4275906<br />

Post-<strong>Project</strong>, Low Impact Sites 31.12 31.12 0<br />

Pre-<strong>Project</strong> 0.8 14.05<br />

0.1 NT<br />

Post-<strong>Project</strong>, High Impact Sites<br />

Post-<strong>Project</strong>, Medium Impact Sites<br />

0.72 0.08<br />

0.8<br />

12.645 1.405<br />

14.05<br />

0<br />

0<br />

0<br />

Post-<strong>Project</strong>, Low Impact Sites 0.8 14.05 0<br />

Indri indri density 0.013 number/ha 0.1 15.77474504<br />

Indri indri<br />

vulnerability index<br />

(Three or less. e.g. "pristine", "good", "degraded", or "good", "poor", etc.)<br />

1118<br />

22.16<br />

9.98<br />

0.033<br />

2. Fill in the area of …<br />

(enter "0" for non-relevent<br />

condition classes and<br />

impact levels)<br />

stems/ha<br />

Square<br />

meters/ha<br />

Meter<br />

123.3 0 0.05 NT<br />

0.025 number/ha<br />

142.4 0<br />

0.007 number/ha<br />

4.13 0<br />

Weight<br />

… of Condition<br />

Class 1:<br />

Good forest<br />

…of Condition Class<br />

2:<br />

Disturbed<br />

1587.963 497.7<br />

1587.963 497.7<br />

…of Condition<br />

Class 3:<br />

Ponds<br />

0 0 0<br />

BENCHMARK<br />

Condition Class 1: Condition Class 2:<br />

Reference Level<br />

Units/<br />

#<br />

Bands<br />

Trad'ble/<br />

Non?<br />

(T/NT)<br />

Pre/Post-<strong>Project</strong> Conditions<br />

Good forest<br />

Condition/ Net<br />

Level Loss<br />

Disturbed<br />

Condition/ Net<br />

Level Loss<br />

0<br />

Habitat Type 1:<br />

<strong>Forest</strong><br />

0<br />

0 0<br />

Condition Class 3:<br />

Ponds<br />

Net<br />

Loss<br />

Total Habitat<br />

Hectares Lost:<br />

3. For each relevant condition class and impact level below, please fill in the condition/level of the attribute in<br />

question…<br />

0<br />

Habitat<br />

Hectares Lost<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

162<br />

Rationale<br />

(enter comments explaining data in<br />

columns B to Q)<br />

Good forest is the average of : P.5,<br />

6, 9, 12, 14, & 18; Disturbed forest<br />

average of : P. 10 &20<br />

No mitigation Year _0


Appendix 4: Mine Footprint Status Sheet,<br />

2nd Iteration<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

87


Appendix 4: Mine Footprint Status Sheet, 2 nd Iteration 88<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 4: Mine Footprint Status Sheet, 2 nd Iteration 89<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 4: Mine Footprint Status Sheet, 2 nd Iteration 90<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 5: Vulnerability Index<br />

VULNERABILITY can be expressed based on:<br />

Geographical range (largely, more restricted),<br />

Level of habitat types dependence (more ubiquiste to stenocene species etc.), and<br />

Abundance indices (rare to common) (Kattan 1992; Rabinowitz et al. 1986).<br />

The approach used allows the offset planner to attribute an index score in each cell of the matrix in order to<br />

represent the vulnerability level of each species based on above parameters. For a community, the<br />

percentage of species constituting its total number could be included in a cell in order to indicate how<br />

vulnerable a community is. The original concept of the vulnerability matrix following (Rabinowitz et al. 1986) is<br />

presented below, where Vi is the vulnerability index.<br />

Abundance<br />

Range (geographical distribution)<br />

Large Restricted<br />

Habitat type<br />

dependence level Ubiquiste Stenocene Ubiquiste Stenocene<br />

Common Vi=8 Vi=6 Vi=4 Vi=2<br />

Rare Vi=7 Vi=5 Vi=3 Vi=1<br />

In order to ensure that the matrix is properly used as part of the calculation of loss and gain of biodiversity, the<br />

following points must be taken into consideration:<br />

Since the BENCHMARK approach is based on the principle that higher values are better in the habitat<br />

hectares calculations, higher index values should be given with increased vulnerability (e.g. Vi= 1 becomes<br />

