12.07.2015 Views

2012/06/29 Commencement of gas supply to Kashima thermal ...

2012/06/29 Commencement of gas supply to Kashima thermal ...

2012/06/29 Commencement of gas supply to Kashima thermal ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

June <strong>29</strong>, <strong>2012</strong><strong>Commencement</strong> <strong>of</strong> <strong>gas</strong> <strong>supply</strong> <strong>to</strong> <strong>Kashima</strong> <strong>thermal</strong> power station <strong>of</strong> Tokyo Electric Power Company-Completion <strong>of</strong> construction work for high-pressure <strong>gas</strong> pipeline, “<strong>Kashima</strong> Waterfront Line”-Tokyo Gas Co., Ltd.Tokyo Gas Co., Ltd. (President : Mr. Tsuyoshi Okamo<strong>to</strong>, hereafter “Tokyo Gas”) has completed theconstruction work <strong>of</strong> high-pressure <strong>gas</strong> pipeline, “<strong>Kashima</strong> Waterfront Line” (hereafter “the Line”) onMay 22, <strong>2012</strong>, and <strong>to</strong>day started full-scale <strong>gas</strong> <strong>supply</strong> <strong>to</strong> <strong>Kashima</strong> <strong>thermal</strong> power station <strong>of</strong> TokyoElectric Power Company (hereafter “TEPCO”).With the request from TEPCO, the Line has been under construction in Kamisu city, Ibaraki prefecture,since August 2011, in order for Tokyo Gas <strong>to</strong> <strong>supply</strong> city <strong>gas</strong> <strong>to</strong> the newly installed <strong>gas</strong> turbinegenera<strong>to</strong>rs on the site <strong>of</strong> TEPCO’s <strong>Kashima</strong> <strong>thermal</strong> power station.Tokyo Gas carried out construction work <strong>to</strong> extend its high-pressure <strong>gas</strong> pipeline “Chiba <strong>Kashima</strong> Line”,which had been completed on March 2, <strong>2012</strong>, by 4.4 kilometers from its terminus called <strong>Kashima</strong>governor station <strong>to</strong> TEPCO’s <strong>Kashima</strong> <strong>thermal</strong> power station.Tokyo Gas has supplied city <strong>gas</strong> since June 6, <strong>2012</strong>, for the trial operation for the newly installed <strong>gas</strong>turbine genera<strong>to</strong>rs on the site <strong>of</strong> TEPCO’s <strong>Kashima</strong> <strong>thermal</strong> power station, and <strong>to</strong>day started full-scale<strong>gas</strong> <strong>supply</strong> in accordance with the commencement <strong>of</strong> the newly installed <strong>gas</strong> turbine genera<strong>to</strong>rs.Tokyo Gas keeps exerting maximum effort <strong>to</strong> make a contribution on relaxing the <strong>supply</strong> and demand<strong>of</strong> electricity, as a business entity playing a role <strong>of</strong> energy <strong>supply</strong> in the Metropolitan region.Start / TerminusAddress: Towada, Kamisu city, Ibaraki prefectureStart: Tokyo Gas <strong>Kashima</strong> governor stationTerminus: Towada block bulb station, TEPCO <strong>Kashima</strong> <strong>thermal</strong> power stationPressure / Diameter 7MPa / 600 mmExtended length4.4 kmConstruction start August 8, 2011Construction end May 22, <strong>2012</strong>Supply start (Opening) June 6, <strong>2012</strong>


【Reference】Construction site image <strong>of</strong> <strong>Kashima</strong> Waterfront LineTowada block bulb station (TEPCO <strong>Kashima</strong>)東 茨 和 城 田 県 ブロックバルブステーション( 東 京 (TE 電 力 鹿 島 火 力 火 発 力 電 所 ) )鹿 島 ガバナステーション<strong>Kashima</strong> governor station鹿 島 臨 海 ライン(7MPa,600A,4.4 km)<strong>Kashima</strong> Waterfront Line千 葉 幹 線Chiba Line千 葉 ~ 鹿 島 ラインChiba <strong>Kashima</strong> Line御 殿 ブランチステーションGoten branch station

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!