Vi = 8 etc…).<br />

The BBOP ‘Key Biodiversity Component Matrix (KBCM) ‘Irreplaceability’ level (Widespread, Localised, SITE<br />

ENDEMIC) will be used instead of ‘Range’ (geographical distribution); and<br />

The KBCM ‘Significance level’ Global column will consider (CR, EN, VU, NT) instead of using ‘habitat type<br />

dependence level’.<br />

Thus the Vulnerability matrix concept proposed for BBOP is:<br />

IUCN Status<br />

Irreplaceability : Widespread Localised Site endemic<br />

Abundance level: Common Rare Common Rare Common Rare<br />

LC 1 4 11 16 21 26<br />

NT 2 5 12 17 22 27<br />

VU 3 6 13 18 23 28<br />

EN 7 8 14 19 24 29<br />

CR 9 10 15 20 25 30<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

91


Appendix 5: Vulnerability Index 92<br />

There are several ways to obtain ATTRIBUTES from the species Vulnerability matrix:<br />

1. Fit all KBCM fauna and flora species into the matrix and assign a Vi number (1 to 30) and then simply<br />

compare to the total number of species in the community considered with how many have specific Vi<br />

numbers.<br />

2. Determine the % of species with specific Vi numbers. For example, for all tree species assume that 30% of<br />

those recorded in the benchmark have a Vi of 19 (EN, rare, localised), equating to 30% x 19 = 57. This can<br />

be repeated for other Vi indices and finally a sum for the entire matrix table can be generated (for example<br />

560). This value of 560 can then be compared with values for tree species from the impact site etc.<br />

3. Taking a smaller community group, e.g. all lemur species, and proceed as above, assigning each species<br />

a Vi score and then multiplying it with species biological data (e.g. density / ha) in order to obtain a sum for<br />

each site. The higher the total Vi score is, the higher is the vulnerability of this group (note that the density<br />

in the excel table is set at 1 until further data is collected during subsequent at <strong>Ambatovy</strong>).<br />

The Vulnerability matrix developed by <strong>Ambatovy</strong> is presented below. This matrix was developed in April 2008,<br />

as part of the second iteration of the benchmark and loss assessment 7 .<br />

Table A5.1: Fauna and flora species Vulnerability matrix (April 2008)<br />

IUCN Status<br />

Irreplacebility :<br />

Abundance level:<br />

Nocturnal/diurnal<br />

Ability to move away<br />

Widespread<br />

Localised<br />

Common<br />

Rare<br />

Common<br />

Rare<br />

Diunral Nocturnal Diunral Nocturnal Diurnal Nocturnal Diurnal Nocturnal<br />

Site endemic<br />

Common Rare<br />

Diurnal Nocturnal Diurnal Nocturnal<br />

from impact Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N<br />

LC 1 4 7 10 13 16 19 22 41 46 51 56 61 66 71 76 81 86 91 96 101 106 111 116<br />

NT 2 5 8 11 14 17 20 23 42 47 52 57 62 67 72 77 82 87 92 97 102 107 112 117<br />

VU 3 6 9 12 15 18 21 24 43 48 53 58 63 68 73 78 83 88 93 98 103 108 113 118<br />

EN 25 26 27 28 29 30 31 32 44 49 54 59 64 69 74 79 84 89 94 99 104 109 114 119<br />

CR 33 34 35 36 37 38 39 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120<br />

A worked example of the application of the matrix to the <strong>Ambatovy</strong> KBCM is presented below (extract of<br />

<strong>Ambatovy</strong> <strong>Project</strong> BBOP Bonn report (April 2008)).<br />

Table A5.2: Key Biodiversity Components Matrix (KBCM) Vulnerability scores (April 2008)<br />

Site<br />

Diurnal/Noct: Moves: Vulnerabilty<br />

Amabtovy KBCM Species IUCN Widespread Localised endemic Rare D/N Y/N indices'<br />

Prolemur simus CR<br />

X X 65<br />

Propithecus d. diadema CR<br />

X<br />

Indri indri EN X<br />

Lemurs Allocebus trichotis EN<br />

X X 74<br />

Daubentonia madagascarensis EN<br />

X<br />

Eulemur rubriventer VU X<br />

Birds Tyto soumagnei EN X<br />

Platypelis sp. nov NE X<br />

Scaphiophryne marmorata VU X<br />

Rhombophryne coronata VU X<br />

Mantella aurantiaca<br />

Herptiles<br />

Mantella crocea<br />

CR<br />

EN<br />

X<br />

X<br />

Mantidactylus plicifer NT X<br />

Pararhadinaea sp.nov NE X<br />

Sanzinia madagascariensis VU X<br />

Ratsirakia sp NE ?<br />

Fish Rheocles sp NE ?<br />

Aloe leandri NE X<br />

Asteropeia micraster EN X<br />

Plants<br />

Leptolaena multiflora<br />

Dalbergia baroni<br />

EN<br />

VU<br />

X<br />

X<br />

Cyathea dregei NE X<br />

Cyathea cf tsaratananensis NE ?<br />

7 <strong>Ambatovy</strong> <strong>Project</strong> BBOP Bonn report (April 2008), with revised Benchmark selection and losses calculations, including KBCM matrix<br />

update with species quantitative data).<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 5: Vulnerability Index 93<br />

Note that the results of the Biodiversity Assessment in relation to intrinsic NON-USE VALUES and USE VALUES are<br />

presented in the KBCM sheet of the April 2008 report.<br />

December 2008 iteration: the <strong>Project</strong> believes that the use of the Vulnerability attributes still requires more in<br />

depth analysis, which will be conduced in 2009: the justifications for excluding the vulnerability index in the<br />

December 2008 calculations are that:<br />

This attribute should be calculated by taxonomic group not by single species as was done in the April 2008<br />

report: this index is a product of the combination of the IUCN status and that of relative abundance;<br />

Abundance is already considered in the other attributes for each species. Calculating the vulnerability<br />

index by taxonomic group (not single species) will give a greater ‘overall scope’ of the vulnerability and<br />

irreplaceability:<br />

<strong>–</strong> The index will provide a more scientific approach to determining the group requiring most effort for onsite<br />

conservation relative to other selected species.<br />

<strong>–</strong> It gives first same value (weight) for the various taxonomic groups. In fact not only species must avoid<br />

EXTIRPATION, but also the overall ecosystem characteristics should be offset. Among the latter is the<br />

community composition that can be tackled through a biodiversity vulnerability index. Furthermore, a<br />

gain on the vulnerability index by a taxonomic group will be more significant for biodiversity and<br />

ECOSYSTEM SERVICES than a gain for a single species.<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops<br />

Volume J<br />

Section 1.1<br />

Attachment 2<br />

Survey for off-site azonal outcrops<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

94


Appendix 6: Survey for Off-site Azonal Outcrops 95<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 96<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 97<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 98<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 99<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 100<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 101<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 102<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 103<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 104<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 105<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 106<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 107<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 108<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 109<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 110<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 111<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 112<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 113<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 6: Survey for Off-site Azonal Outcrops 114<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong>


Appendix 7: Comparison of <strong>Ambatovy</strong> / Analamay and<br />

Ankerana Azonal Habitats<br />

BBOP Pilot <strong>Project</strong> Case Study <strong>–</strong> <strong>Ambatovy</strong> <strong>Project</strong><br />

115


To learn more about the BBOP principles, guidelines and optional methodologies, go to:<br />